Which section and subsection of the regulation outlines the requirements of a tag when de- energizing equipment during lock out tagout procedures? O Sec 190 (3) O Sec 190 (4) O Sec 190 (5) O Sec 190 (6)
Q: The city of Ten Sleep proposes to use Crater Lake for its water supply. The plan is to treat 3,500 m…
A: "Since you have posted a question with multiple sub-parts, we will solve first three sub-parts for…
Q: Q4) A single-stage trickling filter is to be designed to treat primary effluent containing a BOD5…
A:
Q: The following number and type of plumbing fixtures serve a residence: two bathtubs, three water…
A: A plumbing fixture includes the system of pipes that carry water through a building. Kitchen…
Q: 48 Pipe having minimum diameter in plumbing system is (A) Waste pipe (C) Ventilation pipe (B) Soil…
A: Finding out minimum diameter pipe in plumbing system.
Q: Propose an air pollution control device for an automobile factory that emits nitrogen oxides, carbon…
A: In general, every industry must have an air pollution control device. Air pollutants are generated…
Q: ered in the design
A: A VIP is a vented improved pit latrine with a vertical vent pipe that is similar to a single pit…
Q: Describe briefly the nature and operation of rapid gravity filters used in drinking water treatment.…
A: Solution: Rapid gravity filters are mostly used in drinking water treatment as they have proved to…
Q: Compare two pipe, one pipe and single stack drainage systems of house plumbing. State two relative…
A: Solution: As per the question asked
Q: briefly explain why there is flow observed in the sewer when there is no rainfal
A: INTRODUCTION: Sewer system is designed to transport the waste water . runoff water from the…
Q: List the factors which should be considered while selecting the design of a gaseous contaminant…
A: Solution: Factors that we have to consider while selecting the design of a gaseous contaminant…
Q: An employee who works during 8-hour shift in a station is exposed to a noise level of 80 + T + U…
A: Given, A weighted sound level (L) = 80+9+2 = 91 dB(A)
Q: Describe the safety precautions for 1 ton liquid chlorine containers (i) in manufacturing to prevent…
A: (1) Safety precautions for 1 ton liquid chlorine containers in manufacturing to prevent…
Q: Describe the satety precautions for 1 ton liguid chlorine containers (i) in manutacturing to prevent…
A: (1) safety precautions for 1 ton liquid chlorine containers in manufacturing :- Liquid chlorine…
Q: discharge on closed conduit using Venturi meter, will there be an effect of the installation of the…
A: The rate of flow of fluid is measured in a conduit is known as venturimeter. The Bernoulli's theorem…
Q: Quantify volume of air supply if the rate is 0.3 m3/minute-m length of chamber. Assume W: D is…
A: Solution: Given data: QAverage=0.5 m3/secPeak Flow factor=2.7No of tanks=2Volume of grit…
Q: A wastewater treatment plant operator discovered that some equipment in the primary treatment system…
A: To find: Four equipment in primary treatment system of wastewater treatment plant and their…
Q: A ground water supply has been contaminated with ethylbenzene and the remedial action has been…
A: GIVEN- Maximum level of ethyl benzene in the water=1mg/l KLa=0.016 s-1QW=7.13…
Q: Inspection access Access for cleaning Inspection access Wastewater from house Scum Outlet to drain…
A: There Are different Parts of the Septic tank Are given. Our aim is to, Define each parts of the…
Q: The effluent license, pollution license, noise permit, waste license are currently implemented by…
A: The national environment secretariat is a multi stakeholder body which deals in developing a…
Q: Provide the sanitary waste pipe size if the pipe is carrying 400 fixture units and sloped at 1/8”…
A: Here, in the given problem we are only provided with the following data-- 1. SANITARY waste 2.…
Q: Drain, Waste, and Vent System 1. Safety and contamination prevention 2. Testing procedure for DWV…
A: Contamination can be highly dangerous in plumbing system. Although, it can be avoided effectively by…
Q: What are the required gas velocity ranges for best operating conditions for an electrostatic…
A: It is used for controlling air pollution. It removes contaminants like harmful particulate matter…
Q: Describe briefly why flow equalisation is used at wastewater treatment plants. Discuss briefly how…
A: The technique of adjusting hydraulic speed, or rate of flow, via a wastewater treatment process is…
Q: A paper plant is being proposed for a location 1 km upwind from a town. It will emit 40 g/s of…
A: Schematic view of power plant From table 7.9 of Environmental Engineering and science( 3rd edition)…
Q: a) How can you determine chloride content in a waste water sample? Subject: environmental…
A: Chloride, within the style of chloride (Cl–) particle, is one in every of the main inorganic anions…
Q: Q1: Draw the arrow diagram for the following activities and show the critical path: activity…
A: To draw arrow diagram
Q: A 25 ml of sewage water sample was refluxed with 10 ml 0f 0.25 N K2Cr2O7 solution. The untreated…
A: Given data Volume Refluxed volume Concentration Potassium dichromate volume
Q: A groundwater supply has been designated as vulnerable to fecal contamination, and the state has…
A: given disinfection level = 99.99 % ( 4 log) virus pumping rate = 2000 gpm length of pipe = 4200 ft…
Q: Factory of safety of rcc?
A: Safety factor or Factor of safety is very important term in designing and it determines how strong a…
Q: The city of Ten Sleep proposes to use Crater Lake for its water supply. The plan is to treat 3,500 m…
A: Solution: Given Data: The plan is to treat 3,500 m 3 /d by direct filtration.
Q: Calculate the size of the septic tank for night Security Personnel expected per night are three.…
A: Given values: For design of septic tank, No: of persons = 4 persons/ night (expected 3)
Q: Q) What is Optimum dose for a turbid water? Subject: environmental engineering lab
A: Turbid waters, containing mixture particles, area unit usually treated by coagulation-flocculation…
Q: Elucidate the kind of VAV HVAC control system that is most suitable in Architectural constraints of…
A: VAV(variable air volume ) in HVAC control system is used for heating, air conditioning and…
Q: 4. To monitor turbidity and chloride concentrations of incoming flow, an engineer designed a…
A: The given data is shown below: Operating velocity=13 m/s & 8 m/sPeak flow=9.5 MGD
Q: search at least five (5) modern technologies used in the mitigation of liquefaction hazard.…
A: Liquefaction is a procedure which generally naturally happens where the shear strength of soil mass…
Q: Why would one use a "low pass filter" when designing a water filltration system?
A: Low pass filters are used to eliminate noise in a circuit. When a sound is passed through a low pass…
Q: Southside Wastewater Treatment Plant of the City of Tyler How much does the city’s population does…
A: Southside wastewater treatment plant of the city of Tyler (United States), Water plant is provide…
Q: ) What precautions should we follow when conducting experiment in Environmental lab? b) How can…
A:
Q: noise pollution control technologies
A: It is the unwanted sound produced due to any source,which is unpleasant to human ear and may affect…
Q: Q1: Draw the arrow diagram for the following activities and show the critical path: activity…
A:
Q: Determine the number of completely mixed chlorine contact chambers each having a detention time of…
A: As per guidelines we need to answer only first question so please repost rest questions separately.
Q: A chlorine contact chamber (w = 20 ft, d = 9 ft), flowing at 8.6 MGD, is required to meet a CT = 52…
A: Given Data- A chlorine chamber- width (w) = 20 ft depth (d) = 9 ft Flow Rate (Q) = 8.6 MGD CT = 52…
Q: A wastewater treatment lagoon is being designed to accommodate an input flow of 0.1m^3/s containing…
A: Given data: The input flowrate is 0.1 m3/s. The concentration of input effluent is 25.0 mg/L. The…
Q: What are criteria and non-criteria pollutants? What do you understand from a term Micro Indoor Air…
A:
Q: find the discharge
A: FLUID MECHANICS
Q: --------------------------- regulates drinking water collection, treatment and distribution, and…
A: EPA regulates drinking water collection. EPA is called as Environmental Protection Agency . EPA…
Q: in-stream chlorination point to treat a contaminated river is best represented by which system:…
A: Continuously Stirred tank reactor continuously stirred tank reactor is the correct answer for stream…
Q: After using a fire extinguisher what must occur O Sec 54 (1) O Sec 54 (2) O Sec 55 O Sec 56
A: section 56 must occur after using the fire extinguisher
Step by step
Solved in 2 steps
- Describe the satety precautions for 1 ton liguid chlorine containers (i) in manutacturing to prevent explosions; and (ii) in handling for use at the water treatment plant.CASE STUDY You are an environmental engineer for one of the many local plants. That plant discharges effluentsinto a lake in a flourishing tourist area. Although all the plants are marginally profitable, they competefor the same customers. Your responsibilities are to monitor the water and air discharges at your plantand the periodic reporting to Dept. of Anti-pollution. You have just prepared a report that indicates thatthe level of pollution in the Plant’s water discharges slightly exceed the legal limits. Your supervisorsays you should regard the excess as a mere ‘technicality’, and he asks you to ‘adjust’ the data so thatthe data appears to be in compliance. He says that slight excess is not going to endanger human or fishlife any more than if the plant were actually in compliance. However, he says, solving the problemwould require a very heavy investment. He explains, “We cannot afford new equipment. It might costeven a few jobs. It will put us behind our competitors. Besides, he…Question regarding Environment science & engineering There are faulty parts found in the primary treatment section of a wastewater treatment plant.Identify 2 possibly faulty equipment, state the effect of having the faulty equipment ? Give me right answer.. thank you
- Which clause refer to notification of change of respource or representative or personnel of contractor under the Fidic (red book) form?Site Civil Work To Do's Excavating the trench ( as per requirements ) Placing the bedding material Placing Pipe in trench • Backfilling and compacting trenchA forty-foot wooden hull fishing vessel sprang an unexpected leak a few days after leaving port. As more water entered the vessel, the engine was flooded, and the vessel eventually sank. Inspection of the vessel during the leak showed that the water was coming from underneath a refrigerated space in the front part of the vessel. In view of its construction style, the bilge underneath the vessel was inaccessible. The underwriter refused to indemnify the insured for the loss of the vessel by claiming that the latter had not exercised diligence to make the vessel seaworthy prior to the developing of the leak. The owner/master of the ship had no knowledge of the leak before the ship started its voyage. Do you think the loss is covered under the policy?
- True or False: The Williams-Steiger Occupational Safety and Health Act of 1970 (“OSHA”) [Title 29 USC 451et seq.] only deals with the operation of equipment in support of construction activities.A company designs, builds, and sells prefabricated commercial buildings. During a recent heavy snowstorm, the roof of one of the buildings (designed and constructed by this company) failed, leading to significant damage to the building and its contents. Which of the following reasons is the most likely reason the building owner may not recover damages from the company? O A. Statute of limitations. O B. The contents of the building are not covered by insurance policies. O C. None of the above. The safety of the building and its contents are the legal responsibility of the company that designed the roof. O D. Insurance policy has an “Act of God" clause.Lyanna, a former employee at a power plant, was injured on the jobsite last year: Under the OSH Act, what records does she have a protected right to request? O Medical records only O OSHA form 300 and her medical and exposure records O OSHA form 300 onlv O A summary of injuries at the jobsite Extension cords in walking paths, improper storage of chemicals, and improper processes are all examples of chance occurrences O weather-related accidents O unsafe conditions O unsafe behavior by employees If the EEC has completed an investigation and determined that discrimination has taken place, it may seek: O to notify the employee of the results. O to reach a voluntary settlement with the employer O to contact the employer to obtain a lawyer. O to finish in 10 months or less. This is the process by which parties arrive at a contract: 1 unionization 2 preparation 3 dispute moderation 4 collective bargaining
- Case4: A consulting engineering company was awarded the contract for designing, preparing the specifications, and providing "field inspection services" (monitoring the construction) of a sewage treatment plant being built for a small municipality. The construction proceeded routinely to completion. The consulting company employed Engineer A, an environmental engineer experienced in wastewater treatment, to assist in the field inspection. During the final commissioning of the plant, Engineer A observed that the biochemical oxygen demand (BOD) of the effluent was frequently above the acceptable limit. Engineer A contacted the design office at his engineering company, and after reviewing the case with an environmental consultant, he soon realized that the plant had been designed for average flows, but several food-processing industries in the municipality occasionally fed "slugs" of raw sewage to the plant. The biochemical oxygen demand would increase rapidly when one of these slugs…5 - E2. Determine if your state has any of the following:(a) fire code(b) ventilation code(c) plumbing code(d) construction safety regulations(e) regulations for asbestos removal projects(f) regulations for cleanup of contaminated soilQuestion #14, Case 4: HVAC units The general contractor on this project chose not to purchase the heating, ventilation, and air conditioning (HVAC) equipment from the mechanical subcontractor, but rather they purchased it directly from the manufacturer. Why would a GC do this? The shop drawings were submitted and were per specifications. The submittal was approved and returned on time. The equipment was delivered on time, but because the HVAC subcontractor had not yet mobilized on-site, the GC unloaded the mechanical units from the truck and hoisted them to location with the GC's own crane. The subcontractor connected the equipment after placement. The system was completed on schedule, but on a very hot design day, during HVAC balancing, it is discovered that the units are not keeping up with air conditioning requirements. The labels are checked, and it is discovered that they are undersized by one-third from the specified units. The approved submittal does not match up with what has…