A comapny producing electronic equipment purchase batterys at $ 31.5 per unit. The annual requirement of batterys is 5501 units. The ordering cost is $ 203 per order, holding cost is $ 5 per unit, lead time is 6 days and the per day demand was at 21 units . Calculate the EOQ and the reorder point from the given details.
Q: 1. The New Orleans plant produces wooden packing boxes to be used in the local seafood industry. Cur...
A: Productivity is the capability of the worker to manufacture the products and services effectively an...
Q: ALB. Fach toy 4 type A requires Pro dutes two A manofacturr 4 ALB. Fach toy d type A requires s enoy...
A:
Q: Name live priority sequencing rules. Explain how each worksto assign jobs.
A: Priority sequence rules specify the order in which tasks should be completed. These rules make assum...
Q: Bluehilton furniture produces 54 tables a day, labour costs to around 745 Rupees ,energy cost is 499...
A:
Q: With the use of a diagram, show (illustrate) the typical levels of project staffing related to each ...
A: A project begins with an aim, and in order to achieve that purpose, the organization determines the ...
Q: a Cybersecurity expert has determined ICS vulnerability would destroy 50 percent of the process asse...
A: Cost of vulnerability = 50% of process Asset = 50100×10,000,000=$5,000,000 Frequency of Vulnerabilit...
Q: Earlier this month, your company, a running equipment designer and manufacturer called Runners Parad...
A: Human Resource Tactical Planning is the main element in attaining organizational goals & overall...
Q: This is the difference between the behavior of the real - world situation and the captured within th...
A: Situation mindfulness is the view of the components in the climate within a volume of reality, the a...
Q: Given this information: Expected demand during lead time = 345 units Standard deviation of lead time...
A: Reorder point refers to the level of inventory on hand that triggers the company to order more inven...
Q: Which of these was a unique element that allowed Tinder to grow so fast Select one: a. Removal of th...
A: The detailed solution is given in Step 2.
Q: What is computer integrated manufacturing discouraging about
A: Introduction- Manufacturing can be quicker and less mistake inclined by the reconciliation of comput...
Q: . Explain the importance of resource planning in project scheduling.
A: A resource plan is designed during the planning phase of any project. It is made by the person in c...
Q: the inventory is 20 and the mps is 200. complete the master schedule
A: Note: - MPS value is taken 200 here instead of 100 because it is specified. Given data is
Q: Ram Roy's firm has developed the following supply, demand, cost, and inventory data. ...
A: A Small Introduction about Inventory Management Inventory management alludes to the method involv...
Q: As manager of the St. Cloud Theatre Company, you have decided that concession sales will support the...
A: Given-
Q: Lenovo uses the ZX-81 chip in some of its laptop computers. The prices for the chip during the last ...
A: Calculation of 2 month moving averages of the data (1)month (2)Sales (3)2 month moving total...
Q: An expensive piece of equipment is used in the masking operation for semiconductor manufacture.A cap...
A: given,
Q: calculate the productivity of the firm that produces beef products as it produces 6000 units in almo...
A: Given: Quantity produced = 6000 units time taken = 567 hours Unit price = $ 41 Labour rate = $ 36 Ma...
Q: In general life insurance company the, the registration process mean is 60 minutes , and the standar...
A: Given: mean = 60 minutes standard deviation = 0.64 minutes Upper specification = 62 minutes lower sp...
Q: a) Calculate the expected time and variance for each activity. b) What is the expected completion ti...
A: A Small Introduction about Linear Programming A Linear Programming (LP) is a sort of numerical im...
Q: Brenda Last, an undergraduate business major at State University, is attempting to determine her cou...
A: Binary integer linear programming refers to the linear programming technique in which the objective ...
Q: timization algorithms help to e
A: What Is a Labor Optimization? Computer software has made it possible for huge enterprises with a lar...
Q: Should Phil and Linda ignore the old-timers’ protests and write the job descriptions as they see fit...
A: A Small Introduction about Management The board is the achievement of hierarchical objectives in ...
Q: Discuss the importance and usage of Cost Estimating. - Where can this be used - When can this be use...
A: COST ESTIMATION: Cost estimation can be defined as the process of forecasting the financial and the ...
Q: 1. Food trucks have become a common sight on American campuses. They serve scores of hungry stud...
A: 3-period moving average forecast =At-1+At-2+At-33 Exponential smoothing forecast, Ft+1 = αAt+(1-α)Ft...
Q: Explain the importance of resource allocation in project scheduling.
A: Resource allocation means managing and arranging the resources of the organsiation is such a manner ...
Q: How would developing a WBS help to alleviate problems during the initial meeting? How can the WBS be...
A: Work breakdown structure can be defined as an organized methodology that is used to split an overall...
Q: 3.22 Four Squares Productions, a firm hired to coordinate the release of the movie Pirates of the Ca...
A: Given data is
Q: a. What is the EOQ? (Round your answer to a whole number.) EOQ b. How many times per year does the s...
A: Since you have posted a question with multiple sub-parts, we will solve the first three subparts for...
Q: 3) H sing Graop hiral Solve Meldied the follewing Lpp Z = 100", + h0x, lo n, + 41, < 2000 3x, + 2%, ...
A: Note: - Both the problem given by you are the same. They both have the same values and maximization ...
Q: A company that makes shopping carts for supermarkets and other stores recently purchased some new eq...
A: Given data Current system Number of workers = 7 Output of the workers = 90 units or 90 carts per ...
Q: Discuss the problems with excessive workload amonst healthcare staff and some potential solutions. S...
A: Excessive workload among healthcare workers is a problem. Hospital nurses are overworked, which is ...
Q: 1. Place the phases of the Business Cycle in order. The phases (in no particular order here) are: Re...
A: Note: “Since you have asked multiple questions, we will solve the first question for you. If you wan...
Q: Benny the Barber owns a one-chair shop. At barber college, they told Benny that his customers would ...
A: Since you have posted a question with multiple sub-parts, we will solve the first three subparts for...
Q: Sam Hutchins is planning to operate a specialty bagel sandwich kiosk but is undecided about whether ...
A: Total Cost :- Total price is the full expenditure incurred to provide a few sort of output. From an ...
Q: use trend projection to forcast demand for haircuts and hairstyling for 2022 for cutey barber salon...
A: Given Information - Year demand for haircuts and hairstyling 2017 11,500 2018 ...
Q: 5. The manager of Asombrado Bounty Office, Charles Badillo, estimates his employees are idle 25% of ...
A: Note: - Since the exact question that has to be answered is not specified we will answer only the fi...
Q: Discuss the term supply chain restructuring and with aid of graph discuss various dimensions of supp...
A: A supply chain is a network between a company and its supplier. This is to create and distribute a p...
Q: For each project phase. identify and describe at least one (1) major deliverable (output) of the pha...
A: There are 5 basic phases in the project management process:- Project InitiationProject PlanningProje...
Q: describing a Limited Liability Company (LLC) business that would created. Indicate a specific provis...
A: A limited liability company (LLC) is a business entity for private companies in the United States, w...
Q: A process that produces computer chips has a mean of .04 defective chips and a standard deviation of...
A: Given data Standard deviation = .003 units or chips Mean = 0.04 units or chips Allowable defective...
Q: Module: Principles of Purchasing & Supplies. Qn: Explain how the Push and Pull factor effect can af...
A: The goal of a push and pull distribution strategy is to guide your promotional path to market. Perha...
Q: How can we find the Leaving Basic Variable?
A: the leaving basic variable can be found out when it has the smallest coefficient in the key row. the...
Q: e. Compute the percent idle time and percent efficiency for the assignment in part d. Note: if the c...
A:
Q: A manager faces peak (weekly) demand for one of her operations, but is not sure how long the peak wi...
A:
Q: which research design is most likely to have problems with external validity a)a laboratory experime...
A: which kind of Research design is most likely to have problems with external validity?
Q: MRP II stands for:a) material resource planning.b) management requirements planning.c) management re...
A: Production is the process of converting the raw materials and resources into finished products for t...
Q: Multiple causes of problem Consensus among stakeholders and prioritizes improvement strategies with ...
A: NOTE: WE ARE ALLOWED TO DO THE FIRST THREE PARTS ONLY. PLEASE POST THE REST PARTS AGAIN TO GET AN AN...
Q: 10. Tools that support high reliability organiZing include (select all that apply): CUSP Event repor...
A: Applying high-reliability ideas in an organization doesn't need an enormous mission or a significant...
Q: 7.12. Design a layout on a 2 × 3 grid that satisfies these preferences. Department A A Department B ...
A: The detailed solution is given in Step 2.
A comapny producing electronic equipment purchase batterys at $ 31.5 per unit. The annual requirement of batterys is 5501 units. The ordering cost is $ 203 per order, holding cost is $ 5 per unit, lead time is 6 days and the per day demand was at 21 units . Calculate the EOQ and the reorder point from the given details.
Step by step
Solved in 2 steps
- Joe Henry's machine shop uses 2,460 brackets during the course of a year. These brackets are purchased from a supplier 90 miles away. The following information is known about the brackets: Annual demand 2,460 Holding cost per bracket per year $1.55 Order cost per order $19.50 Lead time 2 days Working days per year 250 Part 2 a) What is the EOQ? enter your response here units (round your response to two decimal places). Part 3 b) What is the average inventory if the EOQ is used? enter your response here units (round your response to two decimal places). What would be the annual inventory holding cost? $enter your response here (round your response to two decimal places). Part 4 c) Given the EOQ, how many orders will be made annually? enter your response here orders (round your response to two decimal places). What would be the annual order cost? $enter your response here (round…Demand for a popular athletic shoe is nearly constant at 1000 pairs per year for a regional division of a national retailer (open every day, working days=365). The cost per pair is $54. It costs $72 to place an order, and annual holding costs are charged at 22% of the cost per unit. The lead time is two weeks (14 days). Show steps to find: a.What is the EOQ? b.What is the reorder point? c.How many orders per year?d.What is the total annual cost?The Star Equipment Company purchases 54,000 bearing assemblies each year at a unit cost of $40.00. The holding cost is $9.00 per unit per year, and the ordering cost is $20.00. What is the economic order quantity? How many orders should be placed per year? If the lead time is one (01) month, what is the re-order point for the assemblies?
- A company purchases special metal parts to make office furniture in lots of 100 units to satisfy an annual demand of 1600 parts. Holding cost for the parts is 0.3 dollars per unit per month and ordering cost is 40 dollars per order. Answer the following questions: Formulas: a) What is the EOQ? b) What are the costs previously (with 100 units per order) and now with EOQ. Hint: Calculate total holding cost and ordering cost for 100 units, and then same costs with EOQ. Which one (100 units or EOQ) is better in terms of costs? EOQ = SQRT(2Ds/h) THC=h*(Q/2) TOC=s*(D/Q) TC=THC+TOC please answer in excelAn office supply store open 5 days a week must determine the best inventory policy for boxes of copier paper (working days=250). Annual demand is nearly constant at 2500 boxes and when orders are placed, then entire shipment arrives at once. The cost per box is $22 and the inventory holding cost is 30%. Orders are placed at a cost of $40 each, including preparation time and communication charges, and the lead time is 2 days. a. Find the optimal order quantity. b. What is the reorder point? c. What is the total inventory cost? d. What is the cycle time?The Cerebro Computer Store purchase printers for $100 each. Demand for this is constant during the year, and annual demand is forecasted to be 1350 units. The holding cost is $20 per unit per year, while the cost of ordering is $90 per order. There are 270 working days per year and the lead-time is 8 days. What is the annual order cost? Enter your answer with two decimal places.
- Demand for a popular athletic shoe is nearly constant at 1600 pairs per week for a regional division of a national retailer. The cost per pair is $64. It costs $75 to place an order, and annual holding costs are charged at 25% of the cost per unit. The lead time is 3 weeks. One year has 52 weeks.a. What is the Economic Order Quantity?b. What is the reorder point?c. What is the cycle time?d. What is the total annual cost?Authentic Thai rattan chairs (shown in the photo)are delivered to Gary Schwartz’s chain of retail stores, called TheKathmandu Shop, once a year. The reorder point, without safety stock,is 200 chairs. Carrying cost is $30 per unit per year, and the cost of a stockout is $70 per chair per year. Given the following demand prob-abilities during the lead time, how much safety stock should be carried? DEMAND DURING LEAD TIME PROBABILITY0 0.2100 0.2200 0.2300 0.2400 0.2Saga ltd. produces electronic toys for children between the ages of 7-10 years old. The toys use a processor that is imported from Japan. Annual demand for the processor is 12,500. The holding cost per processor per year is $2. Ordering cost per order is $400. Lead time is 7 days and the number of working days in the year is 250. d. What is the optimal number of days between any two orders? e. What is the reorder point? f. Given the EOQ, what is the total annual inventory cost?
- An company of furniture manufacturing purchases timber wood planket at $ 56 per unit. The annual demand of timber planket is 6500 units.. the ordering cost is $ 250 per order, carrying cost is $ 7 per unit, lead time is 8 day. Calculate economic order quantity and the reorder point when the per day demand is 34 units .ABC company has a need for goods per week is 100 kg, lead time based on observation = 3 weeks and safety stock is set at 40% of the need during the lead time. Based on these data, are you looking for the reorder point value of ABC company?Q 1 Super K Beverage Company distributes a soft drink that has a constant annual demand rate of 4,600 cases. A 12-pack case of the soft drink costs Super K $2.25. Ordering costs are $20 per order, and inventory-holding costs are charged at 25 percent of the cost per unit. There are 250 working days per year, and the lead time is four days. Find the economic order quantity and total annual cost, and compute the reorder point. Q 2 Environmental considerations, material losses, and waste disposal can be included in the EOQ model to improve inventory management decisions. Assume that the annual demand for an industrial chemical is 1,200 lb, item cost is $5/lb, order cost is $40, inventory-holding cost rate (percent of item cost) is 18 percent. Q3 An insurance claims work area has five claims waiting for processing as follows. Job Processing Time Due Date (Di) 1 22 35 2…