Problem II. The fabricated steel members are being assembled into a truss on-site in the municipality of Alfonso, Cavite. The assembly started at the elevated ground at both sides and is to meet at the midspan. Nearing to the end of construction, it was found that the last member, CD, was fabricated too short by A mm (see the given table in MS teams). The engineer then came up with an idea of applying a force P at joints C and D as shown to close the gap. A in mm = 4.090

Construction Materials, Methods and Techniques (MindTap Course List)
4th Edition
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:William P. Spence, Eva Kultermann
Chapter16: Nonferrous Metals
Section: Chapter Questions
Problem 16RQ
icon
Related questions
Question
I need the correct answer and as soon as possible please
Problem II. The fabricated steel members are being assembled into a truss on-site in the municipality of Alfonso,
Cavite. The assembly started at the elevated ground at both sides and is to meet at the midspan. Nearing to the end
of construction, it was found that the last member, CD, was fabricated too short by A mm (see the given table in MS
teams). The engineer then came up with an idea of applying a force P at joints C and D as shown to close the gap.
A in mm = 4.090
P.
C'
3 m
A
B
3 m
3 m
3 m
Use E = 200 GPa and cross-sectional area of members BC, DE, CD each 4500 mm² while AC and DF being
6363.961 mm²
Determine the necessary force, P, to close the gap in kN.
b) If force P will then be removed after being assembled, calculate the force in CD in kN.
a)
Transcribed Image Text:Problem II. The fabricated steel members are being assembled into a truss on-site in the municipality of Alfonso, Cavite. The assembly started at the elevated ground at both sides and is to meet at the midspan. Nearing to the end of construction, it was found that the last member, CD, was fabricated too short by A mm (see the given table in MS teams). The engineer then came up with an idea of applying a force P at joints C and D as shown to close the gap. A in mm = 4.090 P. C' 3 m A B 3 m 3 m 3 m Use E = 200 GPa and cross-sectional area of members BC, DE, CD each 4500 mm² while AC and DF being 6363.961 mm² Determine the necessary force, P, to close the gap in kN. b) If force P will then be removed after being assembled, calculate the force in CD in kN. a)
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Asphalt binders and mixtures
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Construction Materials, Methods and Techniques (M…
Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning