Question
Asked Mar 9, 2020
1 views

A simple lab test for specific gravity, G, on two samples of lumber indicate
that sample A has G = 0.4 and sample B has G = 0.5 Based on this informa-
tion alone, which wood sample would you choose as a structural member for
your construction project? Briefly explain why.

check_circle

Expert Answer

Step 1

The specific gravity of any material is defined as the ratio of density of the material to the density of water. So, the density is directly proportional to the specific gravity.
I...

Want to see the full answer?

See Solution

Check out a sample Q&A here.

Want to see this answer and more?

Solutions are written by subject experts who are available 24/7. Questions are typically answered within 1 hour.*

See Solution
*Response times may vary by subject and question.

Related Civil Engineering Q&A

Find answers to questions asked by student like you
Show more Q&A
add
question_answer

Q: 5.3 Estimate the runoff volume, in mm of depth, from 80 mm of rainfall on a 90-ha watershed during t...

A: We are authorized to answer one question at a time, since you have not mentioned which question you ...

question_answer

Q: Name the types of network scheduling systems in use and state the proper type of work for each syste...

A: The network scheduling system is a basis for all predicting and planning which helps the management ...

question_answer

Q: Classify all the soils in 5.8 using unified soil classification system. Give group symbols and the g...

A: The chart for the unified soil classification system:

question_answer

Q: Determine the angle ø (0°≤ø≤90°) between cables BA and BC so that 500N vertical force has a componen...

A: Given: Vertical force = 500N

question_answer

Q: Environmental Engineering question: A drinking water treatment facility is planning to reduce operat...

A: Batch Reactors: The water is treated in batches. While the treatment is carried out, nothing is put ...

question_answer

Q: Define initial set and final set. Briefly discuss one method used to determinethem.

A: The initial setting time is defined as the time required for the cement to starts losing its plastic...

question_answer

Q: Why is it desirable to have all contractor submittals submitted through the Resident Project Represe...

A: The Resident Project Representative (RPR) person should work on full time basis whereas the engineer...

question_answer

Q: 6.5 Complete the earthwork calculation sheet here and plot the resulting mass diagram. Divide ccy by...

A: It is required to calculate the volume of cut. Here, A1 is the area of 1st station, A2 is the area ...

question_answer

Q: What is the value of having a project extranet track outstanding issue?

A: A project extranet is a portal that has secured access to be controlled from the outside for various...