5. A short 3-phase transmission line connected to a 33KV, 50HZ generating station at the sending end is required to supply a load of 10MW at 0.8 lagging power factor. If the minimum transmission efficiency is to be limited to 96%, estimate the per phase values of transmission parameters.

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter2: Fundamentals
Section: Chapter Questions
Problem 2.26P: A small manufacturing plant is located 2 km down a transmission line, which has a series reactance...
icon
Related questions
icon
Concept explainers
Question
Paragraph
Edting
5. A short 3-phase transmission line connected to a 33KV, 50HZ generating
station at the sending end is required to supply a load of 10MW at 0.8 lagging
power factor. If the minimum transmission efficiency is to be limited to 96%,
estimate the per phase values of transmission parameters.
Transcribed Image Text:Paragraph Edting 5. A short 3-phase transmission line connected to a 33KV, 50HZ generating station at the sending end is required to supply a load of 10MW at 0.8 lagging power factor. If the minimum transmission efficiency is to be limited to 96%, estimate the per phase values of transmission parameters.
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Transmission line parameter
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning