Colorado River Essay

Sort By:
Page 4 of 50 - About 500 essays
  • Good Essays

    Hoover Dam Construction

    • 1455 Words
    • 6 Pages

    and allowed thousands of men to support their family and rebuild the economy. Additionally, the Hoover Dam allowed the United States to better their relationship with Mexico. Mexico gained access to to 1.5 million acre-feet of water from the Colorado River annually. This water can be used for agriculture, which not only would benefit the Mexican economy, but the American economy as well. The Hoover Dam has had a substantial impact on the country as a

    • 1455 Words
    • 6 Pages
    Good Essays
  • Decent Essays

    above to the piercing blue sky. As I regain my footing on the wobbling yellow board, I can feel the sun’s rays dance over my skin and dry the water that cascades down my soaking frame. Leaning back and plunging the paddle within the depths of the Colorado River, my sinewy arms mechanically take shape, and thrust me forward. Casting my gaze up towards the serene sky, the circling of a hawk looms overhead, losing itself in spite of the sun. Eventually, the shadow of the free-spirited bird dances atop the

    • 732 Words
    • 3 Pages
    Decent Essays
  • Satisfactory Essays

    To analyze the need for a pulse flow in the lower Colorado River, we assessed the historical streamflow data of the Colorado River. We first created a time series, Figure 3, of the streamflow of the Colorado River below the Yuma Main Canal in Arizona, which is a few miles upstream from where the pulse flow was added at the Morelos Dam. Each data point represents the monthly mean streamflow rate (discharge rate) in cubic feet per second, from 1963 to 2016, as reported by the United States Geological

    • 304 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Hoover Dam Essay

    • 2008 Words
    • 8 Pages

    an irrigation system that would benefit these desert surroundings with flooding protection and something to act as a utility to help provide power to the growing cities nearby. The best answer to this was the Hoover Dam, which is located on the Colorado River on the boarder of Nevada and Arizona. In only five years, the completion of the Hoover Dam was constructed from 1931 to 1936. The costly construction of the Hoover Dam was a successful project that was completed during the Great Depression which

    • 2008 Words
    • 8 Pages
    Better Essays
  • Decent Essays

    of the supply is further squeezed, these tensions are likely to result in conflict. Conflict can also occur within a country, for example the states situated within the Colorado river basin have been constantly squabbling over who owns the water supply and who should be allocated the most water. In the 1920s the ‘Law of the River’ established the division of water amongst the upper basin states, it also defined their responsibility to supply water to the lower basin states. This division had been

    • 907 Words
    • 4 Pages
    Decent Essays
  • Decent Essays

    Yuma Project

    • 1485 Words
    • 6 Pages

    growth, and to do so channels are usually used. The yuma project was designed to irrigate Yuma County Arizona And part of California and thus to exploit to the maximum the agricultural activities of the place using as main source of water the Colorado River. The project began in the year of 1903 and with the a series of geographic, environmental and logistical challenges that the workers had to overcome to complete this project which would become the main driver of development in the city.

    • 1485 Words
    • 6 Pages
    Decent Essays
  • Good Essays

    Completed in 1936, the primary purpose of the Hoover Dam is to control the waters of the Colorado River during flood seasons and to eliminate the annual threat of flood damage in order to protect the fertile regions below. The dam also provides a stable supply of irrigation water and various domestic use supplies for southern California and southwest and central Arizona by storing the annual Colorado River runoff. Finally, the Hoover Dam produces hydroelectric power at an average generation rate

    • 1819 Words
    • 8 Pages
    Good Essays
  • Decent Essays

    Camping in Alaska, Arizona, and Colorado The wilderness is vast, unforgiving, and beauteous; those who visit it unprepared find thorns instead of roses, but even as tough as a trip into the wild is, the pros can be worth the cons. Many venture into camping with no wary thoughts about the dangers it brings; the wildlife, environment, weather, and location can instantaneously alter your seemingly perfect trip. Surprisingly, these problems can be avoided, but only through careful planning. Planning

    • 957 Words
    • 4 Pages
    Decent Essays
  • Better Essays

    Hoover Dam Essay

    • 1587 Words
    • 7 Pages

    prepared and have materials brought in (Hoover Dam - FAQs).      First, a dam can¡¦t be built with the river still flowing; diversion tunnels were created that were four-thousand feet long (Wassner 98) and fifty-six feet in diameter (Gorum). These alone took two years to build and had to be done during the winter due to the force of the rapids of the Colorado during warm weather. After the river was diverted, it left behind stinking muck. This consisted of two million cubic yards of mud and silt.

    • 1587 Words
    • 7 Pages
    Better Essays
  • Good Essays

    would not go dry and die. A lot of this project was levees, canals, and drains moving the water to places it needed to be such as dry crop fields and farms and such or just places that needed water in general. 20 years after the water from the colorado river was applied to land in Wellton, Yuma, Blythe areas the result of the movement was that a lot of

    • 1624 Words
    • 7 Pages
    Good Essays