Labor Quantity Direct / Basic Cost (Yi) unit cost Qi Materials Equipment Wage rate (Php/m2) (Php/kg) (Php/m) Description Labor input (m?) (kg) (m³) unit cost unit cost unit cost (Php) 10Php / 50Php / Formworks 50Php / bt 0.5hr / m? m2 m2 30Php / kg 100Php / bt 20Php / Foundation Rebars 20Php / kg 0.5hr / kg 30Php / Concrete 100Php / br 0.5hr / m m3 m3

Residential Construction Academy: House Wiring (MindTap Course List)
5th Edition
ISBN:9781337402415
Author:Gregory W Fletcher
Publisher:Gregory W Fletcher
Chapter6: Determining Branch Circuit, Feeder Circuit, And Service Entrance
Section: Chapter Questions
Problem 11RQ: Name the ampacity for the following copper conductors according to Table 310.15(B) (16): (Objective...
icon
Related questions
Question
100%

please solve:

C1F1 = 13 set

COLUMN
L/2
L/2
1H
S-3S-3
|BAR D* (LONGITUDINAL
TOP BARS)
12mm THK PEJ FILLER
1w/ SEALANT (TYP)
COLUMN
JBAR C (TRANSVERSE
TOP BARS)
100mm THK SLAB
ON GRADE
150mm THK
GRAVEL BASE
FGL
BAR C
BAR "D
BAR B" (LONGITUDINAL
Твоттом ВARS)
BAR "B".
BAR "A"
150mm THK
1GRAVEL BASE
JBAR "A" (TRANSVERSE
1BOTTOM BARS)
1H SECTION
NOTE:
1.0 FOOTING TIE BEAMS NOT SHOWN.
2.0 REFER TO FOUNDATION PLAN FOR THE LOCATION
OF COLUMN AND FOOTING ORIENTATION.
S-3 S-3
SCALE
1:75
1G F1 DETAIL
5-3 S-3
SCALE
1:75
SCHEDULE OF FOOTINGS
DIMENSIONS (mm)
REINFORCEMENT (mm)
FOOTING
DESIG.
REMARKS
L
LENGTH THICKNESS
BAR "A
BAR "B"
BAR "C"
BAR D"
WIDTH
F1
1000
1000
300
7-416mm
7-016mm
ISOLATED
200
300
010 STIRRUPS,
REST @ 150mm 0.C.
|010 TIES,
REST O 120mm
5-016
1BARS
18-016
VERT. BARS
1B
C1 DETAIL
1C
RB01/RB02 DETAIL
S-4 SCALE
S-4 S-4
1:15
SCALE
1:15
z/M z/M
Transcribed Image Text:COLUMN L/2 L/2 1H S-3S-3 |BAR D* (LONGITUDINAL TOP BARS) 12mm THK PEJ FILLER 1w/ SEALANT (TYP) COLUMN JBAR C (TRANSVERSE TOP BARS) 100mm THK SLAB ON GRADE 150mm THK GRAVEL BASE FGL BAR C BAR "D BAR B" (LONGITUDINAL Твоттом ВARS) BAR "B". BAR "A" 150mm THK 1GRAVEL BASE JBAR "A" (TRANSVERSE 1BOTTOM BARS) 1H SECTION NOTE: 1.0 FOOTING TIE BEAMS NOT SHOWN. 2.0 REFER TO FOUNDATION PLAN FOR THE LOCATION OF COLUMN AND FOOTING ORIENTATION. S-3 S-3 SCALE 1:75 1G F1 DETAIL 5-3 S-3 SCALE 1:75 SCHEDULE OF FOOTINGS DIMENSIONS (mm) REINFORCEMENT (mm) FOOTING DESIG. REMARKS L LENGTH THICKNESS BAR "A BAR "B" BAR "C" BAR D" WIDTH F1 1000 1000 300 7-416mm 7-016mm ISOLATED 200 300 010 STIRRUPS, REST @ 150mm 0.C. |010 TIES, REST O 120mm 5-016 1BARS 18-016 VERT. BARS 1B C1 DETAIL 1C RB01/RB02 DETAIL S-4 SCALE S-4 S-4 1:15 SCALE 1:15 z/M z/M
Labor
Quantity
Direct / Basic
Cost (Yi)
(Php)
unit cost
Qi
Materials
Equipment Wage rate
(Php/m2)
(Php/kg)
(Php/m)
Description
Labor input
(m?) (kg)
(m')
unit cost
unit cost
unit cost
10Php /
50Php /
Formworks
50Php / be
0.5hr / m?
m2
m2
30Php / kg 100Php / bt
20Php /
Foundation
Rebars
20Php / kg
0.5hr / kg
30Php /
Concrete
100Php / br 0.5hr / m
m3
m3
Transcribed Image Text:Labor Quantity Direct / Basic Cost (Yi) (Php) unit cost Qi Materials Equipment Wage rate (Php/m2) (Php/kg) (Php/m) Description Labor input (m?) (kg) (m') unit cost unit cost unit cost 10Php / 50Php / Formworks 50Php / be 0.5hr / m? m2 m2 30Php / kg 100Php / bt 20Php / Foundation Rebars 20Php / kg 0.5hr / kg 30Php / Concrete 100Php / br 0.5hr / m m3 m3
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Control survey and geodetic reductions
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Residential Construction Academy: House Wiring (M…
Residential Construction Academy: House Wiring (M…
Civil Engineering
ISBN:
9781337402415
Author:
Gregory W Fletcher
Publisher:
Cengage Learning