This subject is FOOD PROCESSING FOR ENTREPRENEUR STUDENTS. What are the different food properties related to handle in food processing?
Q: Enumerate and explain the ethical dilemma faced by the different technological advancements. Present…
A: Businesses in recent times are faced with several ethical challenges. Critical alternatives want to…
Q: Canine Kernels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in…
A: So, we have, Demand of product-A = 90 units per week Demand of product-B = 85 units per week Because…
Q: Use the information given below for all questions about this scenario. James Johnson (also known as…
A: Cycle Time = Time available / Units required in given time = 60 minutes /…
Q: The following diagram shows a 4-step process that begins with Operation 1 and ends with Operation 4.…
A: Capacity of any system is equal to its bottleneck process output
Q: The following diagram shows a four-step process that begins with Operation 1 and ends with Operation…
A: Given details: Operation 1: 12/Hour Operation 2: 15/Hour Operation 3: 11/Hour Operation 4: 14/Hour
Q: Describe the bounds, limitations, requirements, proportional relationships, and balance constraints:…
A: Let the weights be as follows: Midterm exam=a Final exam=b Individual assignments=c Class…
Q: The Gardner Theater, a community playhouse, needs to determine the lowest-cost production budget for…
A: Below image gives the cost of production which would be required keeping in mid the time available…
Q: Max's is a bakery shop which sells cookies and cakes. Two workers are in charge of making cookies.…
A: Given: Activities Processing times Wash and mix 8min/order Dish up to trays 2min/dozen Load…
Q: ost-Perry Industries (YPI) manufactures a mix of affordable guitars (A, B, C) that are fabricated…
A: Bottleneck station is the one which has least output capacity. time available = 40 hours time…
Q: With 30 employees and a location in Huston in Zimbabwe's Bompata area, ZARA STORES is a prominent…
A: NOTE- Since you have posted a question with multiple subparts, we will solve the first three…
Q: Three departments- milling (M), drilling (D), andsawing (S)- are assigned to three work areas in…
A: Given data is Cost of move = $2 per piece per foot
Q: XYZ company provides labor and space for the manufacturing and assembly operations and stocking…
A: The operations management, and specifically, the manufacturing department focuses on the layout of…
Q: Explain how the kangan squares operates
A: In way to sustain supply under control, the Kano Squares is placed upon this desk or the surface.…
Q: The Company makes TSHIRTS at their facility in chicago and Minnesota. The process involves three…
A: Capacity utilization = (Available time hours / used time hours) x 100 %
Q: A furniture factory makes two types of wooden tables,large and small. See the flowchart…
A: Capacity of a process To be determined by the capacity of its bottleneck process Represents the…
Q: A product is completed when 18 tasks are done. These tasks are assigned to 6 workstations (each…
A: From the beginning of the first task to the finish of the last task, cycle time is the amount of…
Q: You are the owner of a business and must perform the work of ten clients during the day. It has four…
A: Let the decision variables be Xij where X11 is a binary value which tells us if Collaborator A is…
Q: XYZ Company produces and sells 2 products, Lambda and Gamma, and the production process goes through…
A: a) Plantwide traditional approach: applied rate = Estimated m/o cost/Estimated DLH applied…
Q: Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe,…
A: Given - Daily demand = 62 Time available for manufacturing the shoes = 400 min/day
Q: Kwick Engineering Company (KEC) had received a contract to produce six units of new automated sheet…
A: Tn = T1 x nb b = ln (learning percentage) / ln(2) where ln stands for natural logarithm…
Q: Of the process types below ________ has the highest output variety, and the lowest output volume.…
A: Production is the process of converting inputs into finished products and services for the…
Q: Using the graph below, what technical issue is present in the Mathematical Programming Model, and…
A: Objective function: Max Z = 280M+225S Constraints: 1. 7M+26S≤190,0002. 18M+11S≤220,0003.…
Q: You were just hired as the head strength coach at a NAIA school. You are the first strength coach…
A: Management process in a business is implemented to reduce the time wasted on repetitive tasks. It is…
Q: What do the expressions order winner and order qualifiers mean? What are common order winner for…
A: An order winner is a characteristic that will win the bid or customer's purchase. Therefore, firms…
Q: A company assembles a product that consists of three pieces called AA, BB, and CC. The AA and BB…
A: The total hours which the machine can work in an year: 50 weeks * 5 days * 8 hours = 2000 hours…
Q: Which of the three workstations, W, X, or Y, has the highest aggregate workload, and thus serves as…
A: As per the provided data the information is as follows.
Q: Yost-Perry Industries (YPI) manufactures a mix of affordable guitars (A, B, C) that are fabricated…
A: Underway and project management, a bottleneck is an interaction in a chain of cycles, to such an…
Q: Paper work has grown exponentially with the growth in business; while the locations are connected by…
A:
Q: A Missouri job shop has four departments machin- ** 0.2 ing (M), dipping in a chemical bath (D),…
A: a)
Q: Digos Mineral Inc. is in water refilling. The following information pertains to its operations…
A: Given data is Processing time = 40 minutes Inspection time = 7.5 minutes Waiting time = 7.5 minutes…
Q: Grantsville Cooper Mines employs 1,400 workers. The company must lay off 5% of its workforce…
A: The aforementioned problem is solved as follows:
Q: A bottled water production process is described by the following flowchart. Production Setup 40…
A:
Q: As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material…
A: PART B number of base required for 1 bracket = 1number of base required for 75 brackets = 751)Base =…
Q: WAI knows from historical records that approximately 40percent of its labor is used in Department…
A: Given, Direct Labor Machine time Dept 101 40% 60% Dept 102 60% 40%
Q: Krafts, Inc. uses the decentralized form of organization and considers each of its divisions as an…
A: Transfer price means the price charged by one department or branch of the company from another…
Q: d) What is the idle time per boat produced e) Assign the tasks to workstations using the most…
A: Given That Task Performance Time A 1 B 1 C 2 D 1 E 3 F 1 G 1 H 2 I 1
Q: "Ruby runs a machine design shop that has 4 stages of process in succession. Stage i is cutting that…
A: Given data:
Q: A production schedule requires six work stations. However, there are nine work tasks to be performed…
A: Note: Since you have posted a question with multiple sub-parts, we will solve first three sub-parts…
Q: Yost-Perry Industries (YPI) manufactures a mix of affordable guitars (A, B, C) that are…
A: Given data, Workstation = W, X, Y, Z Overhead cost = $9000/week Production per person per week = 40…
Q: Suppose that a firm is considering moving from a batch process to an assembly-line process to better…
A: A batch process is a production process in which the production results in products coming out in…
Q: Canine Kernels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in…
A: Available minutes per workstation per week = 40 hours × 60 minutes an hour = 2400 minutes The demand…
Q: business takes orders from customers for specific configurations of desktop and laptop computers.…
A: Three basic sorts of assembling creation measures are: make to stock (MTS), specially make (MTO),…
Q: What exactly is PLM? What is the relationship between it and other business software
A: Product life cycle management software is a unique software, which can manages all the relevant…
Q: Rapid-Lube provides oil changes and lubes. The estimated number of oil changes for April and May are…
A: The estimated number of oil changes for April and May =3,600 and 4,000. Each oil change = 12 minutes…
Q: Workshape Manufacturing has two classes of distributors: JIT distributors and non-JIT distributors.…
A: Formula to be used; The activity rate for selling goods = Total activity cost / No. of total sales…
Q: Yost-Perry Industries (YPI) manufactures a mix of affordable guitars (A, B, C) that are fabricated…
A: Given, Demands of A- 60 Demands of B- 96 Demands of C- 66
Q: The Sail-Sea is a boat manufacturer. The assembly location is available for the production of 60…
A: Given that: Production Time = 240 minutes Production Unit = 60 boats
Q: You are the owner of a business and must perform the work of ten clients during the day. It has four…
A: This is an Assignment problem. Given are the execution times in the table for each…
Step by step
Solved in 2 steps
- What is the corner point and explain the reasons why linear programming solutions are focused on corner points in operations ?Lusail Food aims to produce (30,000) units next year. After studying the time, it turned out that each unit needs: Productive work of four hours per unit (job as a production worker) Marketing work of two hours per unit (Job: Marketing Officer) Administrative work of three hours per unit (Job: Administrative)? Currently working in the company: 14 production workers, 6 marketing staff, and 12 administrators. If you know that the average number of annual working hours available is 2500 hours. What is required is to determine the size of the workforce required for the coming year using workload analysis. Number of production units: Unit Next year Function Required working hours / one unit Annual working hours available to the employee next year Required working hours for next year Required workforce for next year Current number of employees For the current year Surplus or deficit In the workforce Next year Production Factor…Please complete all work in excel. Use excel to make any necessary calculations and be sure to identify the answer, including units (if necessary). The Pyrotec Company produces three small kitchen appliances – waffle makers, egg cookers, and toasters. The three products have the following requirements: Resource Requirements Metal Materials/unit Plastic Materials /unit Labor hours/unit Waffle maker 3.1 lb 0.5 lb .7 Egg cooker 1.5 lb 0.7 lb 1 Toaster 2.0 lb 0.3 lb .5 Resource costs are $3 per pound of metal, $2.90 per pound of plastic and $10.00 per hour for labor. Available resources are 200 pounds of metal, 250 pounds of plastic and 350 hours of labor. Based on market research, the company expects the maximum demand for waffle makers is 50 and for egg cookers is 75. The company has a contract to supply 25 toasters to a local department store. Waffle makers will be sold for 24.99, egg cookers will be sold for 19.99 and…
- XYZ Company produces and sells 2 products, Lambda and Gamma, and the production process goes through two departments. Traditionally Manufacturing Overhead (M/O) cost is applied on the basis of direct labor hours (DLH); estimated M/O cost is $ 5,757,500 and the estimated DLH is $12,250 for the most recent period.The team decided to replace traditional plantwide costing system to activity-based costing system. There are 3 activity cost pools which represent 3 activity areas at the plant. Direct Labor wage rate is $ 30 per hour. Compute total cost per unit (for lambda and gamma) using activity-based approach. (round your numbers).Direct Materials and Direct Labor Variance Analysis Shasta Fixture Company manufactures faucets in a small manufacturing facility. The faucets are made from brass. Manufacturing has 50 employees. Each employee presently provides 32 hours of labor per week. Information about a production week is as follows: Standard wage per hour $12.00 Standard labor time per unit 15 min. Standard number of lbs. of brass 1.5 lbs. Standard price per lb. of brass $11.00 Actual price per lb. of brass $11.25 Actual lbs. of brass used during the week 11,124 lbs. Number of units produced during the week 7,200 Actual wage per hour $12.36 Actual hours for the week (50 employees × 32 hours) 1,600 Required: a. Determine the standard cost per unit for direct materials and direct labor. Round the cost per unit to two decimal places. Direct materials standard cost per unit $fill in the blank 1 Direct labor standard cost per unit $fill in the blank 2 Total standard cost per unit $fill in…I hope the solution is step by step and clearly, and its graph is clear. The subject is operations research
- Please dont answer in image ormat,Do type. Canine Kennels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in 1,000-count boxes) that are manufactured and assembled on three different workstations (W, X, and Y) using a small-batch process (see the figure below). Batch setup times are negligible. The flowchart denotes the path each product follows through the manufacturing process, and each product's price, demand per week, and processing times per unit are indicated as well. Purchased parts and raw materials consumed during production are represented by inverted triangles. CKC can make and sell up to the limit of its demand per week; no penalties are incurred for not being able to meet all the demand. Each workstation is staffed by a worker who is dedicated to work on that workstation alone and is paid $6 per hour. Total labor costs per week are fixed. Variable overhead costs are $3,500/week. The plant operates one 8-hour shift per day, or…The table gives the total cost schedule for oil changes at the local Jiffy Lube. What is Jiffy Lube's total fixed cost?XYZ company provides labor and space for the manufacturing and assembly operations and stocking various inventory items for production such as wire, cables, some electronic components, etc. XYZ company orders a variety of components and raw materials by contract. The company recently hired 100 part-time employees working four to six-hour shifts. Skilled employees must do several raw material conversions for packaging—there are currently three (3) such employees. The plant layout is a typical process layout - machines of similar types are located together. Each machine and employee must be scheduled over the day and the standard time period for planning is one (1) hour. Material handling is mainly done manually, although the company would like to consider conveyors or other automation to aid in automating their processes. XYZ company forecasts planned production for two (2) years on a rolling quarterly basis. Often, the customer changes the forecast, and these changes can occur as…
- Krafts, Inc. uses the decentralized form of organization and considers each of its divisions as an investment center. Division A is currently selling 30,000 units of Part X annually, although it has sufficient production capacity to produce 42,000 parts per year. Variable manufacturing costs amount to P36 per part, while the total fixed costs amount to P180,000. These 30,000 parts are sold to outside market at P76 per part. Division S, also a part of the Krafts, Inc. has indicated that they would like to get from Division A 3,000 parts at a price of P74. Per part because they presently buying the parts from the outside supplier at that price. Assume that Division A could sell the entire 42,000 parts to outside market. What is the effect on the overall operating income of Krafts, Inc. if Division A will be required by the top management to sell 3,000 parts to Division S at a price of: a.) P36 b.)P74Workshape Manufacturing has two classes of distributors: JIT distributors and non-JIT distributors. The JIT distributor places small, frequent orders, and the non-JIT distributor tends to place larger, less frequent orders. Both types of distributors purchase the same product. The customer activities and costs for the previous quarter are as follows: Activity JIT distributors Non-JIT distributors Sales Orders 500 30 Sales Calls 30 30 Service Calls 200 90 Average Order Size 90 1,400 Manufacturing Cost/Unit $50 $50 Customer Costs: Processing Sales Orders $160,000 Selling Goods $155,000 Servicing Goods $195,000 Total $500,000 Calculate the activity rate for selling goods. (Note: Round answer to two decimal places.) a.$2,200.50 per sales call b.$9,400.60 per sales call c.$3,550.66 per sales call d.$2,583.33 per sales call e.$4,800.40 per sales callSome of the successful companies (e.g. Ford, Toyota, Google etc) organize their production and operations functions around ten critical decision areas in operations. These areas are: Goods and services designQuality ManagementProcess and Capacity DesignLocationLayout DesignHuman Resources and Job DesignSupply Chain ManagementInventorySchedulingMaintenanceConsider a business (goods or services business) you are familiar with or search one online. Consider their operations function. Write a paragraph (5-8 sentences) on each of the 10 areas above on their operations function