PRODUCT MIX: The JP Manufacturing Company produces two products. Resource requirements for production are given in the table. There are 1500 hours of assembly worker hours available per week, 600 hours of paint time, and 200 hours of the inspection time. Regular customers will demand at least 150 units of the regular line and 90 of the super. Formulate a Linear Programming(LP) model that will determine the optimal product mix on a weekly basis. Product Profit contribution Assembly time (hr) Paint time (hr) Inspection time (hr) Product A 50 1 1/2 1/5 Product B 75 1.5 3/4 1/5
Q: What is the importance of a Project Charter?
A: A Small Introduction about Project Charter A venture sanction is a formal, normally short record ...
Q: 1) Who are/is the responsible decision makers? 2) What are the rights of the skatemakers? 3) What...
A: The legal issues that occur when companies monitor their workers' activities are covered under workp...
Q: Troy and Tristan have decided to open a competitive Cheer and Dance business. Troy’s expertise is in...
A: given, Troy and Tristan have decided to open a competitive Cheer and Dance business. Troy’s expertis...
Q: Borges Machine Shop, Inc., has a 1-year contract for the production of 225,000 gear housings for a...
A: Given data is
Q: Compare and contrast the focus on reducing the cost era with the focus on quality era within the ev...
A: Operations management is a wide field and has a long process chain from sourcing raw materials to de...
Q: How many columns had to be selected to create this chart? Product Line - Units Sold This year Last y...
A: From the given chart the approximate values are given below.
Q: ABC Ltd. Wants to choose the best location for its new aluminum plant. The manager of productions an...
A: Breakeven analysis for facility location is a method to determine the optimal location which has the...
Q: w = 4y, +8y2 subject to: 6y +Y2 260 15y, +y2 2 105 Y20, y2 20 Use the simplex method to solve. Minim...
A: Given LP- MIN W = 4y1 +8y2Subject to constraint-6y1+ y2≥6015y1+ y2≥105y1≥0 , y2≥0
Q: 3. A manager checked production records and found that a worker produced 160 units while working 40 ...
A:
Q: Question 12 Taguchi's main approach to quality was to: O Ignore quality issues, hoping that numbers ...
A: Quality relates to the group of inherent effects of an object that permits satisfying expressed &...
Q: You're trying to lay out your t-shirt business office. There are 3 rooms in a row (room 1 | room 2 |...
A:
Q: When visiting the kitchen of King Mclolly Burger restaurant you noticed that there is a wall poster ...
A: Assembly drawing shows the structure or product along with the components that are linked all togeth...
Q: Network Diagrams Exercise 1. For each task build the relevant network diagram 2. Add the task durati...
A: A network diagram is a visual representation of a project which helps to identify the activity relat...
Q: What is the minimum number of weeks required for completing the project? What is the latest possible...
A: D(duration)=given in the question as normal time ES (Early start)= The first activity from where the...
Q: Many special features that we learn are so intriguing that we may want to put them into play immedia...
A: Your website is one of the main aspects of your brand's online presence and you should design it rig...
Q: The appropriate maintenance policy is developed by balancing preventive maintenance costs with break...
A: Breakdown maintenance generally works by operating tools or equipment until it gives out or breaks d...
Q: List 5 claims that are made in the advertisement for the ultrasonic pest repeller.
A: Advertising can be stated as the one-way communication approach whose purpose or motive is to inform...
Q: The HP dvd1040i 20X Multiformat DVD Writer has an MTBF of 70,000 hours. (a) Assuming continuous oper...
A:
Q: The LP problem is given by, Maximize profit 8X1+ 5X 2 Subject to: X1+X2s 10 X1s6 X1 0 X220 Use graph...
A: Linear programming is a technique to reach the best outcome like maximum profit or lowest cost whose...
Q: In a fabric manufacturing factory, the quality control process using control charts from SPC. In an ...
A: Given samples-
Q: Describe the quality of a product based on its dimensions. You may site a specific product and its d...
A: Quality management is the management in which different tasks and activities are managed that helps ...
Q: One of the principles of Management Reporting is, report should be self contained. Explain this prin...
A: Operational reporting is described as the means of providing regular reports on organizational opera...
Q: Q.1// Solve the problem by Vogel's methods and find optimal solutions Using The Multipliers method?
A: Given data is
Q: Given the Exponential Smoothing Method, Actual Demand alpha = .25 and Forecast Demand alpha = 0.75, ...
A:
Q: As a regional manager in collaboration with other supply chain partners, which type of inventories w...
A: A supply chain can be stated as the entire framework of manufacturing and distributing an item or se...
Q: Network Diagrams Exercise 1. For each task build the relevant network diagram 2. Add the task durati...
A: A network diagram is visual representation of a project which helps to identify the Activity relatio...
Q: Describe the three [3] types of utility under global infrastructure
A: Global Infrastructure is a platform that enables various areas throughout the globe to collaborate b...
Q: Solve the questions: Tony and his team identified some risks during the first month of the Recreatio...
A: given, : Tony and his team identified some risks during the first month of the Recreation and Wellne...
Q: The Acme Class Ring Company designs and sells two types of rings: the VIP and the SST. They can prod...
A: A production problem solving using linear programming problem will identify the right number of item...
Q: SELCO has attempted to institutionalize the design process at the company. What are the pros and con...
A: The design process in companies has varying importance depending on the type of product or service t...
Q: show instruction how to do them. Add a new scenario to compare the profit with maximum enrollments...
A: The formulas used in the sheet: Copyable formulas: Maxwell training Orientation Te...
Q: Tsinelas Corporation compares its standing to its strongest rival in the footwear industry. Tsinelas...
A: Market analysis is described as the qualitative and quantitative assessment that looks into the mark...
Q: What are the different types of costs which you may have to bear on operating a warehouse?
A: Warehouse management is described as the processes that include the operations carried out in a ware...
Q: Explain the things you would include in a monthly project progress report
A: Project status report is nothing but timely amends on the progress of the projects operating in the ...
Q: Discuss Operations System (input-output system) and scope of Operations Management.
A: Operations management (OM)is the association of vital approaches to make the main degree of efficien...
Q: The company L. Houts Plastics is a large manufacturer of injection- molded plastics in North Carolin...
A: Given data is
Q: A piece of machinery can be bought for 10,000 cash or for 2000 down and payment of 700 per year for ...
A: The detailed solution is given in Step 2.
Q: BIG produces four types of yogurts A, B, C, and D. Each box of yogurt carries protein, sugar, and Fa...
A: As mentioned in the question, the company wants to minimize the production cost. Hence, it is a mini...
Q: EFG Company provided you that during the year there will be 50 deliveries of material H. The carryi...
A: An annual volume of required material would be the some of EOQ multiplied by number of orders. An EO...
Q: It Is the concept that can be applied to both products and services. a. logistics b. supply chain ...
A: a. logistics:- Logistics is only related to the delivery of goods or movements of finished products....
Q: 1. The following solved problems refer to this payoff table: New Bridge Built No New Bridge 14 Alter...
A: Given- Payoff Table-
Q: Don’t Drink And Drive Brewery (DDAD) produces beer and ale. Beer sells for $5.70 per barrel, and ale...
A: Production planning is the demonstration of fostering an aide for the design and production of a giv...
Q: Explain the following concepts using at least two sentences. (a) hazrd (b) onsequence ...
A: Note- Hi! Thank you for the question, As per the honour code, we are allowed to answer three sub-par...
Q: The statement that best to describe the productivity challenge is, except. Group of answer choices ...
A: Productivity relates to the physical connection between the quantity yielded (output) & the no. ...
Q: how do we solve optimization problem
A: Optimization problems are those whose objective is either to maximize or minimize. Maximization is a...
Q: Which quality program used the Cause-and-Effect diagram to identify causes of quality problems? a. I...
A: The quality management system is described as the process of a formalizing system that documents res...
Q: Question 3 Which of the following are parts of the PCDA cycle? (select all that apply) Diagnose O As...
A: PDCA cycle also known as Plan, Do, Check, Act cycle is considered a project planning tool is used w...
Q: Maya ltd. wants to use the Centre of Gravity location technique to determine where to setup its dis...
A: Location decision is the process of selecting a suitable location for the business from different al...
Q: Explain the things you would include in a monthly project report progress report
A: Project management is the management in which different types of skills and knowledge are required t...
PRODUCT MIX: The JP Manufacturing Company produces two products. Resource requirements for production are given in the table. There are 1500 hours of assembly worker hours available per week, 600 hours of paint time, and 200 hours of the inspection time. Regular customers will demand at least 150 units of the regular line and 90 of the super. Formulate a Linear Programming(LP) model that will determine the optimal product mix on a weekly basis.
Product | Profit contribution | Assembly time (hr) | Paint time (hr) | Inspection time (hr) |
Product A | 50 | 1 | 1/2 | 1/5 |
Product B | 75 | 1.5 | 3/4 | 1/5 |
Step by step
Solved in 2 steps with 4 images
- Green Vehicle Inc., manufactures electric cars and small delivery trucks. It has just opened a new factory where the C1 car and the T1 truck can both be manufactured. To make either vehicle, processing in the assembly shop and in the paint shop are required. It takes 1/25 of a day and 1/60 of a day to paint a truck of type T1 and a car of type C1 in the paint shop, respectively. It takes 1/45 of a day to assemble either type of vehicle in the assembly shop. A T1 truck and a C1 car yield profits of $300 and $220, respectively, per vehicle sold. The optimum solution is: Number of trucks to be produced per day = ? (round your response to two decimal places).Green Vehicle Inc., manufactures electric cars and small delivery trucks. It has just opened a new factory where the C1 car and the T1 truck can both be manufactured. To make either vehicle, processing in the assembly shop and in the paint shop are required. It takes 1/25 of a day and 1/60 of a day to paint a truck of type T1 and a car of type C1 in the paint shop, respectively. It takes 1/45 of a day to assemble either type of vehicle in the assembly shop. A T1 truck and a C1 car yield profits of $300 and $220, respectively, per vehicle sold. The aim of the objective function for Green Vehicle Inc. should be to Maximize the objective value. Part 2 The optimum solution is: Number of trucks to be produced per day = ? enter your response hereGreen Vehicle Inc., manufactures electric cars and small delivery trucks. It has just opened a new factory where the C1 car and the T1 truck can both be manufactured. To make either vehicle, processing in the assembly shop and in the paint shop are required. It takes 1/40 of a day and 1/75 of a day to paint a truck of type T1 and a car of type C1 in the paint shop, respectively. It takes 1/45 of a day to assemble either type of vehicle in the assembly shop. A T1 truck and a C1 car yield profits of $275 and $225, respectively, per vehicle sold. The aim of the objective function for Green Vehicle Inc. should be to Maximize the objective value. The optimum solution is: Number of trucks to be produced per day = nothing (round your response to two decimal places).
- The Johnny Ho Manufact uring Company in Columbus, Ohio, is putting out four new electronic components. Each of Ho's four plants has the capacity to add one more productto its current line of electronic parts. The unit-manufacturing costs for producing the different parts at the four plants are shown in the accompanying table. How should Ho assign the new products to the plants to minimize manufacturing costs?The Barberton Municipal division of Road Maintenance is charged with road repair in the city of Barberton and the surrounding area. Vijay Gupta, road maintenance director, must submit a staffing plan for the next year based on a set schedule for repairs and on the city budget. Gupta estimates that the labor hours required for the next four quarters are 6,000, 12,500, 20,000, and 9,500, respectively. Each of the 11 workers on the workforce can contribute 500 hours per quarter. Payroll costs are $6,000 in wages per worker for regular time worked up to 500 hours, with an overtime pay rate of $17 for each overtime hour. Overtime is limited to 20 percent of the regular-time capacity in any quarter. Although unused overtime capacity has no cost, unused regular time is paid at $12 per hour. The cost of hiring a worker is $3,400, and the cost of laying off a worker is $1,800. Subcontracting is not permitted. (Hint: When calculating the number of workers, make sure to round up to the…The Barberton Municipal division of Road Maintenance is charged with road repair in the city of Barberton and the surrounding area. Vijay Gupta, road maintenance director, must submit a staffing plan for the next year based on a set schedule for repairs and on the city budget. Gupta estimates that the labor hours required for the next four quarters are 6,500 , 12,500 , 19,500 , and 10,000 , respectively. Each of the 11 workers on the workforce can contribute 500 hours per quarter. Payroll costs are $ 6,000 in wages per worker for regular time worked up to 500 hours, with an overtime pay rate of $ 19 for each overtime hour. Overtime is limited to 20 percent of the regular-time capacity in any quarter. Although unused overtime capacity has no cost, unused regular time is paid at $ 12 per hour. The cost of hiring a worker is $ 3,600 , and the cost of laying off a worker is $ 1,000. Subcontracting is not permitted. (Hint: When calculating the number of workers,…
- The Barberton Municipal division of Road Maintenance is charged with road repair in the city of Barberton and the surrounding area. Cindy Kramer, road maintenance director, must submit a staffing plan for the next year based on a set schedule for repairs and on the city budget. Kramer estimates that the labor hours required for the next four quarters are 7,000, 12,500, 19,500, and 9,000, respectively. Each of the 11 workers on the workforce can contribute 500 hours per quarter. Payroll costs are $6,000 in wages per worker for regular time worked up to 500 hours, with an overtime pay rate of $17 for each overtime hour. Overtime is limited to 20 percent of the regular-time capacity in any quarter. Although unused overtime capacity has no cost, unused regular time is paid at $12 per hour. The cost of hiring a worker is $3,300, and the cost of laying off a worker is $1,400. Subcontracting is not permitted. (Hint: When calculating the number of workers, make sure to round up to…The Barberton Municipal division of Road Maintenance is charged with road repair in the city of Barberton and the surrounding area. Cindy Kramer, road maintenance director, must submit a staffing plan for the next year based on a set schedule for repairs and on the city budget. Kramer estimates that the labor hours required for the next four quarters are 6,000, 12,000, 19,500, and 9,000, respectively. Each of the 11 workers on the workforce can contribute 500 hours per quarter. Payroll costs are $6,000 in wages per worker for regular time worked up to 500 hours, with an overtime pay rate of $18 for each overtime hour. Overtime is limited to 20 percent of the regular-time capacity in any quarter. Although unused overtime capacity has no cost, unused regular time is paid at $12 per hour. The cost of hiring a worker is $4,000, and the cost of laying off a worker is $1,100. Subcontracting is not permitted. (Hint: When calculating the number of workers, make sure to round up to…The Barberton Municipal division of Road Maintenance is charged with road repair in the city of Barberton and the surrounding area. Cindy Kramer, road maintenance director, must submit a staffing plan for the next year based on a set schedule for repairs and on the city budget. Kramer estimates that the labor hours required for the next four quarters are 6,500, 12,000, 19,000, and 9,000, respectively. Each of the 11 workers on the workforce can contribute 500 hours per quarter. Payroll costs are $6,000 in wages per worker for regular time worked up to 500 hours, with an overtime pay rate of $17 for each overtime hour. Overtime is limited to 20 percent of the regular-time capacity in any quarter. Although unused overtime capacity has no cost, unused regular time is paid at $12 per hour. The cost of hiring a worker is $3,300, and the cost of laying off a worker is $1,800. Subcontracting is not permitted. (Hint: When calculating the number of workers, make sure to round up to…
- The Barberton Municipal division of Road Maintenance is charged with road repair in the city of Barberton and the surrounding area. Vijay Gupta, road maintenance director, must submit a staffing plan for the next year based on a set schedule for repairs and on the city budget. Gupta estimates that the labor hours required for the next four quarters are 6,500, 13,000, 20,000, and 9,500, respectively. Each of the 11 workers on the workforce can contribute 500 hours per quarter. Payroll costs are $6,000 in wages per worker for regular time worked up to 500 hours, with an overtime pay rate of $18 for each overtime hour. Overtime is limited to 20 percent of the regular-time capacity in any quarter. Although unused overtime capacity has no cost, unused regular time is paid at $12 per hour. The cost of hiring a worker is $3,400, and the cost of laying off a worker is $1,600. Subcontracting is not permitted. (Hint: When calculating the number of workers, make sure to round up to…Part A is processed on a MILLING machine; Part B is processed on a LATHE machine. Two parts (A and B) are then assembled on an ASSEMBLY machine. Standard times, scrap rates, efficiency, and availability of each machine and the assembly are given in the table below. Determine the number of milling (M), the lathe (L) and the assembly (A) machines needed to produce 100 good parts from this production system during and 8-hour (480 minutes) shift. (Note: Round up the number of parts processed on each station and then round up the number of machines needed).green vehicule Inc. manufactures electric cars and small delivery trucks. it has just opened a new factory where the C1 car and the T1 truck can both be manufactured. to make either vehicle, processing in the assembly shop and the paint shop are required. It takes 1/40 of a day and 1/60 of a paint a truck of type T1 and a car of type C1 in the paint shop, respectively. it takes 1/50 of a day to assemble either type of vehicule in the assembly shop. A t1 truck and a C1 car yield profits of $300 and $220, respectively, per vehicule sold