1- Learning Curve Suppose in a production run of a certain product it is observed that the cumulative hours required to produce 100 units is 100,000 h with a learning curve effect of 85%. For project planning purposes, an analyst needs to calculate the number of hours spent in producing the fiftieth unit.
Q: azmine Peters, the operations manager at Frontiers Inc., wants to estimate the learning rate for a…
A: ANSWER IS GIVEN BELOW:
Q: The juicer mixer takes 11.5 hours for production of 1 unit, where learning curve rate is 87% and…
A: Time taken by 1st unit = 11. 5 hours Learning curve rate = 87% or 0.87 To be determined - total…
Q: You need to develop a labor time estimate for a customerorder of 20 network installations. It is…
A: Given Customer order - 20 network installation first installation requires 60 hours of labor…
Q: Boeing spent $250 million to make the 12th 787 in its production line. The first 787 cost $438…
A: An learning curve is a concept that graphically portrays the connection between the cost and output…
Q: For an 80% learning curve, if the 100th unit produced required 280 hours, how long will it take to…
A: In learning curve, we use the formulae: Tn = T1 × nb where,Tn = Time for the 'nth' unit T1 = Time…
Q: You need to develop a labor time estimate for a customer order of 50 network installations. It is…
A: Tn = T1 x nb b = ln (learning percentage) / ln(2) where ln stands for natural logarithm…
Q: In Alcc ltd. The first 18 units takes 17 hours for production with learning curve rate is 74% ,…
A: Given: 1st unit = 17 Hours for production Learning curve rate = 74% To be determined: Total time…
Q: National Company is planning to introduce a new product with an 90 percent learning rate for…
A: Learning is the interaction by which anybody acquires information, abilities, and capacity. For…
Q: An aircraft company has an order to refurbish the interiors of 18 jet aircraft. The work has a…
A: Given, The time required to the refurbishment of the first plane (T1) = 300 hours Number of aircraft…
Q: The fifth unit of a 10-unit job took five hours to complete. The sixth unit has been worked on…
A: In the given problem, it has been stated that among the 10 units 5 units have already completed and…
Q: Consider a Time required to produce 1ª" PC Unit is 30minutes with learning curve rate is 85% 1-…
A: Given data is Time for the first unit = 30 minutes Learning curve = 85% Labor cost = $50 per hour
Q: In essay form,,, what do you think is the relevance of learning curve to work productivity? Thank…
A: A learning curve is an idea that graphically portrays the connection between the expense and yield…
Q: Aqeel bought 6 bookcases for his place. Each required unpacking of parts and assembly, which…
A: It is given that: The first bookcase was completed in = 5 hours The second bookcase was completed in…
Q: The company zutsu takes 30.7 hours for production of 1 unit of a chemical box, where learning curve…
A: The time taken by 1 unit of chemical box = 30.7 hours Learning Curve = 97% or 0.97 To be…
Q: The 4th unit of a 10-unit job took seven hours to complete. The 6th unit has been worked on for two…
A: The learning curve : It states that the time per unit decrease constantly as the output increases to…
Q: The z product company takes 2.5 hours for 1 unit of product , if an 81% learning curve is used and 4…
A: 1st Unit = 2.5 Hours learning curve rate = 81% or 0.81 To be determined- The total cumulative time…
Q: Trhh Ltd. Manufacturers cars and 1 unit takes 21.5 hours for production, with learning curve of 67%…
A: Time of 1st Unit = 21.5 Hours Learning Curve = 67% or 0.67 To be determined - The Time of the 4th…
Q: NUBD, is beginning the production of a new product. Management believes that 500 labor hours will be…
A: Find the given details below: Given details Time taken for first unit (T1) 500 hours Learning…
Q: Suppose in a production run of a certain product it is observed that the cumulative hours required…
A: Given, Y=Cumulative hours required to produce 100 units =100,000 h a=Time required to produce the…
Q: Describe what are some of the various limitations of a learning curve ?
A: The learning curve is predicated on the supposition that if a person repeats a task or job…
Q: Semetic Inc. Had developed a new product for marine ships that includes the production of a complex…
A: Given: Time taken by 1st unit - 11500 Labour hours Learning curve rate - 82% or 0.8 To be…
Q: How many direct hours are required to produce the 30th unit? How many total hours are needed to…
A:
Q: The 4th unit of a 10-unit job took seven hours to complete. The 6th unit has been worked on for two…
A: This question is related to the topic of Learning curves and this topic falls under the operations…
Q: An activity is known to have an 80 percent learning curve. It has taken a worker 10 hoursto produce…
A: Formula:
Q: A contractor intends to bid on a job installing 30 airport security systems. Because this will be a…
A:
Q: 3-1 Assuming that the data given below is information in the learning curve for an employee in…
A: The question is related to Learning Curve. The details are given.
Q: A contractor intends to bid on a job installing 30 airport security systems. Because this will be a…
A: Total time factor for 85 percent learning curve and unit of 10 is 7.116.
Q: Company, is beginning the production of a new product. Management believes that 500 labor hours will…
A: Given data is Learning rate = 85% q = -0.2345 Labor hours (a)= 500
Q: The 2nd unit of a 10-unit job took eight hours to complete. The 6th unit has been worked on for two…
A: Given data: The 2 nd unit of a 10 unit job took 8 hours to complete T2= 8 hours The 6 th unit for 2…
Q: Understand what a learning curve is and where learning curves are applicable?
A: The learning curve can be defined as the presence of the nature of individuals to be able to perform…
Q: National Company is planning to introduce a new product with an 85 percent learning rate for…
A: Learning curve perception implies that the utilization of time will decrease as the creation of a…
Q: A manager wants to determine an appropriate learning percentage for processing insurance claims for…
A: Given data: Repetition 1 2 3 4 5 6 Time (minutes) 50 46 43 38 37 34
Q: A manager wants to estimate the remaining time that will be needed to complete a five-unit job. The…
A: The remaining time that will be needed to complete a five-unit job The initial unit of the job…
Q: Why isn't the learning-curve concept as applicable in a high-volume assembly line as it is in most…
A: learning-curve concept:
Q: What would a learning percentage of 120 percent imply?
A: A learning rate of 120 percent implies that
Q: A job is known to have a learning percentage equal to 82. If the first unit had a completion time…
A: Formula:
Q: What are the various techniques that a firm can use to move to a faster learning curve ?
A: To be determined: The methods used by a corporation to generate a steeper learning curve.
Q: What techniques can a firm use to move to a steeper learning curve?
A: Definition: - A graphical technique to analyze and evaluate a person, product, or service expertise…
Q: Make time estimates based on learning curves
A: Lets imagine that we have T1=10 hours and P=0.90. The production time for the first 10 units are:
Q: a) The approximate learning curve rate = % (round your response to the nearest whole number). %3D b)…
A: Learning rate (LR) = (Time required for 2nd unit/Time required by 1st unit) * 100 Doubling…
Q: Predict how human learning will affect task times and cost in the learning curve application of…
A: Human performance of activities shows improvement when we do the activities repetitively . The…
Q: A new training program at Arid Industries is intended to lower the learning-curve coefficient of a…
A: Given data is Intention = lower learning curve coefficient Current cost = $95.50/hr Current…
Q: When the rate of output and the total average direct labour have doubled per time What is the…
A: Tools and methods for the procurement and supply chain analysis: It is important to have the right…
Q: The product tesla takes 89.88 hours for production of 1 unit, where learning curve rate is 87% and…
A: Manufacturing can be defined as the process in which raw materials are converted into finished goods…
Q: Estimate the amount of time needed to complete
A: Number of jets to refurbish = 18 Learning curve in percentage = 80 First refurbish plan requirement…
Q: 1 unit of a toy production takes 1080 hours, and the learning curve rate is 76% than what is the…
A: Time Taken for 1 unit of Production = 1080 Hours Learning curve rate = 76% or 0.76 n = 2 To be…
Step by step
Solved in 2 steps
- Freed works for a traditional company that expects him to start at 8.30 a.m. and leave at 5.30 p.m. or later every day. Most of his work is done on a project basis and, as a manager, he is responsible for the quality of work that is produced and for meeting deadlines, as the nature of his work involves meeting deadlines, achieving certain objectives, and hitting targets. On most days of the week, there is often extra work to be done on a project, and Freed stays late in the office or brings his work home. Occasionally, his director and colleagues find him missing important information in a meeting because he was thinking about something else.People sometimes think about something other than what they’re doing. Their minds wander, whether they are trying to read important emails, speaking to clients, updating the sales figures, or talking to colleagues, creating barriers in communication not only for themselves but also their receivers. Justify this statement in keeping with the…Assignment Task 2 – Discussion Paper Each inductee is required to produce a Discussion Paper for use in one of the induction sessions. The title of your Discussion Paper is ‘Explain how leadership and management styles change to meet the needs of business situations’. Your Discussion Paper must include: an explanation of how leadership and management styles should change to meet the needs of different situations found in organisations. LO1 AC 1.3 Guidelines for assessors The assignments submitted by learners must achieve the learning outcomes and meet the standards specified by the assessment criteria for the unit. To achieve a merit or distinction grade, the learners must demonstrate that they have achieved all the criteria set for these grades. Where work for the pass standard is marginal, assessors can take account of any extension work completed by the learners. The suggested evidence listed below is how learners can demonstrate that they have met the required…An air filtration system for CFF Food Market was design within a certain time frame in order that the company would not be closed down by EPA. a. Create a table with at least 10 random numbers for pessimistic, most likely and optimistic time b. Use the variables to determine the Expected Time and Variance (show working) c. Assume a critical path, and variables on the path to determine the standard deviation
- A bar chart shows the number and type of resources you need throughoutyour project is called a _______________.A. Organizational ChartB. Resource histogramC. Resource ScheduleD. Staffing Timetable You have identified an opportunity to potentially increase the project’s value.Which of the following is an example of enhancing that opportunity?A. By taking additional actions, you increase the potential reward without reducing itsprobabilityB. By forming a partnership with another company, the project’s value will increase forboth companiesC. By taking out insurance, you can reduce potential costs to the projectD. By documenting the opportunity in the register, you can keep track of it and ensureit gets exploitedIn Week 3, each team will use their group pages tools (discussion fora, Pages) to prepare 10 written questions (interrogatories), 5 requests for production of documents, and 5 requests to admit to the other party. For our purposes, Manley will be a witness at the simulation and you can send him (me) some interrogatories if you like, but are not required to do so. (That means, each team will write a total of 20 discovery requests--questions, document request, or request for admission). Each group leader will submit the discovery here via link.Business Ethics (MGT 610)Assignment# 12 Semester Spring 2016Assignment No. 12FALL SEMESTER 2016MGT610- Business EthicsMarks40Student ID/Login ID:Student Name:Date:__________________________________________________________Please read the following instructions carefully before attempting the assignment:â¢Assignment covers lesson no.01-09â¢Last date for submission of solution 1 is 28/7/2016â¢10-15pages.â¢All instruction will be considered during checking assignment. So, consider allthese.â¢Use the standard format for preparing assignment. Use MS word 2003 or previousversion for your solution other format will not be acceptedâ¢Give the answer according to question, no mark will be given for irrelevantmaterial.â¢Donât rely only on handouts, use other reference books also.â¢Mention the source which u are using for preparing your…
- Consider a project to produce custom door moldingsfor GMC Acadia cross-over vehicles, described inTable 7.4. a. If you start the project immediately, when will it be finished?b. You are interested in completing your project as soon aspossible. You have only one option. Suppose you couldassign Employee A, currently assigned to activity G, tohelp Employee B, currently assigned to activity F. Eachweek that Employee A helps Employee B will result inactivity G increasing its time by one week and activity Freducing its time by one week. How many weeks shouldEmployee A work on activity F?Completion of three activities is required to accomplish a job. The administrator would liketo know if differences in the arrangement of the three activities results in different jobaccomplishment times. He selects three workers and demonstrates the activities in random orderto them. Then each worker accomplishes the job with each of the activity arrangements. Thecompletion times are recorded. The following table shows the minutes for each worker toaccomplish each job. Arrangements Workers Time Consumed (minutes) Mr. X Mr. Y Mr. ZA 22.4 18.6 21.5B 19.2 20.2 20.7C 20.3 17.0 20.4 Using one percent level of significance, answer following questions:i. Is there a difference in job accomplishment times among different arrangements?ii. Is there a difference in job accomplishment times between the workers?37-Mr. Zubair is responsible for analyzing vacant positions in his company, preparing job advertisements and publishing them in the newspaper. While Mr. Asim is responsible for screening the application form and taking interviews with the prospective candidates. Based on this information, which of the following is incorrect? Mr. Zubair has to complete his work before Mr. Asim can start his work Mr. Zubair job responsibility is about attracting suitable candidates and Mr. Asim job responsibility is about the assessment of the candidates Mr. Zubair can only start his work once Mr. Asim complete his work Mr. Zubair belongs to the recruitment function and Mr. Asim belongs to the selection function.
- According to the 66178 standard, it is vital that improvement projects a. incude external advisors in order to give the broadcast possible view of the project b. seek to introduce the timescales in order to optimize the time variable c. involve all members of the organization who have any links to the processA #2 pencil (P) is made from a wood subassembly (WS), a band (B) to hold the eraser on and an eraser (E). The wood subassembly is made from 2 wood halves (WH) and a piece of lead (L), the wood halves are made from wood blanks (WB). (For this question we will ignore the need for glue and paint.) The lead times for each of these are given below Lead Time (Weeks) P 2 WS 4 B 6 E 2 WH 2 L 2 WB 1 If nothing is in inventory (that is, all on hand quantities are equal to zero), and it is now the beginning of period 20, then when is the earliest that we can promise to ship No. 2 pencils?9. Dana is 30 years old and owns a wedding planning business. She takes care of all wedding events details from arranging flowers, tables, theme to catering food to a high standard. She has a good reputation in the market. Recently, she discovered another food catering company with wider varieties and lower prices that her customers will love to have. Thus, she decided to write a negative letter to the current catering company to inform them about terminating their business together. Dana has to plan her negative letter very carefully and to explain the needs of her customers: * A.to avoid responsibility for the message B.to improve future performance on the part of the sender C.to avoid adding a personal message to the recipient D.to gain control of the context of the message E.to minimize damage to the business relationship