As part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 240 units per eight-hour day. Task times and precedence relationships are as follows: Task SPC044 0.0 b с d Duration (minutes) 0.2 0.4 0.2 0.4 1.2 1.2 1.0 Immediate Predecessor PPIVE d с e, f
Q: Problem: Find the capacity of this process: 5 Process No. Units/hr 25 1 2 23 3 25 4 23 5 16 6 19 7…
A: The process consists of ten steps or workstations. In order to determine the capacity of a process,…
Q: Find and summarize two research articles that have been peer-reviewed and are related to project…
A: Ethics in project management as depicted by the Project Management Organization (PMI) has four…
Q: Community Federal Bank in Dothan, Alabama, recently increased its fees to customers who use…
A:
Q: Use one of the heuristic decision rules described in Table below to balance the assembly line so…
A: Here, we could see that there are predecessor data and time data for each work element, now I would…
Q: 4.4 A check-processing center uses exponential smooth- ing to forecast the number of incoming checks…
A: The above-given question is to check whether exponential smoothing is a good method for the given…
Q: The upper and lower limits for diving ring diameters made by John's Swimming Co. are 40 and 39 cm.,…
A: If there is a pattern in the reading of a statistical process, it may or may not be in control. The…
Q: The table above provides the aggregate plan of production by a firm. It is known that the firm uses…
A: Stockout is a situation when the inventory stock of a company is less than the demand for the…
Q: Consider the following work breakdown structure: Activity Start A B C уоши D E F Precedes A, B C,D D…
A: Expected time = (optimistic + 4 x most likely + Pessimistic) / 6
Q: Find the optimal solution to this linear programming problem
A: The excel data is below: Excel formulae used:
Q: Week Actual Ft Tt FIT 1 29.0 42.1 8.67 50.77 2 33.0 47.2 8.57 55.77 3 48.0 63.3 9.77 73.07 4 50.0…
A: Formula used: Smoothed Forecast (Ft) = FITt-1+Alpha * (At-1 - FITt-1) Smoothed Trend (Tt)= Tt-1 +…
Q: What was Sam's appraisal cost for quality last year?
A: Cost of Quality = Cost of Good Quality + Cost of Bad Quality Cost of Good Quality = Prevention Costs…
Q: Suppose that 8 customers per hour arrive at a bank during the 11a-1p. "lunch-hour", period. It is…
A: The statement that is true assuming the system is in steady-state during the "lunch-hour" period…
Q: Hart Manufacturing makes three products. Each product requires manufacturing operations in three…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: a-1. Without the inspector, what is the current hourly cost of defects? Note: Round your answer to…
A: Production is a process that turns raw materials into finished products while utilizing a variety of…
Q: A publishing Company produces books for the retail market. Demand for a current book is expected to…
A: Given- Production (P)= 21000 copies per yearDemand (D)= 7500 copies per yearSetup cost (S) =…
Q: DM Office Products (DMOP) is a wholesale supplier of office products with one facility in…
A: The centroid method is a cluster analysis methodology to organize related objects or data points…
Q: What hinders m-commerce? How to beat them?
A: To explain: The obstacles to the growth of m-commerce and method to beat the obstacle. Concept used:…
Q: How to make sample of the different contracts between the business and third-party providers…
A: Creating sample contracts for business agreements with third-party providers requires careful…
Q: A business college graduate is considering opening a small, specialized trucking firm. To make the…
A: Decision Variables: Suppose-X be the no. of small trucksY be the no. of large trucks
Q: The table above provides the aggregate plan of production by a firm. It is known that the firm uses…
A: level plan means similar production rate in every period.
Q: The following table contains the number of complaints received in a department store for the first 6…
A: A three month moving average is a forecasting model which considering the average of previous three…
Q: 2. Use the priority list T1, T2, T5, T7, T6, T3, T4 schedule the project below with two processors.…
A:
Q: Week Actual Forecast 20.2 29.6 31.5 47.2 51.9 67.6 58.0 63.2 5 60.2 71.7 6 84.5 93.9 7 76.3 89.9 8…
A: To use exponential smoothing to forecast the next period's demand, we use the formula: Forecast…
Q: Heather Adams, production manager for a Colorado exercise equipment manufacturer, needs to…
A: For F we will have to determine the values of Stepper, A and B since F must include A and B and A…
Q: The retail shop averages demand of 100 chocolate chip cookies per day, with a 10 cookie standard…
A: Given data: Average daily demand = 100 chocolate chips per day Standard deviation = 10 Lead time =…
Q: b. Determine X and R. Note: Round your answers to 3 decimal places. X bar R bar c. Determine the UCL…
A: Here, there are a total of fifteen samples and the sample size is 4, I would draw up the X bar R…
Q: IBM Sametime is IBM’s telepresence and collaboration environment. Formerly known as Lotus Sametime,…
A: IBM Sametime is a telepresence and collaboration platform that provides a range of real-time social…
Q: A2 A healthy diet contains m different nutrients in quantities at least equal to b1, · · · , bm.…
A: According to the above scenario. A2 is a healthy diet that contains different nutrients in qualities…
Q: Which of the following best describes the last step to developing a master production schedule?…
A: Here, this MCQ question is centric towards the last step for creating an MPS or master production…
Q: The following assembly tasks (with performance time in minutes and task precedence) are to be…
A: Part A: Below mentioned is the precedence diagram of assembly elements from A to L.
Q: Assume that a company provided the following information and assumptions from its master budget:…
A: Given- Unit sales in June = 20,000 unitsUnit sales in July = 18,000 unitsUnit sales in August =…
Q: Weekly Average Demand 190 Standard deviation of (weekly) demand 20 Setup cost ($) 1200 Lead time (in…
A: EOQ stands for economic order quantity. It is a company's optimal order quantity that undervalues…
Q: a. Draw the network. b. What is the critical path? c. How many weeks will it take to complete the…
A: For the given data, we could see that each activity has immediate predecessor data and Time data, I…
Q: Here are the data for the past 21 months for actual sales of a particular product: January February…
A: Most Recent Quarter = 0.50 Second most recent Quarter = 0.25 Third most recent Quarter = 0.25
Q: 2. Which station is the bottleneck? Alpha $10 Raw materials Bravo $10 Raw materials Charlie $8 Raw…
A: Company has four work stations for producing four different types of models; alpha, Bravo, Charlie…
Q: Consider the following work breakdown structure: Activity Start A B C UDEF Precedes A,B C,D D E TIM…
A: Expected time = (optimistic + 4 x most likely + Pessimistic) / 6
Q: How should the payroll service provider provide caring, personalised attention
A: A business that manages all elements of payroll on account of another business is known as little…
Q: Metrics for static and path testing, as well as the cost savings to cost ratio that these tests…
A: Metrics for static and path testing can provide valuable information to project managers about the…
Q: a-1. If the inspector position is eliminated, what will the hourly cost of defects be? Note: Round…
A: Production is a process that turns raw materials into finished products while utilizing a variety of…
Q: Month# Forecast# Jan Feb Mar Apr May 1800 2000 1000 160 1500 Starting inv.# 108 ܘ ܘ ܘ ܪ 228 Net…
A: level plan means similar production rate in every period.
Q: Calculate the economic order quantity. From which vendor is the optimal order quantity and what is…
A: The EOQ is the level at which total cost is the lowest.
Q: Tej Dhakar's company wants to establish kanbans to feed a newly established work cell. The…
A: Daily demand (D) = 200 Lead time(L) = 2 Safety stock(S) = 1 Kanban size(Q) = 50
Q: Rylon Corporation manufactures Brute and Chanelle perfumes. The raw material neededto manufacture…
A: Let: x1: the amount of raw material (in pounds) used to produce Regular Brute perfume.x2: the amount…
Q: Week Actual Ft Tt 1 2 3 FIT 27.9 47.6 8.67 56.27 32.2 51.9 9.77 61.67 51.5 71.2 7.77 78.97 57.6 63.7…
A: Given: Alpha = 0.4 Beta = 0.15 To be determined: To find the Double Exponential forecast for week…
Q: 5. Heart Beats is a manufacturer of medical equipment. The company's primary product is a device…
A: (a)
Q: is I need it! A company currently using an inspection process in its material receiving department…
A: Production is a process that turns raw materials into finished products while utilizing a variety of…
Q: Answer the given question with proper explanation and step-by-step solution.
A: The critical Path Method is a concept of operations management that is used to determine which tasks…
Q: You are given the demand and forecast history for Apple iPhone 12. According to this, what is the…
A: Here, I have been given the actual demand and forecasted demand for each week, I would apply the…
Q: understanding of the power of "yet" is that it's a tactic to keep people out of a fixed mindset and…
A: By focusing on ways to get better rather than solely on past successes, individuals and…
Q: The Mowry Machine Shop still has five jobs to be processedas of 8 a.m. today (day 23) at its…
A: FCFS (First Come First Serve) and EDD (Earliest Due Date) are two commonly used scheduling…
need correct and complete answer this time
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 7 images
- As part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 240 units per eight-hour day. Task times and precedence relationships are as follows: Task Duration(minutes) ImmediatePredecessor a 0.2 - b 0.4 a c 0.2 b d 0.4 - e 1.2 d f 1.2 c g 1.0 e, f Click here for the Excel Data File Do each of the following: a. Determine the minimum cycle time, the maximum cycle time, and the calculated cycle time. (Round your answers to 1 decimal place.) b. Determine the minimum number of stations needed. (Round your answer to the next whole number.) c. Assign tasks to workstations on the basis of greatest number of following tasks. Use longest processing time as a tiebreaker. If ties still exist, assume indifference in choice. d. Compute the percentage of idle time for the assignment in part d. Use the actual bottleneck cycle time in your calculation.…An assembly line is to operate eight hours per day with a desired output of 200 units per day. The following table contains information on this product’s task times and precedence relationships: TASK TASK TIME(SECONDS) IMMEDIATEPREDECESSOR A 60 — B 60 A C 50 A D 70 A E 30 B, C F 110 C, D G 70 E, F H 70 G b. What is the required workstation cycle time to meet the desired output rate? (Round your answer to the nearest whole number.) c. Balance this line using the longest task time. (Leave no cells blank - be certain to enter "0" wherever required.) d. What is the efficiency of your line balance, assuming it is running at the cycle time determined in part b? (Round your answer to 1 decimal place.)Sue Helms Appliances wants to establish an assembly line to manufacture its new product, the Micro Popcorn Popper. The goal is to produce five poppers per hour. The tasks, task times, and immediate predecessors for producing one Micro Popcorn Popper are as follows: Task Performance Time (mins) Task Must Follow Task Listed Below A 8 − B 11 A C 10 A, B D 9 B, C E 8 C F 4 D, E A C F B E D In the diagram, there are 6 circles labeled using the letters from A to F. There are 8 of arrows, and each arrow connects one circle to another circle. The arrows are situated in the following manner: A to B, A to C, B to C, C to D, B to D, C to E, D to F, and E to F. Part 2 a) The theoretical minimum number of workstations=55 (round your response up to the…
- The desired daily output for an assembly line is 540 units. This assembly line will operate 720 minutes per day. The following table contains information on this product's task times and precedence relationships: TASK TASK TIME(SECONDS) IMMEDIATEPREDECESSOR A 35 — B 25 A C 35 A D 55 B E 5 B F 15 C G 30 E-D H 5 F-G b. What is the workstation cycle time? c. Balance this line using the largest number of following tasks. Use the longest task time as a secondary criterion. (Leave no cells blank - be certain to enter "0" wherever required.)Francis Johnson’s plant needs to design an efficient assembly line to make a new product. The assembly line needs to produce 15 units per hour, and there is room for only four workstations. The tasks and the order in which they must be performed are shown in the following table. Tasks cannot be split, and it would be too expensive to duplicate any task. TASK TASK TIME (MINUTES) IMMEDIATE PREDECESSOR A 1 — B 2 — C 3 — D 1 A, B, C E 3 C F 2 E G 3 E What is the workstation cycle time required to produce 15 units per hour? Note: Round your answer to 1 decimal place. Balance the line to use the fewest possible workstations to meet the cycle time found in part (b). Use whatever method you feel is appropriate. What is the efficiency of your line balance, assuming the line operates at the cycle time from part (b)? Note: Round your answer to 1 decimal place.An assembly plant for the Blood Pressure RX, a portable blood pressure device, has 400 minutes available daily in the plant for the device, and the average demand is 80 units per day. Final assembly requires 6 separate tasks. Information concerning these tasks is given in the following table. Task Performance Time (minutes) Task Must Follow Task Listed Below A 4 - B 1 - C 1 A, B D 3 C E 4 D F 2 E b) Given the demand, what is the cycle time for this operation? The cycle time for this operation is enter your response here minutes/unit (enter your response as a whole number). c) What is the theoretical minimum number of workstations? The theoretical minimum number of workstations is enter your response here stations (enter your response as a whole number and, if your unrounded answer includes decimal values,…
- A company needs to rebalance a product layout for producing new plastic license plates. They plan to use the assembly line six hours in order to meet projected demand of 2,160 license plates each day. The following table describes the tasks involved in the production of this product: Without regard to projected demand, what is the maximum possible cycle time for this assembly line? Task Time (secs) Immediate Predecessor a 3 none b 4 none c 5 a,b d 7 none e 9 c,dAn assembly line is to operate eight hours per day with a desired output of 250 units per day. The following table contains information on this product’s task times and precedence relationships: TASK TASK TIME (SECONDS) IMMEDIATE PREDECESSOR A 50 — B 20 A C 25 A D 35 A E 60 B, C F 60 C, D G 50 E, F H 90 G What is the required workstation cycle time to meet the desired output rate? Note: Round your answer to the nearest whole number. Balance this line using the longest task time. Note: Leave no cells blank - be certain to enter "0" wherever required. What is the efficiency of your line balance, assuming it is running at the cycle time determined in part b? Note: Round your answer to 1 decimal place.As part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 250 units per 8-hour day. Task times and precedence relationships are as follows: Task Duration(minutes) ImmediatePredecessor a 0.5 - b 0.4 a c 0.5 b d 0.3 - e 1.8 d f 1.9 c g 2 e, f Do each of the following: a. Determine the number of followers for each task. (Please answer number of tasks following task for A-G)
- The desired daily output for an assembly line is 360 units. This assembly line will operate 450 minutes per day. The following table contains information on this product’s task times and precedence relationships: TASK TASK TIME (SECONDS) IMMEDIATE PREDECESSOR A 30 — B 35 A C 30 A D 35 B E 15 C F 65 C G 40 E, F H 25 D, G What is the required workstation cycle time to meet the desired output rate? Balance this line using the largest number of following tasks. Use the longest task time as a secondary criterion. Note: Leave no cells blank - be certain to enter "0" wherever required.Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the eight tasks that make up the job are 7, 4, 7, 8, 9, 4, 3, and 6 minutes, and the cycle time is 8 minutes? Multiple Choice None of these choices are correct. 3 8 5 6The desired daily ouput for an assembly line is 420 units. This assembly line will operate 595 minutes per day. The following table contains information on the products task times and precedence relationships Task. Task time-seconds Immediate predecessor A. 35 - B. 40 A C 30 A D 40 B E 20 C F 70 C G 45 E-F H 30 D-G The required workstation cycle time to meet the desired output time is 85 seconds Balance this line using the largest number of following tasks. Use the longest task time as a secondary criterion The answer gives only 4 workstations as option Have to fill out following Workstation. Task Idle time 1 ?? ?? 2 ?? ?? 3…