1. Cotabato Light and Power Company supplies two-single phase transformers at San Pablo Area banked in open delta. If each transformer is rated 75-kVA capacity, what is the maximum 3-phase load in kilowatts that the bank can carry without suffering overload considering that the load has a lagging power factor of 0.80.

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter3: Power Transformers
Section: Chapter Questions
Problem 3.31MCQ
icon
Related questions
Question
1. Cotabato Light and Power Company supplies two-single
phase transformers at San Pablo Area banked in open delta.
If each transformer is rated 75-kVA capacity, what is the
maximum 3-phase load in kilowatts that the bank can carry
without suffering overload considering that the load has a
lagging power factor of 0.80.
Transcribed Image Text:1. Cotabato Light and Power Company supplies two-single phase transformers at San Pablo Area banked in open delta. If each transformer is rated 75-kVA capacity, what is the maximum 3-phase load in kilowatts that the bank can carry without suffering overload considering that the load has a lagging power factor of 0.80.
2. Three transformers delivers a 1.5-MVA 0.866 power
factor load, connected Y on the primary side and A on
the secondary side, step the voltage up from 600 to
17,320 volts. Calculate:
a. the ratio of transformation of each transformer
b. the kilovolt-ampere and kilowatt load on each
transformer
C. the current delivered to the load
d. the current in the primary line wires
e. the current in each secondary transformer
windings
f the current in each primary transformer winding
Transcribed Image Text:2. Three transformers delivers a 1.5-MVA 0.866 power factor load, connected Y on the primary side and A on the secondary side, step the voltage up from 600 to 17,320 volts. Calculate: a. the ratio of transformation of each transformer b. the kilovolt-ampere and kilowatt load on each transformer C. the current delivered to the load d. the current in the primary line wires e. the current in each secondary transformer windings f the current in each primary transformer winding
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning
Electricity for Refrigeration, Heating, and Air C…
Electricity for Refrigeration, Heating, and Air C…
Mechanical Engineering
ISBN:
9781337399128
Author:
Russell E. Smith
Publisher:
Cengage Learning