While constructing a building, an engineer need to fix two steel beams together using a bracket as shown in Figure 1. Using absolute coordinate system, construct a G-code program for drilling hole number 2 only. To remove the metal chips the hole should be done in two equal steps. During the drilling, coolant should be on after spindle starts and stop before spindle stops. The spindle speed set to 1750 RPM. Drilling bit in rack number 2 and it should be 2 mm over the work piece. Drilling feed rate is 25 mm/min. Explain each code used in the program in a column. 57.5- 12.5 Hole (4) Hole (3) 30 10 Hole (1) Hole (2) X0 YO ZO All dimensions shown are in mm

Elements Of Electromagnetics
7th Edition
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Sadiku, Matthew N. O.
ChapterMA: Math Assessment
Section: Chapter Questions
Problem 1.1MA
icon
Related questions
Question
100%
While constructing a building, an engineer need to fix two steel beams together using a bracket as shown in
Figure 1. Using absolute coordinate system, construct a G-code program for drilling hole number 2 only. To
remove the metal chips the hole should be done in two equal steps. During the drilling, coolant should be on
after spindle starts and stop before spindle stops. The spindle speed set to 1750 RPM. Drilling bit in rack
number 2 and it should be 2 mm over the work piece. Drilling feed rate is 25 mm/min.
Explain each code used in the program in a column.
57.5-
12.5
Hole (4)
Hole (3)
30
10
Hole (2)
Hole (1)
X0 YO ZO
10
15
All dimensions shown are in mm
Figure 1
Transcribed Image Text:While constructing a building, an engineer need to fix two steel beams together using a bracket as shown in Figure 1. Using absolute coordinate system, construct a G-code program for drilling hole number 2 only. To remove the metal chips the hole should be done in two equal steps. During the drilling, coolant should be on after spindle starts and stop before spindle stops. The spindle speed set to 1750 RPM. Drilling bit in rack number 2 and it should be 2 mm over the work piece. Drilling feed rate is 25 mm/min. Explain each code used in the program in a column. 57.5- 12.5 Hole (4) Hole (3) 30 10 Hole (2) Hole (1) X0 YO ZO 10 15 All dimensions shown are in mm Figure 1
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Automation of Manufacturing Processes
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Elements Of Electromagnetics
Elements Of Electromagnetics
Mechanical Engineering
ISBN:
9780190698614
Author:
Sadiku, Matthew N. O.
Publisher:
Oxford University Press
Mechanics of Materials (10th Edition)
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:
9780134319650
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Thermodynamics: An Engineering Approach
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:
9781259822674
Author:
Yunus A. Cengel Dr., Michael A. Boles
Publisher:
McGraw-Hill Education
Control Systems Engineering
Control Systems Engineering
Mechanical Engineering
ISBN:
9781118170519
Author:
Norman S. Nise
Publisher:
WILEY
Mechanics of Materials (MindTap Course List)
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:
9781337093347
Author:
Barry J. Goodno, James M. Gere
Publisher:
Cengage Learning
Engineering Mechanics: Statics
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:
9781118807330
Author:
James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:
WILEY