a short three phase transmission line connected to 33kv 50 hertz generating station at starting and is required to supply a load of 10 MW at pointed start lagging power factor at 30 KV addresses in that is the minimum transmission efficiency is to be determined96% estimate the per face value of resistance and inductance of a line

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter2: Fundamentals
Section: Chapter Questions
Problem 2.41P
icon
Related questions
icon
Concept explainers
Question
100%

a short three phase transmission line connected to 33kv 50 hertz generating station at starting and is required to supply a load of 10 MW at pointed start lagging power factor at 30 KV addresses in that is the minimum transmission efficiency is to be determined96% estimate the per face value of resistance and inductance of a line

Expert Solution
steps

Step by step

Solved in 5 steps with 6 images

Blurred answer
Knowledge Booster
Transmission line parameter
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning