A landfill initially received 10,000 tons/day of waste. This receipt rate increases 10% per year. The landfill is closed at the end of the fourth year. Calculate the yearly gas production for 20 years after opening. What is the peak gas production in m3/yr.

Question
  1. A landfill initially received 10,000 tons/day of waste. This receipt rate increases 10% per year. The landfill is closed at the end of the fourth year. Calculate the yearly gas production for 20 years after opening. What is the peak gas production in m3/yr.
check_circleAnswer
Step 1

Consider landfill emission constant as 0.305 per year.

Consider generation potential as 100 m3/tonne.

Step 2

Find the mass of wet waste per year for year 1 using the relation;

M (10,000tonnes/day) 365 days
1 year
10,000x 365 tonnes/day
=3,650,000 tonnes/day
help_outline

Image Transcriptionclose

M (10,000tonnes/day) 365 days 1 year 10,000x 365 tonnes/day =3,650,000 tonnes/day

fullscreen
Step 3

Calculate the mass of wet waste per year for year 2, 3, and 4 by adding 10 % increment of receipt ra...

Mass of wet waste peryear (tons)
3,650,000
4,015,000
4,416,500
4,858,150
Year
1
2
3
Sum
16,939,650
help_outline

Image Transcriptionclose

Mass of wet waste peryear (tons) 3,650,000 4,015,000 4,416,500 4,858,150 Year 1 2 3 Sum 16,939,650

fullscreen

Want to see the full answer?

See Solution

Check out a sample Q&A here.

Want to see this answer and more?

Our solutions are written by experts, many with advanced degrees, and available 24/7

See Solution
Tagged in

Engineering

Civil Engineering

Environmental Science

Related Civil Engineering Q&A

Find answers to questions asked by student like you

Show more Q&A add
question_answer

Q: The cmposite beam is made of 6061-T6 aluminum (A) and C83400 red brass (B). The the height, h=40mm, ...

A: Section Properties : For transformed section:

question_answer

Q: Surveying Question: A differential leveling circuit starts at benchmark Concrete Benchmark (Elevatio...

A: Rise and Fall method has been used for the calculation of elevation of unknown benchmark, calculatio...

question_answer

Q: Fluid Mechanics Show that the control volume for air at 20 degress Celcuis is ~ a cube that has leng...

A: It is required to show that the control volume for air is a cube. This can be done as,

question_answer

Q: The shaft is made from a solid steel section AB and a tubular portion made of steel having a brass c...

A: Given:TorqueShear modulus of steelShear modulus of steel

question_answer

Q: 30 Kip ISin Zin k혀 3i 12o 26 ZA-45) 20 zin 243 -160 beam @gn19ου T dend:Fg14 s hea-han, alo-g Cross ...

A: As per the given shear force and bending moment diagram.From bending equation, we have

question_answer

Q: For the W14x53 (English units) section shown below, determine the First Moment of Outward Area at th...

A: For the section The properties of the section are given below:  

question_answer

Q: Surveying Question: A three sided closed traverse returns to the same point. The details of the trav...

A: Measured values of exterior angles of closed triangular traverse are given

question_answer

Q: subject : Geotechnical Design Book : PRINCIPLE OF FOUNDATION ENGINEERING

A: We have been given the following information:

question_answer

Q: 7.93 Determine the smallest force P necessary to hold the homogeneous 12-kg block in the position sh...

A: The block tries to move in the downward direction due to the self-weight of the block. Therefore, th...

Sorry about that. What wasn’t helpful?