A schematic flow diagram of a completely mixed biological reactor with provision for recycling of solids is shown in the figure. Q-15000 m³ d S = 100 mg L Xo-0 mg L Acration tank S = 15 mg L X = 3000 mg L Detention time=2h Q-5000 m³/d S = 15 mg L X-10000 mg L Sludge retum Secondary settling tank Q, QrQw = flow rates, Q-Q=14950 S = 15 mg L X-0 mg L Q = 50 m³/d S = 15 mg L X-10000 mg L So, S = readily biodegradable soluble BOD, mg/L Xo, X, X₁, X₁ = microorganism concentrations (mixed-liquor volatile suspended solids or MLVSS), mg/L The mean cell residence time (in days, up to one decimal place) is

Solid Waste Engineering
3rd Edition
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Worrell, William A.
Chapter2: Municipal Solid Waste Characteristics And Quantities
Section: Chapter Questions
Problem 2.17P
icon
Related questions
Question

Question.

A schematic flow diagram of a
completely mixed biological reactor
with provision for recycling of solids is
shown in the figure.
Q-15000 m³ d
So = 100 mg L
X-0 mg L
1
Acration tank
S = 15 mg L
X = 3000 mg L
Detention time = 2h
Q,- 5000 m³/d
S = 15 mg L
X-10000 mg L
Sludge retum
Secondary
settling tank
Q, QrQw = flow rates,
Q-Q=14950
S-15 mg L
X-0 mg L
Q-50 m³/d
S = 15 mg L
X-10000 mg L
So, S = readily biodegradable soluble
BOD, mg/L
Xo, X, X₂, X = microorganism
concentrations (mixed-liquor volatile
suspended solids or MLVSS), mg/L
The mean cell residence time (in days,
up to one decimal place) is
Transcribed Image Text:A schematic flow diagram of a completely mixed biological reactor with provision for recycling of solids is shown in the figure. Q-15000 m³ d So = 100 mg L X-0 mg L 1 Acration tank S = 15 mg L X = 3000 mg L Detention time = 2h Q,- 5000 m³/d S = 15 mg L X-10000 mg L Sludge retum Secondary settling tank Q, QrQw = flow rates, Q-Q=14950 S-15 mg L X-0 mg L Q-50 m³/d S = 15 mg L X-10000 mg L So, S = readily biodegradable soluble BOD, mg/L Xo, X, X₂, X = microorganism concentrations (mixed-liquor volatile suspended solids or MLVSS), mg/L The mean cell residence time (in days, up to one decimal place) is
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Interior finishes for wood light frame construction
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Solid Waste Engineering
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,