At a hydrocarbon processing factory, process control involves periodic analysis of samples for a certain process quality parameter. The analytic procedure currently used is costly and time consuming. A faster and more economical alternative procedure has been proposed. However, the numbers for the quality parameter given by the alternative procedure are somewhat different from those given by the current procedure, not because of any inherent errors but because of changes in the nature of the chemical analysis. Management believes that if the numbers from the new procedure can be used to forecast reliably the corresponding numbers from the current procedure, switching to the new procedure would be reasonable and cost effective. The following data were obtained for the quality parameter by analyzing samples using both procedures: Current (Y) Proposed (X) Current (Y) Proposed (X) 2.8 3.2 3.1 3.1 3.7 3.8 2.6 3.0 2.8 3.5 3.3 3.6 3.6 4.0 3.4 4.0 3.6 3.7 2.1 2.6 2.7 3.6 3.2 3.2 3.3 3.5 3.1 2.7 a. Use linear regression to find a relation to forecast Y, which is the quality parameter from the current procedure, using the values from the proposed procedure, X. The forecasting model is given by the equation Y = + X. (Enter your responses rounded to three decimal places.)

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter9: Decision Making Under Uncertainty
Section9.2: Elements Of Decision Analysis
Problem 2P
icon
Related questions
Question
At a hydrocarbon processing factory, process control involves periodic analysis of samples for a certain process quality parameter. The analytic procedure currently used is costly and time
consuming. A faster and more economical alternative procedure has been proposed. However, the numbers for the quality parameter given by the alternative procedure are somewhat
different from those given by the current procedure, not because of any inherent errors but because of changes in the nature of the chemical analysis.
Management believes that if the numbers from the new procedure can be used to forecast reliably the corresponding numbers from the current procedure, switching to the new procedure
would be reasonable and cost effective. The following data were obtained for the quality parameter by analyzing samples using both procedures:
Current (Y)
2.8
Current (Y)
ITTT
Proposed (X)
3.2
Proposed (X)
3.1
3.1
3.7
38
2.6
3.0
2.8
3.5
4.0
3.3
3.6
3.6
3.4
4.0
3.6
3.7
2.1
2.6
2.7
3.6
3.2
3.2
3.3
3.5
3.1
2.7
a. Use linear regression to find a relation to forecast Y, which is the quality parameter from the current procedure, using the values from the proposed procedure, X.
The forecasting model is given by the equation Y = + X. (Enter your responses rounded to three decimal places.)
Transcribed Image Text:At a hydrocarbon processing factory, process control involves periodic analysis of samples for a certain process quality parameter. The analytic procedure currently used is costly and time consuming. A faster and more economical alternative procedure has been proposed. However, the numbers for the quality parameter given by the alternative procedure are somewhat different from those given by the current procedure, not because of any inherent errors but because of changes in the nature of the chemical analysis. Management believes that if the numbers from the new procedure can be used to forecast reliably the corresponding numbers from the current procedure, switching to the new procedure would be reasonable and cost effective. The following data were obtained for the quality parameter by analyzing samples using both procedures: Current (Y) 2.8 Current (Y) ITTT Proposed (X) 3.2 Proposed (X) 3.1 3.1 3.7 38 2.6 3.0 2.8 3.5 4.0 3.3 3.6 3.6 3.4 4.0 3.6 3.7 2.1 2.6 2.7 3.6 3.2 3.2 3.3 3.5 3.1 2.7 a. Use linear regression to find a relation to forecast Y, which is the quality parameter from the current procedure, using the values from the proposed procedure, X. The forecasting model is given by the equation Y = + X. (Enter your responses rounded to three decimal places.)
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 4 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,