City Administrator plans to restraint private car usage. The restraint is expected to increase the demand for public transport service. You are required to examine the following two routes: (a) The demand for LRT service from A to B is expected to increase during peak hours to 41,000 passengers per hour per direction. The headway must not be less than 120 seconds and must not be greater than 300 seconds. The station design is adequate for 10 coaches and the capacity of each coach is 280 passengers. Compute headway possibilities and corresponding number of coaches per train. You may use rail utilisation factor of 0.75 and load factor of 0.9. (b) Bus service between C and D is one of the services that has to be studied. One-way travel time has been decided to be not greater than 50 minutes. Expected peak hour demand is 3,800 passengers per hour per direction. The bus has 45 sitting and 20 standing capacity. Headway shall not be greater than 5 minutes and waiting time at terminal shall not be less than 5 minutes. Compute: (i) Actual headway. (ii) Cycle time (travel time for both direction and terminal waiting time (iii) The number of buses required for the service. (iv) Actual waiting time at the terminal.

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Topic Video
Question

City Administrator plans to restraint private car usage. The restraint is expected to increase the demand for public transport service. You are required to examine the following two routes:
(a) The demand for LRT service from A to B is expected to increase during peak hours to 41,000 passengers per hour per direction. The headway must not be less than 120 seconds and must not be greater than 300 seconds. The station design is adequate for 10 coaches and the capacity of each coach is 280 passengers. Compute headway possibilities and corresponding number of coaches per train. You may use rail utilisation factor of 0.75 and load factor of 0.9.

(b) Bus service between C and D is one of the services that has to be studied. One-way travel time has been decided to be not greater than 50 minutes. Expected peak hour demand is 3,800 passengers per hour per direction. The bus has 45 sitting and 20 standing capacity. Headway shall not be greater than 5 minutes and waiting time at terminal shall not be less than 5 minutes.
Compute:
(i) Actual headway.
(ii) Cycle time (travel time for both direction and terminal waiting time
(iii) The number of buses required for the service.
(iv) Actual waiting time at the terminal.

Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Optimization
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, advanced-math and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,