preview

Capstone Project Analysis

Better Essays

The project, “Monitoring pain in individuals who are nonverbal using a video-based algorithm and Android application”, was proposed by the Seven Hills Foundation for their patients with Cerebral Palsy or degenerative muscle disorders. These patients are often nonverbal, confined to a bed, and unable to inform a caregiver of their pain. The objective of our capstone project is to develop a pain detector for use in individuals who lack the ability to communicate their pain level. To provide caretakers the ability to know if a patient is in pain, we plan to create a more objective and quantitative method to evaluate pain. Using an Android application, we are designing and implemented an algorithm to process a video of the user’s face to …show more content…

It includes steps for failure mode analysis and examples of forms to use when performing such an analysis. ISO/IEC/IEEE 24765:2017(E) - ISO/IEC/IEEE International Standard - Systems and software engineering--Vocabulary This engineering standard provides a standardized collection of terminology related to systems and software engineering, as well as references to other source standards where the included terms may be actively defined. IEEE Std 982.1-2005 (Revision of IEEE Std 982.1-1988) - IEEE Standard Dictionary of Measures of the Software Aspects of Dependability This engineering standard informs measurements of software dependability, including maintainability and accessibility. IEEE Std 1012-2016 (Revision of IEEE Std 1012-2012/ Incorporates IEEE Std 1012-2016/Cor1-2017) - IEEE Standard for System, Software, and Hardware Verification and Validation This engineering standard provides guidelines for verification and validation processes that can be applied to hardware, software, or systems. These processes include reviewing, analyzing, and testing the project to ensure that it is intended and able to produce the desired outcome. Each individual member of this project has a different job title. Rachel Bellisle is the Project Manager, Jessika Decker is the Hardware Engineer, and John McLinden is the Software Engineer. Each team member was responsible for completing the duties of their assigned role, but all team members worked together on

Get Access