Calculate manpower needs A manufacturing company plans following production and labour intensity of their products for the next year:The company expect to meet the performance standard at 100 %. In average there are annually 20 days of vacation, 7 days of sickness, and 4 day of other absence. The manufacture works in two-shifts with 7.75 working hours per shift. Annually there are 252 working days. 1. Calculate the need of workers to cover the production. The answer is:
Q: Q1: For the project listed below, find the following items: 1- Total project finishing time 2-…
A: A critical path indicating the longest duration path which representing minimum time required to…
Q: Calculate expected values for large and small expansions. What should Dairy May Farms do? EV small…
A: Decision tree is a diagramatical representation of various alternative for a project corresponding…
Q: What problems arise in breaking the operation into elements? (Methods study)
A: Every business or organization exists to accomplish an objective. As such, it’s reasonable to assume…
Q: Operations Management Which of the following statements is FALSE? a. Higher product variety makes it…
A: Stock keeping unit are unique identifiers for the products which would make it easier to track the…
Q: Find the x- intercept and y- intercept of each constraints and graph.
A: Linear programming is a mathematical technique that is also used in operations management…
Q: Please explain the third phrase of this question, thank you.
A: The global media market is a huge industry, with more than $1 trillion of revenue generated…
Q: Determine the distribution for the company so as to minimize the cost of transportation using least…
A: The transportation model is used to calculate the minimum cost of the route by selecting different…
Q: •A mediçal doctor doing a bypass surgery to his patient is involved in Php 2 million malpractice…
A: The total suit amount is 2 million out of which 1.75 million is the redressal amount and 0.25…
Q: A company that manufactures cars would use about 50,000 steering wheels per year. Such steering…
A: EOQ stands for economic order quantity. It is a company's optimal order quantity that undervalues…
Q: Eye4Customer is a 3-year-old call centre. It has launched Performance Appraisal system recently.…
A: SMART performance goals are specific in nature, measurable in terms of quality, achievable, relevant…
Q: A nutritionist is planning a menu consisting of two main foods A and B. Each ounce of A contains 2…
A: Let x be ounces of A y be ounces of B Since the cost is given, we have to minimize them. (i) Ounce…
Q: A jewelry shop procures a ring at $20 each and sells it at $80 each. Weekly demands for the ring…
A:
Q: What is whistleblowing? When should an employee become a whistleblower? Under what circumstances is…
A: Whistleblowing means informing to leader about a wrong activity commited in the workplace.
Q: McDonald wants to increase its total revenue. One strategy is to offer a 10% discount on every…
A: Kindly find the detailed solution in step 2.
Q: with quality tools and techniques indicate which tool can be use to assist in analyzing the…
A: In the healthcare industry, quality is defined as the right treatment, at right time, to the right…
Q: Question 11 11. Given the following observations with binary variables: Observation Female Married…
A: Simple matching coefficient = (N00+N11)/(N00+N01+N10+N11) Where N00 = Number of samples where Both…
Q: Acme Batteries is introducing a new line of batteries for electric vehicles. The first battery cell…
A: Find the Given details below: Given details: Firat battery cell cost ($) 120 Learning rate…
Q: The Fly-Right Airplane Company builds small jet airplanes to sell to corporationsfor the use of…
A: a.
Q: Flowcharts are more commonly used than I P O documents True False
A: A flowchart can be stated as the diagram type that indicates a workflow or an algorithm. The…
Q: Operations Management 15.Organizational structure contributes to explaining and predicting…
A: A organisational structure refers to a structure which is created either due to fulfillment of the…
Q: Question Two Calculate the Total annual cost D=1,500units Q*= 250 units S = $10 per order N = 5…
A: The total annual cost is the sum of the supplemental annual cost and normal cost.
Q: New-economy companies generally have higher O A. than old-economy companies. book value per share O…
A: PE ratio or profit earning ratio refers to the profit earned by a particular stock divided by the…
Q: how do you forecast a travel demand? 2. how do you make a transport plan?
A: A travel demand refers to the demand of hotels ,motels ,restaurants which people demands when to go…
Q: How should Timothy Jose handle the problem?
A: The EEOC investigates charges brought against firms regarding discrimination against workers / job…
Q: 360- degree feedback is effective way of appraising the performance of employees provided it is…
A: 360 Degree Employees receive private, anonymous feedback from their coworkers through a system or…
Q: RJ produces chocolate balls. There are five samples, and each sample contains 4 packs of chocolate…
A: X-chart is a model of control chart which helps to identify the process controllability using mean…
Q: QI: For the project listed below, find the following items. 1- Total project finishing time 2-…
A: As per our guidelines, we are supposed to answer only three sub-parts if multiples sub-parts are…
Q: 2. The OPTIMIS factory produces cars, with the body assembly time requirements for two types of cars…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: Analyse the principles, tools and techniques of TQM and six sigma
A: TQM can be defined as an integrated and comprehensive system for planning and managing all business…
Q: Please explain the fundamental shift in quality attention in manufacturing from the Industrial…
A: The Industrial Revolution was a period of dramatic change in manufacturing that occurred in the late…
Q: There are five primary causes/sources of risk. Identify and discuss these.
A: Risk is an unforseen event of activities which might or might not takes place in near future and…
Q: According to the U.N. High Commiss for Refugees, the number of displace people worldwide in 2020 is…
A: ANSWER : According to the UN high commissioner report number of displaced people world wide are…
Q: Discuss how scenario plannin conditions of uncertainty and ca
A: Scenario planning is making presumptions on the thing what's in store will be and how your business…
Q: in the table shown, do each of the following: 1. Draw a precedence diagram. Assuming an eight-hour…
A: A project schedule network diagram shows the sequence of the task that are performed to complete a…
Q: Data has been collected for a machine over a number of weeks and is contained in Table Q6 below. a)…
A:
Q: define the following terms surplus slack
A: Both surplus and slack is a terminology which is used when measuri.g and controlling the operational…
Q: 1. The following precedence network is used for assembling a product. You have been asked to achieve…
A: A project schedule network diagram shows the sequence of the task that are performed to complete a…
Q: Question 1: Considering that the annual demand of a product is 5000 orders, the retention cost is…
A: The quantity with the least total cost of inventory will be ordered. Total cost = Annual…
Q: a. Draw the precedence diagram. b. What is the probability that the project can be completed in 24…
A: A project schedule network diagram shows the sequence of the task that are performed to complete a…
Q: Sunseel Industries produces two types of raw materials, A and B, with a production cost of $4 and $8…
A:
Q: operations* is the right answer
A: A JIT system is a production system that produces goods on demand. The system stores material and…
Q: Below are the production demands for the first four months of the year. What is the 4 month moving…
A: Forecasting is the process of estimating future demand based on previous or historic data and…
Q: Consider the following table which presents information on the returns in million pounds from a…
A: Note: - Since we can answer only up to three subparts we will answer subparts a(1, 2, and 3) here.…
Q: LahLa Mub Delivery a logistics operator process the packages for shipment. The items arrive at the…
A: Service rate is the rate at which the customers are being served by the workers in an organisation.
Q: What are the objectives of construction management?
A: NOTE: We are allowed to do one question only at a time. Please post the rest questions individually…
Q: 1- Total project finishing time 2- Critical path, 3- Free float for each task. • 4- If Activity B is…
A: The critical path is the path with the longest duration.
Q: The Fly-Right Airplane Company builds small jet airplanes to sell to corporationsfor the use of…
A: Note: - As it is specified to answer number 1 only we will answer number 1 here. Given data is…
Q: Operations Management 5. List and explain at least five efficiency evaluation metrics for collection…
A: One of the most important roles of any collections agency or collection department is to efficiently…
Q: Question 9 Given the below network, what is the maximum flow from node 1 to node 6? 12 20 10 18 16…
A: Maximum flow issues in optimization theory involve finding a viable flow through a flow network that…
Q: • Q2:Find out the completion time and the critical activities for the following project: D 20 B E H…
A: A critical path in the project management is the most elongated series of activities that must be…
Step by step
Solved in 2 steps
- In 4 weeksMark earns an average of $400 per weekIf, after working another 2 weeks at constant salary , his average earnings per week are $500, how much did he earn in the last 3 weeks?Your hospital has built a new freestanding facility that includes a 36-bed medical telemetry care unit. The patients and staff from the existing smaller units will be combine into the new unit. The current budget for each of these units is: unit a- average daily census 11.9 unit b- average daily census 22.0 unit a- acuity 1.6 unit b- acuity 1.85 unit a- workload 3.8 unit b-workload 3.6 unit a- productivity % 19.0 unit b- productivity % 16.5 the budgets of the two units will be combine with no changes. Calculate the budget for the new unit including the ADC, acuity, workload, hours per patient day (HPPD), shifts/24 hours, productivity factor and variable direct care full time equivalents.2. Jamila wants to set up a manufacturing unit, so she meets with Rashid, a humanresource manager at her company. Rashid explains that in order to decide on thehuman resource needs for the unit, they should conduct a workflow analysis. Shesuggests they start by defining the outputs of the process. To do this, what shouldJamila define?A) the processes that will be involved in manufacturingB) the number of people required for productionC) the type of products that will need to be manufacturedD) the special equipment, facilities, and systems needed for productionE) the data and information needed by the work unit
- Tax Prep Advisers, Inc., has forecasted the following staffingrequirements for tax preparation associates over the next12 months. Management would like three alternative staffingplans to be developed. The company currently has 10 associates. No more than 10new hires can be accommodated in any month because oflimited training facilities. No backorders are allowed, andovertime cannot exceed 25 percent of regular-time capacityon any month. There is no cost for unused overtime capac-ity. Regular-time wages are $1,500 per month, and overtimewages are 150 percent of regular-time wages. Undertime ispaid at the same rate as regular time. The hiring cost is $2,500per person, and the layoff cost is $2.000 per person.a. Prepare a staffing plan utilizing a level workforce strategy,minimizing undertime. The plan may call for a one-timeadjustment of the workforce before month 1.b. Using a chase strategy, prepare a plan that is consistent withthe constraint on hiring and minimizes use of overtime.c.…Climate Control, Inc., makes expedition-quality rain gearfor outdoor enthusiasts. Management prepared a forecast ofsales (in suits) for next year and now must prepare a produc-tion plan. The company has traditionally maintained a levelworkforce strategy. All nine workers are treated like familyand have been employed by the company for a number ofyears. Each employee can produce 2,000 suits per month.At present, finished goods inventory holds 24,000 suits. Thedemand forecast follows: Use the Sales and Operations Planning with SpreadsheetsSolver in OM Explorer or develop your own spreadsheetmodels to address the following questions. a. Management is willing to authorize overtime in pe-riods for which regular production and current lev-els of anticipation inventory do not satisfy demand.However, overtime must be strictly limited to no morethan 20 percent of regular-time capacity. Managementwants to avoid stockouts and backorders and is notwilling to accept a plan that calls for shortages.…b. The Healthy Food Restaurant, a 24-hour restaurant, faces changing requirements from hour tohour. More workers are needed for peak hours, and fewer are needed in between. The followingTable 6 (below) shows the worker requirement for the first 12 hours in the restaurant:Table 6. Staff Requirement at the Healthy Food RestaurantTime Period 10AM11AM12PM1PM2PM3PM4PM5PM6PM7PM8PM9PMRequirement 8 10 12 12 9 7 6 7 9 10 12 8AssignedOn DutyOverstaffed8(i) You are required to apply the first-hour principle to staff each hour with the required number ofcafeteria staff, showing how many staff are on duty each given hour, the number of staffyou have assigned to work each hour and any overstaffing for each hour. i. Schedule the staff to work in 8-hour shifts.
- A Manager’s Woes Kyle Peschken has been a manager for the discount store Zelmart for the past two years. It’s time for his annual performance review, and Kyle would like to make a big impression on the corporate staff. Walking through the store, he makes a mental note of which departments need to be straightened, which ones need to be reorganized, and which employees he’d like to schedule during the week of his review. And then he sees it—blocking the aisles, creating commotion, and looking very unprofessional—the long line in the electronics department. It’s time to confront Chris, the sales clerk. “Chris, what’s the holdup here?” “I’mwaiting for a manager to approve this $120 check. And then I have to show this lady a digital camera from the display cabinet. She’s been waiting half an hour, and then . . . .” “Alright Chris . . . I can help out for a while . . .Two hours later, Kyle exited the electronics department disheartened. That’s no way for a store manager to spend his…Jack has gathered the following information for Work Center 2, the work center that directly feeds Work Center 3. Complete the input/output analysis of Work Center 2. Input Information(in hours) 4 5 6 7 8 Planned input 60 70 70 80 80 Actual input 15 25 25 30 30 Output Information(in hours) 4 5 6 7 8 Planned output 40 70 70 80 80 Actual output 45 45 45 55 80 Backlog165 hours Jack has asked you to calculate the following for Work Center 2. (a) Calculate the percentage of planned output needed to complete the planned inputs [(planned input + backlog)/ planned output] at Work Center 2.(Round your answers to 1 decimal place, e.g. 17.5.) 4 5 6 7 8 Percentage of planned output · 100% enter percentages % enter percentages Percentages shoul be # 4 through 8Jack has gathered the following information for Work Center 2, the work center that directly feeds Work Center 3. Complete the input/output analysis of Work Center 2. Input Information(in hours) 4 5 6 7 8 Planned input 60 70 70 80 80 Actual input 15 25 25 30 30 Output Information(in hours) 4 5 6 7 8 Planned output 40 70 70 80 80 Actual output 45 45 45 55 80 Backlog165 hours Jack has asked you to calculate the following for Work Center 2. alculate the percentage of planned input that actually happened [(actual input + backlog)/(planned input + backlog)] at Work Center 2.(Round your answers to 1 decimal place, e.g. 17.5.) 4 5 6 7 8 Actual input + Backlog Planned input + Backlog · 100% enter percentages % enter percentages % enter percentages % enter percentages % enter percentages %
- Perform a 5 Whys process and the solutions that came up from the analysis. The problem is time management. 1.Why is it so difficult for us to manage our time?Suds and Duds Laundry washed and pressed the followingnumbers of dress shirts per week.Week Work Crew Total Hours Shirts1 Sud and Dud 24 682 Sud and Jud 46 1303 Sud, Dud, and Jud 62 1524 Sud, Dud, and Jud 51 1255 Dud and Jud 45 131a. Calculate the labor productivity ratio for each week.b. Explain the labor productivity pattern exhibited by thedata.A time study involving the preparation of hamburgers at Bill’s fast-food restaurant used the snap-back method to obtain the data (in minutes) shown below. Allowances typically constitute 15% of normal time. The schedule calls for 300 hamburgers to be prepared during the lunch rush. If each part-time employee works 190 minutes per day, how many employees will be needed? Observation Work Element 1 2 3 4 5 t F RF NT 1. Prepare Patty 0.45 0.41 0.50 0.48 0.36 1 0.9 2. Cook First side 0.85 0.81 0.77 0.89 0.83 1 1.2 3. Flip, press, and cook the other side 0.60 0.55 0.59 0.58 0.63 1 1.2 4. Assemble 0.31 0.24 0.27 0.26 0.32 1 1.0 Show work