In a transportation problem with 7 sources and 6 destinations, how many fixed requirement constraints will be nee- Number of fixed requirement constraints
Q: A minimum-cost flow problem has 5 supply nodes, 0 transshipment nodes, and 8 demand nodes. If each…
A: Given, Demand- 8 Supply- 5
Q: Consider the following network representation of a transportation problem: Des Moines 25 14…
A: Formula:
Q: A tile company distributes white bathroom tiles which are produced in 3 manufacturing plant: A, B,…
A: Transportation method : The objective is to minimize the costs and also to meet the demand. The…
Q: A firm has 4 plants that produce widgets. Plants A, B, and C can each produce 100 widgets per day.…
A: Shipping costs are described as the costs associated with the movement of a commodity or a cargo…
Q: TRANSPORTATION METHOD: INSTRUCTIONS: Solve for the optimal distribution and cost of transportation…
A: Given Data Project A Project B Project C Project D Supply Depot1 5 7 3 4 120000 Depot2…
Q: A firm has 4 plants that produce widgets. Plants A, B, and C can each produce 100 widgets per day.…
A: From the given information, the transportation problem can be tabulated as follows.
Q: A store has requested a manufacturer to produce pants and sports jackets. For materials, the…
A: THE ANSWER IS AS BELOW:
Q: A minimum-cost flow problem has 8 supply nodes, O transshipment nodes, and 7 demand nodes. If each…
A: The detailed solution is given in Step 2.
Q: PRODUCT MIX: The JP Manufacturing Company produces two products. Resource requirements for…
A: Decision Variable:Suppose- A be the no. of units produced per week of the product ‘A’ B be the…
Q: The Sanders Garden Shop mixes two types of grass seed into a blend. Each type of grass has been…
A: Introduction:The given problem is a linear programming Cost Minimization problem. The problem is…
Q: An XYZ company has a W, H, O plant with a monthly production capacity of 60 tons, 50 tons, and 42…
A:
Q: Vogel’s Approximation Method (VAM) for initial basic feasible solution Find the optimal solution…
A: The transportation model is used to calculate the minimum cost of the route by selecting different…
Q: How many cases should be shipped from each warehouse to minimize costs
A: Transportation problem helps to identify the optimal cost allocation between different destinations.…
Q: Markus, Inc., has harvested 400 tons of lumber from a pine forest located outside of Manchester, 200…
A: Here, They need to maximise the profits or they would work on minimising the applicable costs.…
Q: A minimum-cost flow problem has 6 supply nodes, 0 transshipment nodes, and 5 demand nodes. If each…
A: Find the given details below: Given details: Supply nodes 6 Transshipment nodes 0 Demand…
Q: The Ayatola Oil Company controls two oil fields. Field 1 can produce up to 40 million barrels of oil…
A: If S1 and S2 represent the oil production at Field 1 and 2 respectively. So, S1= 40 and S2= 50 Let…
Q: How many cases should be shipped from each warehouse to minimize costs
A: A transportation problem identifying the optimal cost for transporting the items from source station…
Q: A university computer center is open from 8 AM until midnight. The numbers of computer consultants…
A: Find the Given details below:
Q: TRANSPORTATION Deluxe River Cruises operates a fleet of river vessels. The fleet has two types of…
A:
Q: A truck must travel from New York to Los Angeles. As shown in the network below, several routes are…
A: Using the shortest path method, Node 1 is designated as the current node. Node 2, 3 and 4 can be…
Q: Solve the problem. 8) Chelsea Avanos is searching for a job. She lives in Winston-Salem, North…
A: Given data is
Q: State University must purchase 1,100 computers from three vendors. Vendor 1 charges $500 per…
A: Integer programming: Integer programming represents the optimization of a linear function directed…
Q: General Ford produces cars at L.A. and Detroit and hasa warehouse in Atlanta; the company supplies…
A: a. Enter the data in Excel and solve the transportation problem as shown below:
Q: Betty Malloy, owner of the Eagle Tavern in Pittsburgh, is preparing for Super Bowl Sunday, and she…
A: Linear programming problem is a problem which helps in maximizing or minimizing solution. Here in…
Q: Determine the solution space and the optimum solution of the Reddy Mills model for each of the…
A: To acquire the arrangement space, first, register the conditions for the given free changes. The…
Q: A company manufactures two products Q and W on three machines A, B and C. Q requires 1 hrs on…
A: Let x amount of product Q and y amount of product W constitute the product mix.
Q: A minimum-cost flow problem has 4 supply nodes. O transshipment nodes, and 5 demand nodes. If each…
A: Given - No. of supply nodes = 4 No. of demand nodes = 5
Q: A company supplies goods to three customers, who each require 30 units. The company has two…
A: Suppose a company supplies goods to three customers, and each of them require 30 units. The company…
Q: A Company has 3 production facilities S1, S2 and S3 with production capacity of 7, 9 and 18 units…
A: In the 1st column, The smallest transportation cost is 19 in cell S1D1The allocation to this cell is…
Q: 1. In a transportation problem with 4 sources and 5 destinations, how many shipping lanes will…
A: Hence, the number of shipping lanes are 20.
Q: At the end of a cycle of schedules, a trucking firm has a surplus of one vehicle each in cities A,…
A: Find the Given details below: Given details: 1 2 3 4 5 6 A 9 22 58 11 19 27 B 43 78 72…
Q: The optimal solution to the original Grand Prix problem indicates that with a unit shipping cost of…
A: SolverTable is used to determine how much the cost for shipping must decrease for units to start be…
Q: Use linear programming and the graphing approach to find the optimal solution to the following…
A: Given Information:
Q: Or lein an initial feasible solution to the following Transportation Problem using the matrix minima…
A: Note: - Since the exact question that has to be answered is not specified we will answer the first…
Q: Describe the type of problem that would lend itself to solution using linear programming.
A: Linear Programming is a quantitative method that is used by operations managers extensively to…
Q: Quant A company produces two products, X and Y, which use material and labor as inputs. Fixed…
A: Given data is
Q: TowAlongmakes trailers at plants in Kansas City, Denver, and Raleigh and ships these units to…
A: Answer: Based on the given table, we tabulate the data in excel as shown below: Since, total…
Q: A company has four warehouses and six stores. The warehouses altogether have a surplus of 22 units…
A: Given Information:
Q: Seven types of packages are to be delivered by fivetrucks. There are three packages of each type,…
A: In a maximum flow problem, the maximum amount of flow that a network allows to flow from source to…
Q: e. Use VAM to obtain the initial solution for the transportation model below: Minimize Z = (21x11…
A: From the given problem, the transportation problem can be tabulated as follows. A B C D…
Q: Find D, the input-output matrix for this system. D = ? Solve for the output matrix X in the…
A: Inventory management refers to taking decisions regarding the amount of stock that needs to be…
Q: A product is manufactured by four factories A, B, C and D. The unit production costs in them are ETB…
A: Find the Given details below: Given details: Factories/Stores 1 2 3 4 Capacity Production cost…
Q: This question earns extra credit up to 8pts. The problem requires using the transportation method of…
A: Given- Regular time cost = $60Overtime cost = $110Subcontracting cost = $120Inventory Holding cost =…
Q: PRODUCT MIX: The JP Manufacturing Company produces two products. Resource requirements for…
A:
Q: na transportation problem with 4 sources and 4 destinations, how many fixed requirement constraints…
A: In transportation problem with 4 sources and 4 destinations, the fixed requirement constraints will…
Q: A Company has 3 production facilities S1, S2 and S3 with production capacity of 7, 9 and 18 units…
A: TOTAL number of supply constraints : 3TOTAL number of demand constraints: 4Problem Table is D1…
Q: The town of Lexington purchases gasoline from threevendors to fuel its fleet of municipal vehicles.…
A: Let Xjk be the number of truckloads delivered from vendor-j to customer-k for j=A, B, C and k=1…
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- The demand for subassembly S is 100 units inweek 7. Each unit of S requires 1 unit of T and 2 units of U.Each unit of T requires 1 unit of V, 2 units of W, and 1 unit ofX. Finally, each unit of U requires 2 units of Y and 3 units ofZ. One firm manufactures all items. It takes 2 weeks to makeS, 1 week to make T, 2 weeks to make U, 2 weeks to make V,3 weeks to make W, 1 week to make X, 2 weeks to make Y,and 1 week to make Z.a) Construct a product structure. Identify all levels, parents,and components.b) Prepare a time-phased product structure.Please help solve the solution below. I need to have this done in 45 minutes and I am struggling to solve my last questions. Problem 2: Comp-Max Computers assembles computers and computer equipment. It is about to start production of threenew types of computers, called model X, Y, and Z, respectively. Each type will require assembly time, inspection time, andstorage space. The availability of each of these resources is limited. Specifically, available assembly time is 400 hours, available inspection time is 300 hours, and available storage space is 500 cubic feet (about 14.2 ms). The amount of eachresource required for the different products is reported in the table below. Model X earns a profit of $100 per unit, model Yearns a profit of $125 per unit, and model 2 earns a profit of $200 per unit. Due to some prior agreements with customers,Comp-Max must produce at least 12 model X computers. In addition, management requires that the fraction of totalproduction made up of model 2…Courtney Kamauf schedules production of a popularRustic Coffee Table at Kamauf Enterprises, Inc. The table requires a top, four legs, 1 8 gallon of stain, 1 16 gallon of glue, 2 short braces betweenthe legs and 2 long braces between the legs, and a brass cap that goeson the bottom of each leg. She has 100 gallons of glue in inventory,but none of the other components. All items except the brass caps, stain, and glue are ordered on a lot-for-lot basis. The caps are pur-chased in quantities of 1,000, stain and glue by the gallon. Lead time is 1 day for each item. Schedule the order releases necessary to pro-duce 640 coffee tables on days 5 and 6, and 128 on days 7 and 8.
- Exercise 4 a) Write the objective function of this LP.b) Write the constraint of the basic element Y.c) Write the constraint that expresses"the factional contributions from each mine must add up to 1."d) What is the optimal fraction of a ton to be chosen from mine 4?e) To make the optimal fraction of a ton to be chosen from mine 4 non-zero, how should the cost per ton of ore from mine 4 change?f) If the minimum requirement amounts of basic element X increases to 7 tons, how much does the cost of a feasible blend (i.e., the value of the objective function) become?g) If the minimum requirement amount of basic element Z decreases to 25 tons, how much does the cost of a feasible blend (i.e., the value of the objective function) become?I need explaination and spreadsheet with formulas and step to step interpretation please.....The attached are first two pages of required assisance and below is the rest of instructions please consider all of them:c. Suppose the CEO says, “Projects 3 and 4 must be undertaken but not both.”Describe the constraint.d. Suppose the CEO says, “Projects 4 cannot be undertaken unless projects 1 and 3also are both undertaken.” Describe the constraints. Hint: You may need to add more than one constraint for this part.3. Multi-product Production Planning. Hart Manufacturing makes three products. Each product requires manufacturing operations in three departments: A, B, and C. The labor-hour requirements, by department, are as follows:Department Product 1 Product 2 Product 3A 1.50 3.00 2.00B 2.00 1.00 2.50C 0.25 0.25 0.25During the next production period, the labor-hours…Wormwood, Ltd., produces a variety of furniture products. The planning committee wants to prepare an aggregate plan for the next six months using the following information.Month1 2 3 4 5 6Demand 160 150 160 180 170 140CapacityRegular 150 150 150 150 160 160Overtime 10 10 0 10 10 10Cost Per UnitRegular time $50Overtime 75Subcontract 80Inventory holding, per month 4Subcontracting can handle a maximum of 10 units per month. Beginning inventory is zero.Develop a plan that minimizes total cost. No back orders are allowed. Regular capacity = Regularproduction.
- Maxwell Manufacturing makes two models of felt tip marking pens. Requirements for each lot of pen...Maxwell Manufacturing makes two models of felt tip marking pens. Requirements for each lot of pens are given below.Fliptop Model Tiptop Model AvailablePlastic 3 4 36Ink Assembly 5 4 40Molding Time 5 2 30The profit for either model is $1000 per lot.What is the linear programming model for this problem?What are the boundary points of the feasible region?What is the profitability at each boundary point of the feasible region?Find the optimal solution.do not need to solve thr problem, jsit crrate the linear program.Comprehensive Problem 1Part 8: The following is a comprehensive problem which encompasses all of the elements learned in previous chapters. You can refer to the objectives for each chapter covered as a review of the concepts. NOTE: You must complete parts 1, 2, 3, 4, 6 and 7 before completing part 8. Part 5 is optional. Prepare an income statement.
- Nice-Fit is a (fictional) small business producing outfits for costume parties and specialoccasions. Custom designs can be tailored to a customer’s request. Tom and Ann are theowners of the company and source all the fabric, design the outfits and make the costumesthemselves. Tom and Ann keep spreadsheets with information on the material purchased andcostumes made, but they find it difficult to keep track of their products, raw materials, andsales. The raw materials are supplied from a fabric company in India, and the production takesplace in a manufacturing company in China. The clothing is sold at local weekend markets,sold, or rented through costume hire shops, and sold at their physical store. Tom and Annreceive a small percentage of the sales and rentals of their costumes from the hire shops.They have no information on customers other than those who request custom designsdirectly from them. In 2020, the Covid-19 pandemic had a major impact on global economies,businesses and how we…A) What is the theoretical minimum number of workstations? a. 3 workstations b. 3.5 workstations c. 3.83 workstations d. 4 workstations e. 5 workstations B) Which of the following statements is FALSE? a. Tasks A, B, and C can be started as soon as possible. b. All of the tasks A, B and C should be finished first before task F can be started. c. All of the tasks A through H should be finished first before task I can be started. d.All of the tasks B, E, C and F should be finished first before task H can be started. Answer the two questions please.Radiant wants to hire planes to transport three types of goods- A, B, and C. They contacted VIP Transportation Company to hire Cargo planes. VIP informed that they can provide two types of Cargo Planes, and they have only 80 of each type of plane. In addition they provided the following Weight related information about the two types Cargo planes- WT88 and BH54: Goods A Goods B Goods C WT88 Can carry 20 tons 10 tons 20 tons BH54can carry 25 tons 20 tons 15 tons Radiant has to transport 500 tons of Goods A, 500 tons of Goods B, and 500 tons of Goods C. VIP charges $2800 for each WT88 and $1200 for BH54. Under the above circumstances, find out the following using Linear Programming: What will be the minimum cost to transfer the required goods? How many of WT88 and BH54 Radiant should hire? Can you check my answer is correct? Data Goods A Goods B Goods C VIP Charge WT88 can carry 20 10 20 $…