A proposed embankment fill requires 6900 ft³ of compacted soil. The void ratio of the compacted fill is specified as 0.5. Four borrow pits are available as below, which list the respective void ratios of the soil and the cost per cubic feet for moving the soil to the proposed construction site. Make the necessary calculations to determine the total cost for each pit. Assume the specific gravity of soil solids, Gs to be the same at all pits. 1. Calculate the volume of solid (Vs) = ft³ Borrow Pit A: void ratio= 0.91 and the unit cost = $9 /ft³ 2. Calculate the total cost to pay to Pit A = Borrow Pit B: void ratio = 0.95 and the unit cost = $ 11 /ft³ 3. Calculate the total cost to pay to Pit B = Borrow Pit C: void ratio = 1.05 and the unit cost = $ 8 /ft³ 4. Calculate the total cost to pay to Pit C = Borrow Pit D: void ratio = 0.65 and the unit cost = $ 10/ft³ 5. Calculate the total cost to pay to Pit D =

Principles of Foundation Engineering (MindTap Course List)
9th Edition
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter5: Soil Improvement And Ground Modification
Section: Chapter Questions
Problem 5.13P
icon
Related questions
Question
Please round to the nearest One (i.e., 1).
PLEASE DO NOT USE COMMA(S) ON YOUR ANSWER!!!
A proposed embankment fill requires 6900 ft³ of compacted soil. The void ratio of the compacted fill is specified as 0.5.
Four borrow pits are available as below, which list the respective void ratios of the soil and the cost per cubic feet for
moving the soil to the proposed construction site. Make the necessary calculations to determine the total cost for each
pit. Assume the specific gravity of soil solids, Gs to be the same at all pits.
1. Calculate the volume of solid (Vs) =
ft³
Borrow Pit A: void ratio= 0.91 and the unit cost = $9 /ft³
2. Calculate the total cost to pay to Pit A =
Borrow Pit B: void ratio = 0.95 and the unit cost = $ 11 /ft³
3. Calculate the total cost to pay to Pit B =
Borrow Pit C: void ratio = 1.05 and the unit cost = $8 /ft³
4. Calculate the total cost to pay to Pit C =
Borrow Pit D: void ratio = 0.65 and the unit cost = $ 10/ft³
5. Calculate the total cost to pay to Pit D:
us page
2
W
A S
F2
#3
20
F3
E
D
000
000 F4
$
4
R
F
%
AMA
F5
T
MacBook Air
A
6
G
F6
Y
44
&
7
F7
U
► 11
*
F8
Next page
9
F9
Transcribed Image Text:Please round to the nearest One (i.e., 1). PLEASE DO NOT USE COMMA(S) ON YOUR ANSWER!!! A proposed embankment fill requires 6900 ft³ of compacted soil. The void ratio of the compacted fill is specified as 0.5. Four borrow pits are available as below, which list the respective void ratios of the soil and the cost per cubic feet for moving the soil to the proposed construction site. Make the necessary calculations to determine the total cost for each pit. Assume the specific gravity of soil solids, Gs to be the same at all pits. 1. Calculate the volume of solid (Vs) = ft³ Borrow Pit A: void ratio= 0.91 and the unit cost = $9 /ft³ 2. Calculate the total cost to pay to Pit A = Borrow Pit B: void ratio = 0.95 and the unit cost = $ 11 /ft³ 3. Calculate the total cost to pay to Pit B = Borrow Pit C: void ratio = 1.05 and the unit cost = $8 /ft³ 4. Calculate the total cost to pay to Pit C = Borrow Pit D: void ratio = 0.65 and the unit cost = $ 10/ft³ 5. Calculate the total cost to pay to Pit D: us page 2 W A S F2 #3 20 F3 E D 000 000 F4 $ 4 R F % AMA F5 T MacBook Air A 6 G F6 Y 44 & 7 F7 U ► 11 * F8 Next page 9 F9
Expert Solution
steps

Step by step

Solved in 4 steps with 2 images

Blurred answer
Knowledge Booster
Pricing excavation and backfill
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning