a. Specify the compaction (dry unit weight and water content) to be achieved in the field. Justify your specification. b. How many cubic meters of borrow pit soil are needed for 1 cubic meter of highway fill? c. How much water per unit volume is required to meet the specification? d. How many truckloads of soil will be required for a 100,000 m3 highway embankment? Each truck has a load capacity of 22.5 m3 and regulations require a maximum load capacity of 90%.

Fundamentals of Geotechnical Engineering (MindTap Course List)
5th Edition
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter6: Hydraulic Conductivity
Section: Chapter Questions
Problem 6.17CTP
icon
Related questions
Question
Please help me solve my homework problem! Show all work so i can understand!
5. Standard Proctor compaction test results on a sandy clay (35% sand, 55% clay, and 10% silt),
taken from a borrow pit, are given in the following table.
Water content (%)
4.2
5.1
7.8
9.2
12
Ya (kN/m³)
16.9
18.1
19.6
19.5
18.5
The sandy clay in the borrow pit has a porosity of 65% and a water content of 5.2%. A
highway embankment is to be constructed using this soil.
a. Specify the compaction (dry unit weight and water content) to be achieved in the field.
Justify your specification.
b. How many cubic meters of borrow pit soil are needed for 1 cubic meter of highway fill?
c. How much water per unit volume is required to meet the specification?
d. How many truckloads of soil will be required for a 100,000 m3 highway embankment?
Each truck has a load capacity of 22.5 m3 and regulations require a maximum load
capacity of 90%.
Transcribed Image Text:5. Standard Proctor compaction test results on a sandy clay (35% sand, 55% clay, and 10% silt), taken from a borrow pit, are given in the following table. Water content (%) 4.2 5.1 7.8 9.2 12 Ya (kN/m³) 16.9 18.1 19.6 19.5 18.5 The sandy clay in the borrow pit has a porosity of 65% and a water content of 5.2%. A highway embankment is to be constructed using this soil. a. Specify the compaction (dry unit weight and water content) to be achieved in the field. Justify your specification. b. How many cubic meters of borrow pit soil are needed for 1 cubic meter of highway fill? c. How much water per unit volume is required to meet the specification? d. How many truckloads of soil will be required for a 100,000 m3 highway embankment? Each truck has a load capacity of 22.5 m3 and regulations require a maximum load capacity of 90%.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 6 steps

Blurred answer
Knowledge Booster
Measuring carpentry and miscellaneous items
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Principles of Geotechnical Engineering (MindTap C…
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781305081550
Author:
Braja M. Das
Publisher:
Cengage Learning