While setting the cycle time as the maximum possible will result in more out Oa. FALSE O b. TRUE
Q: Time study mainly addresses:a) Timing all workers’ performances for setting standardtimesb)…
A: Time study helps to determine and set standard times through all the mentioned options above.
Q: Describe the impact of defects on organizational success from an internal and external (e.g.,…
A: The high level process phases in a typical defect management process are as follows. Each of these…
Q: Loans are evaluated in a two-step process with two resources. The processing times for the resources…
A: Given data is : Resource Time/unit 1 17 2 62 Total 79 Number of units n = 2 Bottleneck…
Q: Kanban is the Japanese word for:a) car.b) pull.c) card.d) continuous improvement.e) level schedule.
A: c) card.
Q: Answer the following true or false.a. The lead time is always less than the cycle time
A: The answer is False.
Q: The maximum cycle time is the sum of all task times when the tasks are running in series. a. TRUE b…
A: “Cycle time” is a vague term that may apply to a wide range of things depending on the context. The…
Q: If the batch size is increased, inventory increases, which implies that flow units arelikely to…
A: Inventory is an aggregate of material which are in the form of finished goods for selling purpose,…
Q: Note- need a correct option without explanation as fast as possible!! The three-stage operations…
A: The correct option is (A)
Q: 18Every company has a Bottleneck True False 19Capacity of each sequence in a process is independent…
A: The detailed solution is given in Step ahead.
Q: A work system has five stages with processing times of 58, 247, 91, 262, and 175 mins/unit. A…
A: Production is the process of developing finished products using raw materials and resources for the…
Q: An order which is being processed on the shop floor but is not yet finished is called open order.…
A: Open order refers to an unfilled or working order which is not yet been executed and is in the…
Q: A system has two processes and three identical resources. Each process needs a maximum of two…
A: In the above question it is given that a three identical resources system has two processes.…
Q: The students information like Name, GPA, Major subjects etc., about a particular is stored in the…
A: A) Student Record:- An understudy/student record is one that: Is kept up by the University or…
Q: The slowest point in a process is a ________.
A: The slowest point in a process is a ________
Q: A bottleneck is Multiple Choice a resource that has the smallest capacity. a resource that can…
A: Basically every process more or less faces a bottleneck, so does production process face it.
Q: Line processes generally have lower volumes as compared to job processes.
A: The answer for the Question is False. Here's How
Q: If a flow unit type j does not consume any time at a resource i, the corresponding cell inthe…
A: The corresponding cell of the type j cell in the workload matrix, which is referred as WL (i, j)…
Q: What is the capacity of the process? Answer should include 2 digits after the decimal
A: Given The above process consists of for tasks which are Task 1,Task 2, Task 3, Task 4. Each of these…
Q: Claims received by Healthwise Insurance Company are en-tered into the database at one station, and…
A: Solution Applying Johnsons rule, we get - Johnson's rule is: Pick the one with the shortest…
Q: It is a stage of the process that appears inefficient and causes the customer to wait longer. a.…
A: A process is flow of steps which contains multiple stages of activities. Here, we can identify the…
Q: A resource that limits the output of a process by limiting capacity is called this.
A: A resource that limits the output of a process by limiting capacity is called bottlenecks.
Q: A Printed Circuit Board (PCB) machine installs integrated circuits onto a board. Before starting to…
A: Given: Setup time = 16min Processing time = 0.19min/board
Q: Eliminating the queue of work dramatically quickens the time it takes a part to flow through the…
A: An effective system focus on balancing the load across the process and managing the queues rather…
Q: 20 ______ are high-volume product processes that typically produce standardized products and require…
A: Note: We'll answer the first question since the exact one wasn't specified. Please submit a new…
Q: Increasing the batch size on a resource with setups always increases the capacity of theresource.…
A: The business operations run on various input resources to reach a certain level of output. It is the…
Q: Which of the following captures the idea of Andon?(a) Examples of this include workers having to…
A: The correct answer is (b)
Q: Which of the following is likely to increase the utilization of a resource with a setup time?a.…
A: Which of the following is likely to increase the utilization of a resource with a setup time?…
Q: The lead time gap refers to how long it takes something to arrive. O True O False
A: Lead time is the amount of time that passes from the start of a process until its last stage of the…
Q: Which of the following is a benefit of overbooking a resource?a. It helps to reduce the average…
A: Resource management is described as the process of managing, allocating and acquiring resources.…
Q: Bounded rationality is a limited capacity for processing information. Select one: a. False. b. True.
A: Bounded Rationality is the level of rationality that has been limited to an individual when they are…
Q: true or false 3 The same person requires different combinations of products and service depending…
A: There are different products and services that are required in society. The products and services…
Q: An engineering i rm retains a technical specialist to assist four design engineers workingon a…
A: Given information: Service rate of a technical specialist (μ) = 8 assistance per day Arrival rate (…
Q: On average producing a t-shirt requires 3 meters of textile. If company “A" uses only 2 meters to…
A: The organizations are producing the products to earn money by selling the produced products. The…
Q: Which of the following is true of just-in-time processing? a.In just-in-time processing,…
A: This question is related to the topic -Lean Manufacturing and Production Management, This topic…
Q: hree jobs are in the queue. The number of tickets each has and the number of seconds of processing…
A:
Q: The information turnaround time is driven primarily by:a. the number of workers.b. the IT system.c.…
A: The correct option is option b)—the IT system. Turnaround time is the time taken by a process from…
Q: It takes Carissa 45 minutes to finish a 60-ietm test in math. At this rate, how many minutes will it…
A: Arithmetic operations include addition, subtraction, multiplication, and decision as well as percent…
Q: The self-directed work team is composed of individuals who are assigned a cluster of tasks, duties…
A: A team is a group of people who work collectively to achieve a common goal. A team has defined roles…
Q: An event when denotes a particular task or activity is frequently shown as a round circle and called…
A: A network diagram in project management is described as a means of visualization of the logical and…
Q: The earliest-due-date rule always minimizes the maximum tardiness across jobs. True orfalse?a.…
A: The right option is A. True, the earliest-due-date rule always minimizes the maximum tardiness…
Q: To keep track of the queue and meet deadlines, two things are required: meticulous scheduling and…
A: Queue management techniques are used to handle queues in a system.
Q: 1. When is the best time to do the cycle count? and give examples of cycle count methodologies.
A: The cycle count method provides the correct amount of stock available in the warehouse. This method…
Q: The implied utilization can never be bigger than 100 percent. True or false?a. Trueb. False
A: The implied utilization can never be bigger than 100 percent. This statement is true. The correct…
Q: So one question for situation question. Do for problem question…
A: In the SPIN sales process, Situation questions are asked first in order to gain an understanding of…
Q: For a particular process, suppose the bottleneck cycle time is 40, and the raw processing time is…
A: The Process Cycle Efficiency, in some cases alluded to as the Value Added Ratio, is an estimation of…
Step by step
Solved in 2 steps
- What is the total idle time of the process assuming unlimited demand?Committed resources are ............................... A. purchased precisely at the time the resource is needed and have no unused capacity. B. hard to purchase. C. none of the above D. Non of the aboveA manufacturer's average WIP inventory for Part #762 is 882 parts. The workstation produces parts at the rate of 275 parts per day. Use the Excel template Little's Law to find the average time a part spends in this workstation. - Slugger, Inc. assembles Baseball Bats with aluminum handles in an assembly line using four workstations. Management wants an output rate of 550 bats per day using a 11.5-hour workday. What is the cycle time?
- The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each toothbrush, there is a sequence of assembly steps performed by five workers. Each worker does two tasks. Inventory buffers are allowed between workers. (a) What is the capacity and cycle time of this process? (b) What is the idle time of each worker if the process operates at full capacity? (c) Suppose two workers could be hired, F and G, and they take the same time to complete tasks as the current five workers. F and G can be assigned to work on the same pair of tasks as one of the current workers. For example, F could be assigned tasks T1 and T2 (just like worker A) while G is assigned T5 and T6 (just like worker C). They cannot be assigned tasks that are currently assigned to two workers. For example, F cannot be assigned to tasks T2 and T3 (because they are currently being done by workers A and B). What is the capacity of this process with workers F and G included?The current level of resources is or is not Sufficient to satisfy a demand of 8 orders per hour because the process capacity is greater or less than demand.What is OEE and also calculate the OEE from the given data in below table Items Data Shift Length 8 Hours Breaks (2) 15 minute and (1) 30 minute Downtime 47 minutes ideal Cycle Time 1.0 seconds Total Count 19,271 widgets Reject Count 423 widgets
- If a production process has a bottleneck cycle time of 48 minutes/item, what is the maximum daily capacity of the system, assuming the company operates two, 8-hour shifts? Enter an integer value.Mack’s guitar fabrication shop produces low cost, highly durable guitars for beginners. Typically, out of the 100 guitars that begin production each month, only 80 percent are considered good enough to sell. The other 20 percent are scrapped due to quality problems that are identified after they have completed the production process. Each guitar sells for $300. Because some of the production process is automated, each guitar only requires 10 labor hours. Labor is paid at $10/hour, materials cost is $40/guitar, and overhead is $2,000. a) Calculate the labor and multifactor productivities. b) After some study, the operations manager recommends 3 options to improve the company’s multifactor productivity: (1) increase the sales price by 10 percent, (2) improve quality so that only 10 percent are defective, or (3) reduce labor, material, and overhead costs by 10 percent. Which option has the greatest impact on the multifactor productivity measure?In order to produce 1000 units of X in a week units X is scheduled weekly for Operation B (due to 5% scrap ratio) units X is scheduled weekly for Operation A (due to 2% scrap ratio) Based on your answer in part a, find the number of machines required to produce 1000 units of X per week. The total time required to perform Operation B = minutes per week The total time required to perform Operation A = minutes per week H= Available Time in a week = minutes /week Thus FA = . FB = . Since both of the operations A and B are performed on the same machine machines are required
- Suppose the daytime processing load consists of 70% CPU activity and 30% disk activity. Your customers are complaining that the system is slow. After doing some research, you have learned that you can upgrade your disks to 2.5 times as fast as they are currently for $5,000 or you can upgrade your CPU to make it 1.5 as fast for $8000. a) Which would you choose to yield the best performance improvement for the least amount of money? b) Which option would you choose if you don't care about the money, but want a faster system?What is OEE and also calculate the OEE from the given data in below table. Item Data Shift Length 8 hours Breaks (2) 15 minute and (1) 30 minute Downtime 47 minutes Ideal Cycle Time 1.0 seconds Total Count 19,271 widgets Reject Count 423 widgetsKevins Shampoo company makes four kinds of shampoo: rose, lemon, ginger, and tea tree. The demand for the four scents are 191, 164, 92 and 74 kg per hour respectively. The production process can produce any shampoo at the rate of 581 kg per hour, but 2 hours are needed to switch between scents. The process doesn’t produce any shampoo during switchover times. Kevin wants to choose a production schedule that (i) cycles repeatedly through the four scents, (ii) meets the required demand and (iii) minimizes the amount of inventory held. (please round your answers to 2 decimal places) 1.How many kg of rose shampoo should Kevin produce before switching over to another scent? 2.Kevin needs to buy coconut oil to make her shampoo. She needs 1401 kg of coconut oil per day on average. The supplier charges a EUR 77 delivery fee per order (which is independent of the order size) and EUR 5.13 per kg. Kevin annual holding cost is 30%. Assume 52 weeks per year and 5 days per week. If Kevin wants to…