A plywood manufacturer produces a piece of plywood at a labor cost of PO.50 and material cost of P3.00. The fixed charges of the business are P50, 000 a month and the variable cost is PO.50 apiece. If one piece of plywood sells for P6.00, How many pieces must be produced each moth for the manufacturer to break even?
Q: The cost of production is given by C(q) = 1/3 q3 -15/2 q2 +36q+ 81. For what number of units, the…
A: The cost of production is given by C(q) = 1/3 q3 -15/2 q2 +36q+ 81 Average Cost= c/q=1/3…
Q: A mill producing steel plate has fixed costs of $100,000 per week and variable costs of $0.15 per…
A: Variable costs vary based on the amount of output produced. Variable costs may include labor,…
Q: Your firm has discovered a cheap and efficient technology of turning used plastic bottles and bags…
A: Opportunity cost is the benefit that is sacrificed when the second-best alternative is not chosen
Q: In the design of a jet engine part, the designer has a choice of specifying either an aluminum alloy…
A: Güven Data: - Weight of aluminium casting / unit = 1.2 kg Cost of making aluminium Casting per kg =…
Q: The manufacturer produces certain items at a labor cost per unit of 315, material cost per unit is P…
A: The breakeven point is the level of production at which the costs of production equal the revenues…
Q: A part can be made either milling, or by broaching: The tooling for the milling machine will cost…
A: production volume estimates the aggregate sum your organization can deliver over a long time. It…
Q: What is the estimate of the cumulative average hours per unit required to produce the 5th unit of a…
A: Below is the given values: Learning curve = 70% First unit takes time = 53 hours
Q: A villager estimates that if he picks his orange crop now, he will obtain 2000 boxes of apples,…
A: If the crops are picked on the same day, he will have to sell less boxes. If he sells it a week…
Q: A company has a project for building and operating a new electricity generation station. The…
A: Total operation cost function is, C0=MHN5/3.Where Mis constant, H is operation hour and N is the…
Q: A plant engineer wishes to know which of two types of lightbulbs should be used to light a…
A: Minimum Acceptable Rate of Return (MARR) is the rate of return that a company uses to compare with…
Q: Almona, Inc. is your dad’s company. It manufactures electrostatic generators for classroom…
A: A variable cost is an expense that adjusts the extent to the production outputs. At the point when…
Q: The cost of making a small transistor radio is 23.00 php in labor costs and 37.00 php in material…
A: Given; Labor cost of making a small transistor radio= 23.00php Material cost of making a small…
Q: A manufacturer produces certain items at a labor cost of P 115 each, material cost of P 76 each and…
A: Given: The labor cost is = P115 each The material cost is = P76 each The variable cost is = P2.32…
Q: Find the average time per unit required to produce the first 35 units, if the slope parameter of the…
A: Given, Number of units(x)= 35 Learning rate = 85% Time to produce first unit =448
Q: With respect to production, the short runis best defined as a time period O lasting up to six…
A: Economics is a branch of social science that describes and analyzes the behaviors and decisions…
Q: Estimate the cost of a 0.75 million gallon per day (MGD) induced-draft packed tower for…
A:
Q: A Fast-Moving Consumer Goods (FMCG) Company produces certain items at a labor cost of P 115 each,…
A: Given information are- Labor cost =P115 per unit Material cost =P76 per unit Variable cost =P9 per…
Q: Construction on your custom home is complete and now the yard must be landscaped. The landscape…
A: The requirement indicates that there is a need for 8 cubic yards of dirt and 3 cubic yards of sand.…
Q: Company ABC can produce a certain transistor at a cost of ₱1.20 for labor, ₱2 for material and a…
A: Let the number of transistor be T Variable cost includes labor cost, material cost and other…
Q: Smithson Cutting is opening a new line of scissors for supermarket distribution. It estimates its…
A: The break-even point is the point at which total cost and total revenue are equal, meaning there is…
Q: Compute the contribution margin per unit if the total fixed cost is P400, 000 and breakeven point is…
A: Breakeven point = Fixed cost / (Sales price per unit - variable cost per unit) Contribution margin =…
Q: A rotational molding operation has fixed costs of $9,000 per year and variable costs of $53 per…
A: Rotational Modeling Fixed Cost = 9,000 Variable Cost = 53 Automated Fixed Cost = 39,000 Variable…
Q: An architect-engineering firm is planning a parking lot to accommodate 500 vehicles. Each parking…
A: Calculate the estimated cost of paving and making the parking lot: Calculate each parking space:…
Q: A manufacturer produces a certain product at a labor cost of P 315 per unit, material cost of P 100…
A: Here, given information is: Per unit labor cost: P315 Per unit material cost: P100 Per unit…
Q: A furniture manufacturer has an annual overhead cost of P120,000 plus 20% of the sales in pesos.…
A: Breakeven point refers to the situation where the total cost of the production is equal the total…
Q: Acme Manufacturing Company has a contract to deliver (100 + XX), (250 +XX), (190 + XX), (140 + XX),…
A: Let xi=the number of windows made within month i
Q: Smithson Cutting is opening a new line of scissors for supermarket distribution. It estimates its…
A: Given information is: Fixed cost: $500 Variable cost: $0.65 per unit Selling price: $0.85 per unit…
Q: A firm is selling two products-chairs and bar stools-each at $50 per unit. Chairs have a variable…
A: Total Cost = Total Variable Cost + Total Fixed Cost The Break-even point is the point where the firm…
Q: A 1,500,000 SF plant employs 300 people and produces 233,000 LCD panel per month. The plant is idle,…
A: Operating costs or operational costs, are the expenses which are related to the operation of a…
Q: alculation of break-even point for mask production/sale in the vicinity. Can a break-even point be…
A: Break-even Point Break-even Point is the point where the firm's total revenue is equal to the total…
Q: M. Cotteleer Electronics supplies microcomputer circuitry to a company that incorporates…
A: As we answer only 3 subparts and the question has more than 3 subparts, so we would be answering the…
Q: A telephone switchboard 100 pair cable can be made up with either enameled wire or tinned wire.…
A: Number of soldered connection= 400 The cost of soldering a connection on the enameled wire= P16.50…
Q: Identify each of the following cash items whether it is fixed cost, variable cost, sunk cost, or…
A: Since you have posted a question with multiple subparts, we will solve first three subparts for you.…
Q: Q2 Mega Holding is a contractor company specialise in bridge construction. The company has been…
A: Given information 2 projects are given A and B
Q: FEMA (Federal Emergency Management Agency) has ordered 25 specialized test units capable of field…
A: Here, FEMA has ordered 25 specialized test its capable of field checking separate elements Thompson…
Q: Khaled has developed a new technology device that is so exciting he is considering quitting his job…
A: Dear student, you have asked multiple sub-part questions in a single post. In such a case, I will be…
Q: The cost of producing a commodity consists of P35 per unit of labor, P42 per unit of materials, and…
A:
Q: The company PT. Surya Kencana requires raw materials of 50,000 kg per year, with a purchase price…
A: Economic Order Quantity is the quantity of goods which company should purchase to mange or minimize…
Q: Given the Total cost Function, TC = 5,600 + 27Q - 6Q² - .5Q³, solve for AC, MC, AVC and AFC
A: Formula to calculate:- 1) Average Cost AC=TCQ 2) Marginal Cost MC=dTCdQ 3) Average variable cost…
Q: average variable cost (AVC) of the following equation: C = 10 + 10q – 4q2 + q3
A: The cost function comprises of two parts- fixed costs and variable costs. The fixed costs remain the…
Q: A company is analyzing a make-versus-purchase situation for a component used in several products,…
A: Cost: The term cost alludes to the money related estimation of consumptions for crude materials,…
Q: The fixed cost for a steam line per meter of pipe is $450X + $50 per year. Thecost for loss of heat…
A: b) We can find the thickness of the pipe by minimizing the total cost per year Total yearly cost =…
Q: The ore of a gold mine in the Mountain Province contains, on the average, 0.5 gram of gold per ton.…
A: Profit per gram = Price per gram - Processing cost per gram
Q: Q2/2 Derive the average cost function from :TC = 20 + 10GQ + %3D
A: Answer; Total Cost TC = 20 + 10Q + Q2/2 Average cost is the total cost per unit quantity…
Q: Sally Statistics is implementing a system of statistical process control (SPC) charts in her factory…
A: Using Wright's cumulative average model: When 75% of learning curve in statistical process control…
Q: Given the following Total Cost = Q3-36Q²-156Q + 20000 FC = 20000 O True %3D
A: The fixed cost refers to the cost that does not change with change in the output. The variable cost…
Step by step
Solved in 2 steps with 1 images
- The fixed cost for a steam line per meter of pipe is $450X + $50 per year. Thecost for loss of heat from the pipe per meter is $4.8/X1/2 per year. Here, Xrepresents the thickness of insulation in meters, and X is a continuous designvariable. Solve, a. What is the optimum thickness of the insulation? b. How do you know that your answer in Part (a) minimizes total cost per year? c. What is the basic trade-off being made in this problem?A furniture manufacturer has an annual overhead cost of P120,000 plus 20% of the sales in pesos. Labor costs P20 per set and the materials cost P10. He has a maximum capacity of 1000 sets per month but expects to produce only 8000 sets per year. If he could sell all what he expects to produce, how much is the selling price of each set just to break even? Show solutions.An architect-engineering firm is planning a parking lot to accomodate 400 vehicles. Each parking space will be 8.5 feet x 15 feet. It has been estimated that the space required for aisles will be 70 percentage of the space required for parking. A local paving company charges 8$ per square foot for paving and a flat fee of $10,600 for marking and painting the individual parking spaces. Based on this information, what is the estimated cost of paving and marking this parking lot? The estimated cost of paving and marking the parking lot is: $ ?
- The ore of a gold mine in the Mountain Province contains, on the average, 0.5 gram of gold per ton. One method of processing costs P1,650 per ton and recovers 93% of the gold, while another method costs only P1,500 per ton and recovers 81% of the gold. If gold can be sold at P8,500 per gram, which method is better and by how much?A cell phone company has a fixed cost of $1,000,000 per month and a variable cost of $22 per month per subscriber. The company charges $33 per month to its cell phone customers. a.What is the annual breakeven point for this company? b. The company currently has 95,000 subscribers and proposes to raise its monthly fees to $39.95, what is the new annual break-even point if the variable cost increases to $25 per customer per month? c.lf 20,000 subscribers will drop their services because of mönthly increase in part (b), will the company still be profitable?The company PT. Surya Kencana requires raw materials of 50,000 kg per year,with a purchase price per kg of Rp. 50, -. Storage fee per kg per year of 20%of raw materials per kg. Order fee (every time you place an order) of Rp.10.000, -, Safety Stock is determined equal to material requirement for 15 days and lead timefor 10 days.Based on the data above, you are asked to:a. Calculate Economic Order Quantity (EOQ)b. The frequency of purchases for one year.c. Determine the Re-order Point, if one year operates 360 days.
- Rho Merchandising supplies T-shirts to AK Mart. Currently, Rho orders T-shirts from varioussuppliers. One of the T-shirts is ordered in batches of 150 units. It has been estimated that an annualdemand for T-shirts is 25,000 pieces. Furthermore, carrying cost is estimated to be P10 per T-shirt peryear. For the other policy to be optimal, determine what the ordering cost would have to be.An Engineering consultant firm measures its output in a standard hour unit, which is a function of the personnel grade levels in the professional stuff. The variable cost is $62 per standard service hour. The charge-out rate (i.e., selling price) is $85.56 per hour. The maximum output of the firm is 160,000 hours per year, and its fixed cost is $2,024,000 per year. For this firm: (a) What is the breakeven point in standard service hours and in percentage of total capacity? (b) What is the percentage reduction in breakeven (sensitivity) if fixed costs are reduced 10%; if variable cost per hour is reduced 10%; and if the selling price per unit is increased by 10%. Note:- Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism. Answer completely. You will get up vote for sure.In connection with surfacing a new highway, a contractor has a choice of two sites on which to set up the asphalt-mixing plant equipment. The contractor estimates that it will cost $1.25 per cubic yard mile (yd3 –mile) to haul the asphalt-paving material from the mixing plant to the job location. Factors relating to the two mixing sites are as follows: (See pic) The job requires 50,000 cubic yards of mixed-asphalt-paving material. It is estimated that four months (17 weeks of five working days per week) will be required for the job. Compare the two sites in terms of their total costs. Assume that the cost of the return trip is negligible. A) Which is the better site? B) For the selected site, how many cubic yards of paving material does the contractor have to deliver before staring to make a profit if paid $8.35 per cubic yard delivered to the job location?
- The economic order quantity of Inc. is 1,000 unit. They sold their sole product for a selling price of P5. It takes P20,000 a year for Inc. in ordering 1,000 units per transaction. Carrying cost is P4 per unit per year. The lead time for this product is one week. How much sales revenue should Inc. have for this economic order quantity to be plausible? (Use 360 days a year)Tom borrowed Php500,000 from her parents to open a spa. He pays her parents a 5% yearly return on the money they lent her. Her other yearly fixed costs equal Php150,000 and his variable costs equal Php200,000. In her first year, Tom had a total of 2,000 customers at a price of Php300/customer. Tom's total fixed cost isYour car gets 29 miles per gallon (mpg) at 60 miles per hour (mph) and 25 mpg at 70 mph. At what speed should you make a 525-mile trip: (a) If gas costs $3 per gallon and your time is worth $18/hr? (b) If gas costs $4 per gallon and your time is worth $12/hr? (c) If gas costs $5 per gallon and your time is worth $9/hr? (d) Build a spreadsheet to calculate the total trip cost for gas costs of $2, $3, $4, and $5 and values of time of $6, $9, $12, $15, and $18 per hour. Do two tables: one at 60 mph and one at 70 mph.