bama pie company's assembly line operations (the assembly line operates for six hundred minutes per day) comprise of eleven tasks, with the longest task time being 2.4 minutes and the shortest task time being 0.4 minutes; the sum of the task times is eighteen minutes. the firm is working on balancing its assembly line operations. the firm needs to produce 200 pies per day; to achieve this, the firm calculates the required cycle time as ---- minutes?
Q: Use the information given below for all questions about this scenario. James Johnson (also known as…
A: Cycle Time = Time available / Units required in given time = 60 minutes /…
Q: For a food-processing plant such as Kraft Foods, capacity refers to the number of employees working…
A: Introduction: The term Business refers to an exchange of goods and services between the buyer and…
Q: A bank receives loan applications from 6 customers a day. The bank has promised customers that…
A:
Q: A manufacturing process has 12 workers and 6 stations. The process is completed in the order given…
A: Given data: Station Staffing Processing time(hours per unit per worker) A 2 2.20 B 1…
Q: In a manufacturing system, the technique of deciding how to assign work to specific workstations…
A: Assigning work to a secific workstation is crucial because it affects the efficiency of the task.…
Q: Georgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the…
A: Given Information: Cabinet Maker 1 Cabinet Maker 2 Cabinet Maker 3 Hours required to…
Q: (a) Develop a sequence using SPT based on processing time for preparing the area.
A: Sequencing is an appropriate order of plan as per which the process of operations works. It defines…
Q: There is an upstream Picking department that feeds two downstream Packing departments: Pack Singles…
A: We have to pack 47880 units in Multis which is accounted for 60% of the volume. Hence, Overall…
Q: PepsiCo sells its soft drinks in approximately 400,000 retail establishments, such as supermarkets,…
A: Research is an organized and planned method of finding answers to the questions. It is a long…
Q: A company makes four products that have the following characteristics: Product A sells for $75 but…
A: If the total load on the workstation is beyond the work capacity of the center, then it becomes a…
Q: A manufacturing company produces four parts that require the use of a lathe and a drill press. The…
A: Let us assume that Xj is the number of Part-j that is to be produced for j=1,2,3,4 & Also, let…
Q: Consider again the case of One Hour Loan. Recall that activity 1 takes 4 minutes/loan,activity 2…
A:
Q: Write the Objective Function and Constraints for this problem.…
A: Let X1 = Number of the unit of product A produced X2= Number of the unit of product B produced X3 =…
Q: If a flow unit type j does not consume any time at a resource i, the corresponding cell inthe…
A: The corresponding cell of the type j cell in the workload matrix, which is referred as WL (i, j)…
Q: Minimum number of work stations to balance this process
A: Workstation balancing is the process of allocating activities to different workstations based on the…
Q: A company makes four products that have the following characteristics: Product A sells for $75 but…
A: Given data, Work Center - W, X, Y, Z Days of work = 5 per week Market Demand = 50As, 60Bs , 70…
Q: A company makes four products that have the following characteristics: Product A sells for $75 but…
A:
Q: Consider a two-step process that handles three types of customers. Each resourceis staffed by one…
A: Bottleneck Process Bottleneck in operations is a step in a process that limits the ability of other…
Q: In her last semester at SPC, Polly Hedron needs to take Statistics, Composition 2, Ethics, and…
A: given, She has 14 choices for statistics, 19 choices for composition, 17 choices for ethics, 18…
Q: Joe’s commercial laundry has contracts to wash bedsheets for hotels. Joe intakes each batch of…
A: Here, the ironing process has the least capacity per hour. Hence, the ironing process is the…
Q: A company makes four products that have the following characteristics: Product A sells for $75 but…
A: : Since we only answer up to 3 sub-parts, we’ll answer the first 3. Please resubmit the question and…
Q: A manufacturing company produces four parts that require the use of a lathe and a drill press. The…
A: Assume that Xj is the number of Part-js to be created for j=1,2,3,4 and that di+ and di- are the…
Q: Digos Mineral Inc. is in water refilling. The following information pertains to its operations…
A: Given data is Processing time = 40 minutes Inspection time = 7.5 minutes Waiting time = 7.5 minutes…
Q: At a manufacturing assembly line, 30 jobs arrive perhour. Each job must pass through two production…
A: Given data, The arrival of job =30 job per hour Production Stage Stage 1 - Average 1 minutes to…
Q: A medical office treats two different types of patients, new patients and existing patients. The new…
A: The capacity utilization rate quantifies the proportion of an organization's potential production…
Q: Solve the question below using the attached excel templates with formulas for renting both slow and…
A: Employee's time worth (per hour) $15 Need of employees per hour 4 Slow copier Cost of…
Q: The Decision Sciences Department is tyring to determine whether to rent a slow or fast copier. The…
A: The following information is given to us for the two copiers, fast and slow. Slow Copier - Rent is…
Q: A company produces three products A,B, and C. The products are processed through three machines as…
A: Since standard time unit is not given we are assuming it to be hours.
Q: Katie Posh runs an upscale nail salon. The service process includes five activities that are…
A: Given Activity 1: Welcome a guest = 1 minute Activity 2: Clip and file nails = 3 minutes Activity…
Q: zing a copier ats (for slow system) of time ce rate tputs rect outputs from Inputs man time between…
A: From the given information, The department believes that the employees time is worth $15 per hour.…
Q: Using linear programming, determine how many pieces of poloshirts and how many pieces of t-shirts…
A: Using linear programming, determine how many pieces of poloshirts and howmany pieces of t-shirts…
Q: A bottled water production process is described by the following flowchart. Production Setup 40…
A:
Q: A small shoe manufacturer makes two styles of shoes: oxfords and loafers. Two machines are used in…
A: Let x be the no. of oxfords style shoe y be the no. of loafers style shoe The total manufacturing…
Q: A machining center has the following small jobs from five of its customers. The jobs are listed in…
A: FCFS Job Total processing time Due date (in hours) Flow time Tardiness Patel 8 5 8 3 Smith 5…
Q: een Vehicle Inc., manufactures electric cars and small delivery trucks. It has just opened a new…
A: Let x be the no. of Car C1 And y be the no. of Truck The objective value. Max Z=225x+275y…
Q: Personnel Department costs are allocated on the basis of employee hours and Support Department costs…
A: In the above question, the direct method of allocation is used as the clinic has two service…
Q: A final assembly plant for a certain automobile model is to have a capacity of 240,000 units…
A: Data Given Annual production = 240,000 unit Operating time(t) = (50 week/yr * 5 days/week * 8…
Q: The supervisor of ABC Corp. wishes to assign a number of workstations to an operator based on…
A: Consider
Q: flow rate for unit B
A: Flow rate indicating the maximum number of units can produced in a process layout. Here, we can…
Q: Katie Posh runs an upscale nail salon. The service process includes five activities that are…
A: Listing out the duration of each activity (5 nos.) and servers (3 nos.) below: The sum of all…
Q: "Ruby runs a machine design shop that has 4 stages of process in succession. Stage i is cutting that…
A: Given data:
Q: Considering the concept of constraint management, what are a few of the challenges of managing…
A: At first it is important to know the concept of constraint management. The word constraint depicts…
Q: CWD Manufacturing makes three components for sale to refrigeration companies. The components are…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: daily report of the production plant. Calculate the mean, median, and mode
A: A ‘Daily Production Report’ is a record which documents the levels of production & other data.…
Q: A company makes four products that have the following characteristics: Product A sells for $75 but…
A:
Q: Posh Nails Katie Posh runs an upscale nail salon. The service process includes five activities that…
A: The wages that are incurred for buying the goods and services to the customer is known as direct…
Q: There are three sequential operations (Station 1, Satiation 2, and Station 3) in a process. Incoming…
A: Theoretical flow time indicating the time required to complete a single task. Here, we can calculate…
Q: In a manufacturing system the technique of deciding how to assign work to specific work stations (…
A: Production is the process of manufacturing products for consumption purposes to sell in the market.
bama pie company's assembly line operations (the assembly line operates for six hundred minutes per day) comprise of eleven tasks, with the longest task time being 2.4 minutes and the shortest task time being 0.4 minutes; the sum of the task times is eighteen minutes. the firm is working on balancing its assembly line operations. the firm needs to produce 200 pies per day; to achieve this, the firm calculates the required cycle time as ---- minutes?
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- You work for a small shipping company and warehouse. The owners have decided to update the software used for tracking, shipping, receiving, and inventory. Fifteen computers need to be updated. Hours of operation are 7 a.m. to 7 p.m. Monday through Saturday. Each computer must be updated manually by one of two trained employees, both of whom must be borrowed from other managers. The update procedure consumes 4 hours of the updater's time and generates an additional 1.5 hours of computer downtime. The work must be performed at a central loading station, away from the current location of the computer. How does the project portfolio management approach lead to enhanced strategic management for an organization and give an example how you woulduse this in a work place?Consider a two-step process that handles three types of customers. Each resourceis staffed by one employee. Type 1 customers spend 5 minutes at resource 1 and 2 minutesat resource 2. Type 2 customers also spend 5 minutes at resource 1, but spend 10 minutes atresource 2. Finally, type 3 customers spend no time at resource 1 and 8 minutes at resource2. Each hour, the demand is 10 customers of type 1, 4 customers of type 2, and 2 customers oftype 3. Where in the process is the bottleneck? What is the flow rate for each customer type?An automobile company assembles cars in a plant and purchases batteries from a vendor in China. The average cost of each battery is $45. The automobile company takes ownership of the batteries when they arrive at the plant. It takes exactly 12 hours to make a car in the plant and the plant assembles 200 cars per 8-hour shift (currently the plant operates one shift per day). Each car uses one battery. The company holds, on average, 8,000 Batteries in raw material inventory at the plant as a buffer. Assignment: Find the total number of batteries in the plant, on average (in work-in-process at the plant and in raw material inventory). How much are these batteries worth? How many days of supply are held in raw material inventory, on average?
- A bank recently finished construction of a new building in the downtown business district. You have been asked to help them arrange the various departments of its check processing division to minimize the workflow (Summation LxD) in its operations. The movement of checks between departments is shown in the table below. Department 4 (the check distribution department) must be in the room with the elevator. Only lateral movement is allowed (no diagonal movement allowed) from the center of one department to the center of the destination department. Each department is 50 feet x 50 feet. What is the Summation LxD of the recommended layout? 10,640 feet 15,960 feet 26,600 feet 38,800 feet None of the above Which of the potential layouts shown above should be recommended to the bank management? (Below is the potential layouts) Layout A Layout B Layout C Layout D None of the aboveA medical clinic performs three types of medical tests that use the same machines. Tests A, B, and C take 15 minutes, 30 minutes, and 1 hour, respectively, with respective profits of $120, $240, and $500. The clinic has four machines and four workers available. One person is qualified to do test A, two to do test B, and one to do test C. If the clinic has a rush of customers for these tests, how many of each type should it schedule in a 10-hour day to maximize its profit?A manufacturing company produces a single product at four workstations in series (assume no variability). The company operates 2 shifts of 8 hrs per day, 5 days per week. Each shift contains one lunch break of 60 min. The processing time per unit as well as the number of machines per station is indicated in the table below. After every 800 units produced, the tools used in the machines at station 1 need to be replaced. It takes on average 25 minutes to replace the tools (all machines' tools are replaced simultaneously). All the machines can process one unit at a time only, except for station 1 where each machine can process 4 units simultaneously. Station Processing Time [Min./Unit] Number of Machines 1 20 1 2 20 2 3 18 1 4 20 3 (a) Which station is the bottleneck? (b) What is the process capacity in units per day (round to the nearest integer)? (c) What is the cycle time of station 3 in minutes (give to 3 decimals)?
- Katie Posh runs an upscale nail salon. The service process includes five activities that are conducted in the sequence described below. (The time required for each activity is shown in parentheses): Activity 1: Welcome a guest. (1 minute) Activity 2: Clip and file nails. (3 minutes) Activity 3: Paint. (5 minutes) Activity 4: Dry. (10 minutes) Activity 5: Check out the customer. (4 minutes) Three servers (S1, S2, and S3) offer the services in a worker-paced line. The assignment of tasks to servers is the following: S1 does Activity 1. S2 does Activities 2 and 3. S3 does Activities 4 and 5. The drying process does not require server 3’s constant attention; she/he needs to only escort the customer to the salon’s drying chair (equipped with fans for drying). The time to do this is negligible. There exists only one drying chair in the salon. What is the utilization of server 2 (in decimal form)? Assume that there is unlimited demand and that the process only admits customers at the rate…A production line is a set of sequential operations established in a factory plant where components are assembled to make a finished product or where materials are put through a refining process to produce an end-product that is suitable for onward consumption. Ford have seven production lines in their manufacturing plant for their automotive parts where each production line produces 120, 100, 80, 116, 77, 94, 112 output per day. (a) As the Production Manager at Ford, you are required to submit the daily report of the production plant. Calculate the mean, median, and mode from the data based on the output that has been provided. (b) Also calculate the three critical parameters for measuring spread in the following ways: Range Variance Standard DeviationA toy firm produces drums sequentially on three machines—A, B, and C—with cycle times of 3, 4, and 6 minutes, respectively. (a) Determine the optimum efficiency and output rates for adding one, two, ... , six more machines. (b) assume now that two identical lines are operating, each with machines A, B, and C. If new machines can be shared between the lines, how should one, two and then three new machines be added What are the resulting efficiencies and outputs of the two lines? is it always best to equally share extra machines between the two lines?
- A book binder has one printing press, one binding machine and manuscripts of 7 different books. The times required for performing printing and binding operations for different books are shown below. Book 1 2 3 4 5 6 7 Printing time (hours) 20 90 80 20 120 15 65 Binding time (hours) 25 60 75 30 90 35 50 Decide the optimum sequence of processing of books in order to minimize the total time required to bring out all the books.Which is most likely true about theory of constraints? a. The theory of constraints does not apply to companies with multiple products because of capacity measurement difficulties. b. In any profit-seeking company, there must be at least one constraint. c. Constraints or bottlenecks stop organizations from selling an infinite number of units or services. d. b & c e. All of the above f. None of the aboveA producer has three products, A, B, and C, which are composed from many of the same raw materials and subassemblies by the same skilled workforce. Each unit of product A uses 15 units of Raw Material X, one Purge System Subassembly, one Case, one Power Cord, three Labour Hours in the Assembly Department, and one Labour Hour in the Finishing Department. Each unit of product B uses 10 units of Raw Material X, five units of Raw Material Y, two Purge System Subassemblies, one Case, one Power cord, five Labour Hours in the Assembly Department, and 90 minutes in the Finishing Department. Each unit of product C uses five units of Raw Material X, 25 units of Raw Material Y, two Purge System Subassemblies, one Case, a Power Cord, seven Labour Hours in the Assembly Department, and Three Labour Hours in the Finishing Department. Labour between the Assembly and Finishing departments is not transferable, but workers within each department work on any of the three products. There are three…