A short 3-phase transmission line connected to a 33kV, 50HZ generating station at the sending end is required to supply a load of 10MW at 0.8 lagging power factor. If the minimum transmission efficiency is to be limited to 96%. estimate the per phase values of transmission parameters.

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter5: Transmission Lines: Steady-state Operation
Section: Chapter Questions
Problem 5.25P
icon
Related questions
icon
Concept explainers
Question
of IHHE 19 JS2.
A short 3-phase transmission line connected to a 33kV, 50HZ generating
station at the sending end is required to supply a load of 10MW at 0.8 lagging
power factor. If the minimum transmission effciency is to be limited to 96%.
estimate the per phase values of transmission parameters.
5.
Transcribed Image Text:of IHHE 19 JS2. A short 3-phase transmission line connected to a 33kV, 50HZ generating station at the sending end is required to supply a load of 10MW at 0.8 lagging power factor. If the minimum transmission effciency is to be limited to 96%. estimate the per phase values of transmission parameters. 5.
Expert Solution
steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Transmission line parameter
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning