RMC, Inc., is a small firm that produces a variety of chemical products. In a particular production process, three raw materials are blended (mixed together) to produce two products: a fuel additive and a solvent base. Each ton of fuel additive is a mixture of 2/5 ton of material 1 and 3/5 of material 3. A ton of solvent base is a mixture of 1/2 ton of material 1, 1/5 ton of material 2, and 3/10 ton of material 3. After deducting relevant costs, the profit contribution is $40 for every ton of fuel additive produced and $30 for every ton of solvent base produced. RMC's production is constrained by a limited availability of the three raw materials. For the current production period, RMC has available the following quantities of each raw material: Raw Material Amount Available for Production Material 1 Material 2 Material 3 38 tons 11 tons 39 tons Assuming that RMC is interested in maximizing the total profit contribution, answer the following. (Assume F is the number of tons of fuel additive and S is the number of tons of solvent base.)
RMC, Inc., is a small firm that produces a variety of chemical products. In a particular production process, three raw materials are blended (mixed together) to produce two products: a fuel additive and a solvent base. Each ton of fuel additive is a mixture of 2/5 ton of material 1 and 3/5 of material 3. A ton of solvent base is a mixture of 1/2 ton of material 1, 1/5 ton of material 2, and 3/10 ton of material 3. After deducting relevant costs, the profit contribution is $40 for every ton of fuel additive produced and $30 for every ton of solvent base produced. RMC's production is constrained by a limited availability of the three raw materials. For the current production period, RMC has available the following quantities of each raw material: Raw Material Amount Available for Production Material 1 Material 2 Material 3 38 tons 11 tons 39 tons Assuming that RMC is interested in maximizing the total profit contribution, answer the following. (Assume F is the number of tons of fuel additive and S is the number of tons of solvent base.)
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter4: Linear Programming Models
Section: Chapter Questions
Problem 73P
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 3 images
Recommended textbooks for you
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,