53-6 Compute various manufacturing overhead rates (Learning Objective 3) Edmonton Pools manufactures swimming pool equipment. Edmonton estimates total manufacturing overhead costs next year to be $1,400,000. Edmonton also estimates it will use 50,000 direct labor hours and incur $1,000,000 of direct labor cost next year. In addition, the machines are expected to be run for 40,000 hours. Compute the prede- termined manufacturing overhead rate for next year under the following independent situations: 1. Assume that the company uses direct labor hours as its manufacturing overhead allocation base. 2. Assume that the company uses direct labor cost as its manufacturing overhead allocation base. 3. Assume that the company uses machine hours as its manufacturing overhead allocation base.
Q: Social Media, Inc. (SMI) has two services for users. Toot!, which connects tutors with students who…
A: A cost allocated to produce a product or service is called Overhead rate. Overhead costs are the…
Q: Mementos Academy Cost Validation Student Records Fees collection Staff Salaries 70,400 43,900…
A: Total cost refers to the amount which is computed by adding all the costs related to the business or…
Q: Personal Protective Gears & More (PPGM) design and manufacture masks for students. After production,…
A: In manufacturing business, Finished goods are produced and sold whereas in merchandising business,…
Q: develop and produce a routine, low-risk computer software product. 1,300,000 Completion of detailed…
A: Technological feasibility is the state at which the company decides whether it is feasible for the…
Q: standard and actual costs
A: Definition: Standard Costing: These costs are generally estimates of the actual ones for production…
Q: Assume the same information for the Pacific Boat Company as in Problem 10-40 with one exception.…
A: Regression analysis: Regression analysis is that term which is used to understand the relationship…
Q: Social Media, Inc. (SMI) has two services for users. To ot!, which connects tuters with students who…
A: Overhead costs refer to the costs which occur in operating activity in a business. It also termed as…
Q: The Beacon Hills High School entered into a contract with Beacon Printing Services which stipulates…
A: Note: Hi! Thank you for the question, As per the honor code, we are allowed to answer three…
Q: Personal Protective Gears & More (PPGM) design and manufacture masks for students. After production,…
A: Factory overheads include: Indirect material Indirect labor Utilities Factory rent Factory…
Q: The registration advisors at a small Midwestern university (SMU) help 4,200 students develop their…
A: Compute the waiting time for both A and B parts as follows: The following equation is used for…
Q: Northern Defense manufactures radar systems. It has just completed the manufacture of its first…
A: Calculate cumulative labor hours:
Q: To complete the first setup on a new machine took an employee 100 minutes. Using an 80% incremental…
A: In case of incremental unit- time learning model, the time taken for next process is the only the %…
Q: During year 1, Finch Manufacturing Company incurred $15,000,000 of research and development (R&D)…
A: Upstream cost:-These are those cosr which incurred before the production process starts. These are…
Q: An activity originally estimated to cost $100,000 and require 30 weeks to complete. Now the activity…
A: ACWP 's full form is Actual Cost of Work Performed.…
Q: The following information is provided to you: Direct labour needed to make first machine.…
A: Note: This post has two distinct questions, the second has been solved below. The learning curve:…
Q: The following scenario relates to 5 questions. Bear Co has developed a new model of television. The…
A: Actual learning rate means the rate at which the labor is learning more efficiently. In simple words…
Q: Personal Protective Gears & More (PPGM) design and manufacture masks for students. After production,…
A: Hi student Since there are multiple subparts, but as per question requirement we will answer only d,…
Q: urce from Cengage Learning zy, Inc., manufactures small and large blankets. It estimates $300,000 in…
A: Predetermined Overhead rate will be calculated as =Estimated overhead / Total machine hours
Q: Required information Use the following information for the Exercises below. (Algo) [The following…
A: Under the production units, method depreciation for each unit produced by the asset is calculated.…
Q: The registration advisors at a small Midwestern university (SMU) help 4,200 students develop their…
A: Definition: Cost accounting systems: It is a system which measures, record and reports the product…
Q: Personal Protective Gears & More (PPGM) design and manufacture masks for students. After production,…
A: Factory overhead costs means all indirect costs and expenses that are incurred in factory for…
Q: In preparation for the 2022 English Week Celebration, Beacon Hills High School Student’s council…
A: Note: Hi! Thank you for the question, As per the honor code, we are allowed to answer three…
Q: enter each cost item on your answer sheet, placing the dollar amount per month under the appropriate…
A: Product Cost: Product costs are the costs which are incurred to produce the products. These costs…
Q: Chips, Inc. has developed a new production process to manufacture its product. The new process is…
A: Y = aXb Here, Y = Cumulative Average Time Per Unit a = Time taken to produce first unit i.e. 100…
Q: Dixon Robotics manufactures three robot models: the A3B4, the BC11, and the C3PO. Dixon allocates…
A: Cost accounting is one of the important branch of accounting being used. Under this, various type of…
Q: FIND: Assume that the rework is due to customer’s specifications: How much should be charged to…
A: 1) The Amount that should be charged to work in process to record production before rework: Material…
Q: Personal Protective Gears & More (PPGM) design and manufacture masks for students. After production,…
A: Cost of goods manufactured shows total costs incurred on production and manufacturing of goods in…
Q: Personal Protective Gears & More (PPGM) design and manufacture masks for students. After production,…
A: Income statement in the business shows all incomes and all expenses for the particular period of…
Q: Personal Protective Gears & More (PPGM) design and manufacture masks for students. After production,…
A: Note: Since we only answer up to 3 sub-parts, we’ll answer the first 3. Please resubmit the question…
Q: i) Calculate the breakeven number of students needed at the two different prices being considered.…
A: Break-even point: The point where the company generates revenue equal to the cost incurred in…
Q: The registration advisors at a small Midwestern university (SMU) help 4,200 students develop their…
A: Calculate the average waiting time as follows: The following equation is used for computing the…
Q: The registration advisors at a small Midwestern university (SMU) help 4,200 students develop their…
A:
Q: Personal Protective Gears & More (PPGM) design and manufacture masks for students. After production,…
A: Markup is the amount of profit which is being added to the cost of the product in order to calculate…
Q: S2-4 Classify costs as direct or indirect (Learning Objective 3) Classify each of the following…
A: The cost incurred on the production, manufacturing or selling the product can be classified as…
Q: ssume that Laptop parts assembly company producing 650 laptops during 2019. The management has drawn…
A: Standard input for 650 laptops Standard quantity 650 X 30 19,500 Less: natural loss 3%…
Q: Personal Protective Gears & More (PPGM) design and manufacture masks for students. After production,…
A: “Since you have posted a question with multiple sub-parts, we will solve first three sub-parts for…
Q: Q2 SANDBOX is a 12-month program initiated by the Ministry of Science, Technology and Innovation…
A: In the given question we are provided with the information of a program named SANDBOX initiated by…
Q: Calculate breakeven and margin of safety after hotel renovation (Learning Objective 2)…
A: Variable Cost :— It is the cost that are changes with change in units. Fixed cost :— It is the…
Q: Activities Allocated Costs Allocation Base Account inquiry (hours) $60,000 2,000 hours Account…
A: The account verification cost allocated to North east office is $750 Refer step 2 for calculation
Q: Personal Protective Gears & More (PPGM) design and manufacture masks for students. After production,…
A: In the given question, we are provided with data related to inventory and other information. On the…
Q: Four projects (A, B, C, D) are evaluated for five years in a company that adopts MARR=10%. The…
A: IRR refers to the internal rate of return at which one at which PW of cashflow is 0. MARR is…
Q: The registration advisors at a small Midwestern university (SMU) help 4,200 students develop their…
A: We shall calculate the waiting time in each of the given options to see what is more satisfactory…
Q: How does preferred stock differ from both common equity and debt? Is preferred stock more risky than…
A: A company can raise capital and funding through different types of instruments. The most popular…
Trending now
This is a popular solution!
Step by step
Solved in 4 steps
- Bordner Company manufactures HVAC (heating, ventilation, and air conditioning) systems for commercial buildings. For each new design, Bordner faces a 90 percent learning rate. On average, the first unit of a new design takes 600 hours. Direct labor is paid 25 per hour. Required: 1. Set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, and cumulative total time in hours. Show results by row for total production of one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) 2. What is the total labor cost if Bordner makes the following number of units: one, four, sixteen? What is the average cost per system for the following number of systems: one, four, or sixteen? (Round your answers to the nearest dollar.) 3. Using the logarithmic function, set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, cumulative total time in hours, and the time for the last unit. Show results by row for each of units one through eight. (Round answers to two significant digits.)Your company has received an order for 20 units of aproduct. Th e labor cost to produce the item is $9.50 per hour. Th esetup cost for the item is $60 and material costs are $25 per unit. Th e item is sold for $92. Th e learning rate is 80 percent. Overheadis assessed at a rate of 55 percent of unit labor cost.(a) Determine the average unit cost for the 20 units if the fi rstunit takes four hours.(b) Determine the minimum number of units that need to bemade before the selling price meets or exceeds the averageunit cost.Learning CurveBordner Company manufactures HVAC (heating, ventilation, and air conditioning) systems for commercial buildings. For each new design, Bordner faces a 90 percent learning rate. On aver-age, the first unit of a new design takes 600 hours. Direct labor is paid $25 per hour. Required:1. Set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, and cumulative total time in hours. Show results by row for total pro-duction of one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) 2. What is the total labor cost if Bordner makes the following number of units: one, four, sixteen? What is the average cost per system for the following number of systems: one, four, or sixteen? (Round your answers to the nearest dollar.) 3. Using the logarithmic function, set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours,…
- Northern Defense manufactures radar systems. It has just completed the manufacture of its first newly designed system, RS-32. Manufacturing data for the RS-32 follow: (Click icon to view data) Requirement Calculate the total variable costs of producing 2, 4, and 8 units. Begin by calculating the cumulative total time in labor-hours using the cumulative average-time learning model. (Round the cumulative average time per unit to the nearest whole number.) Cumulative number of Cumulative average time Cumulative total time: per unit: Labor-hours Labor-hours 3700 units 2 4 8 3700 ← Data table Direct material cost Direct manufacturing labor time for first unit Learning curve for manufacturing labor time per radar system Direct manufacturing labor cost Variable manufacturing overhead cost Using the formula for an 85% learning curve, b = In 0.85 In 2 Print = $ $ $ -0.162519 0.693147 81,000 per unit of RS-32 3,700 direct manufacturing labor-hours 85% cumulative average timeª Done 28 per direct…The following information is provided to you: Time taken to produce first 8 shock pads 640 hours Time taken to produce first 16 shock pads 1200 hours Calculate the learning curve The following information is provided to you: Direct labour needed to make first machine. 1000 hoursLearning curve. 80%Direct labour cost. R300 per hourDirect materials cost. R180000 per machine Fixed cost for machines at each cumulative production R800000 Calculate the total direct hours required to manufacture four (4) machines. ( Indicate both average time per unit as well as cumulative time per unit for all theunits) Calculate the total costs to manufacture 4 machinesI have the following information: direct materials $250 and total manufacturing cost $700. Overhead applied to jobs at a rate of 200% of direct labor cost. This is for Chapter 2 job costing in managerial accounting. I am supposed to figure out conversion cost, direct labor cost, and manufacturing overhead. I know the formula for conversion cost= direct labor + manufacturing OH Prime cost= direct labor + direct materials How do I figure out direct labor cost with the given information? The learning objective states calcualte predetermined overhead rate, but I do not have estimated manufacturing cost and estimated labor. Can you please help? Thanks, Erica Gordon
- Average labor cost for the first 700 units of a product is RO 50 and the average labor cost of first 1400 units is RO 45. Average time per unit is 100 minutes. The learning ratio and the average labour cost for first 2800 units will be: a. 80% and RO 36.000 b. 90% and RO 40.500 c. 85% and RO 38.250 d. 95% and RO 42.750The cutting department of Legacy Production Company started 40,000 units of specialized chairs during the month of March. The department incurred $15,000 in direct material costs; 2,500 direct labor hours paid at $10 per hour; and manufacturing overhead applied at 150% of direct labor cost. Legacy Production Company uses process costing to accumulate costs. NOTE: There was no beginning inventory in March. Required (Excel Template downloadProvided): (Module Learning Outcomes LO5.1 through LO5.5 AND Course Learning Outcome #1 & #2) Calculate the conversion costs incurred during the month of March (show your calculations). Assume, that only 30,000 units were completed and transferred out. The remaining units left in ending inventroy are only 70% complete with respect to conversion costs. Direct materials are added at the beginning of the process. Prepare a Cutting Department cost production report for the month of March Refer to the cost production report in part b. What are…A home builder needs to schedule labor for the construction of 24 homes in a subdivision. In the past the builder has noted a 90% learning rate. If the first home requires 2000 labor hours to build, estimate the time required to build: a. The 4th house b. The 15th house c. All 24 houses
- To complete the first setup on a new machine took an employee 100 minutes. Using an 80% incremental unit-time learning model indicates that the second setup on the new machine is expected to take ________. Select one: a. 70 minutes b. 80 minutes c. 120 minutes d. 60 minutesto complete the first setup on a new machine took an employee 250 minutes. using 72% cumulative average - time learning curve indicated that the second setup on the new machine is expected to take. answer choices: a.) 110 minutes b.) 90 minutes c.) 180 minutes d.) 215 minutesHarriman Industries manufactures engines for the aerospace industry. It has completed manufacturing the first unit of the new ZX-9 engine design. Management believes that the 1,000 labor hours required to complete this unit are reasonable and is prepared to go forward with the manufacture of additional units. An 80 percent cumulative average-time learning curve model for direct labor hours is assumed to be valid. Data on costs are as follows: Required: 1. Set up a table with columns for cumulative number of units, cumulative average time per unit in hours, and the cumulative total time in hours. Complete the table for 1, 2, 4, 8, 16, and 32 units. (Round hours to one significant digit.) 2. What are the total variable costs of producing 1, 2, 4, 8, 16, and 32 units? What is the variable cost per unit for 1, 2, 4, 8, 16, and 32 units?