Using a double-acting cylinder a work piece is removed and tipped onto a conveyor belt. Following are the sequence of operations The operation is to be started using a push button (use the label START PB). Include a stop push button (use the label STOP PB) to stop the process at any time. 1. 2. An acknowledgement signal (S1) is required when the piston is fully extended, to ensure that the work piece has been tipped onto the belt. 3. The extension should be slower than the retraction (use a pilot operated check valve) 4. The return stroke should be automatic. Design the Electro- Hydraulic Circuit with proper labeling. Include the components required a. b. Draw the Displacement -step diagram & Displacement -time diagram ( include Cylinder, START PB, STOP PB, DCV)

Refrigeration and Air Conditioning Technology (MindTap Course List)
8th Edition
ISBN:9781305578296
Author:John Tomczyk, Eugene Silberstein, Bill Whitman, Bill Johnson
Publisher:John Tomczyk, Eugene Silberstein, Bill Whitman, Bill Johnson
Chapter47: High-pressure, Low-pressure, And Absorption Chilled-water Systems
Section: Chapter Questions
Problem 4RQ: Blocked suction cylinder unloading is accomplished by A. keeping the suction valve closed. B....
icon
Related questions
Question
Using a double-acting cylinder a work piece is removed and tipped onto a conveyor belt.
Following are the sequence of operations
1.
The operation is to be started using a push button (use the label START PB). Include
a stop push button (use the label STOP PB) to stop the process at any time.
2.
An acknowledgement signal (S1) is required when the piston is fully extended, to
ensure that the work piece has been tipped onto the belt.
3.
The extension should be slower than the retraction (use a pilot operated check
valve)
4.
The return stroke should be automatic.
a.
Design the Electro- Hydraulic Circuit with proper labeling. Include the components
required
b.
Draw the Displacement -step diagram & Displacement -time diagram ( include
Cylinder, START PB, STOP PB, DCV)
Transcribed Image Text:Using a double-acting cylinder a work piece is removed and tipped onto a conveyor belt. Following are the sequence of operations 1. The operation is to be started using a push button (use the label START PB). Include a stop push button (use the label STOP PB) to stop the process at any time. 2. An acknowledgement signal (S1) is required when the piston is fully extended, to ensure that the work piece has been tipped onto the belt. 3. The extension should be slower than the retraction (use a pilot operated check valve) 4. The return stroke should be automatic. a. Design the Electro- Hydraulic Circuit with proper labeling. Include the components required b. Draw the Displacement -step diagram & Displacement -time diagram ( include Cylinder, START PB, STOP PB, DCV)
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Hand Tools
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Refrigeration and Air Conditioning Technology (Mi…
Refrigeration and Air Conditioning Technology (Mi…
Mechanical Engineering
ISBN:
9781305578296
Author:
John Tomczyk, Eugene Silberstein, Bill Whitman, Bill Johnson
Publisher:
Cengage Learning