A BRT line operate articulated buses with seating capacity of 200 on 30 km long transit corridor, average load factor is 0.9. During peak hour the total passenger along the route is expected to be 500. Average operating speed is 45 km/hr and layover time is 7.5 minutes at each end. Determine the headway at capacity, frequency and fleet size.
A BRT line operate articulated buses with seating capacity of 200 on 30 km long transit corridor, average load factor is 0.9. During peak hour the total passenger along the route is expected to be 500. Average operating speed is 45 km/hr and layover time is 7.5 minutes at each end. Determine the headway at capacity, frequency and fleet size.
Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter13: Evaluating Transportation Alternatives
Section: Chapter Questions
Problem 24P
Related questions
Question
I need the answer as soon as possible
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 2 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning