A 400 mm diameter concrete pipe 4100 m long conveys water at the rate of 10000 m³ per day. If the pipeline is gradually closed by a valve at the downstream end in an interval of 15 secondsshow that there is a risk of pipe burst. Assume test pressure of concrete pipe as 25 m of water

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter16: Highway Drainage
Section: Chapter Questions
Problem 13P
icon
Related questions
Question
A 400 mm diameter concrete pipe 4100 m
long conveys water at the rate of 10000 m³
per day. If the pipeline is gradually closed by a
valve at the downstream end in an interval of
15 secondsshow that there is a risk of pipe
burst. Assume test pressure of concrete pipe
as 25 m of water
Transcribed Image Text:A 400 mm diameter concrete pipe 4100 m long conveys water at the rate of 10000 m³ per day. If the pipeline is gradually closed by a valve at the downstream end in an interval of 15 secondsshow that there is a risk of pipe burst. Assume test pressure of concrete pipe as 25 m of water
Expert Solution
steps

Step by step

Solved in 3 steps with 2 images

Blurred answer
Knowledge Booster
Storm sewers and detention
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning