A short 3-phase transmission line connected to a 33KV, 50 Hz generating station at the sending en required to supply a load of 10 MW at 0-8 lagging power factor at 30 kV at the receiving end. If minimum transmission efficiency is to be limited to 96%, estimate the per phase value of resistance inductance of the line. [2-4 Q; 0-028

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter6: Power Flows
Section: Chapter Questions
Problem 6.52P
icon
Related questions
icon
Concept explainers
Question
A short 3-phase transmission line connected to a 33kV, 50 Hz generating station at the sending end is
required to supply a load of 10 MW at 0-8 lagging power factor at 30 kV at the receiving end. If the
minimum transmission efficiency is to be limited to 96%, estimate the per phase value of resistance and
inductance of the line.
[2-4 Q; 0-028 H]
c001-
Transcribed Image Text:A short 3-phase transmission line connected to a 33kV, 50 Hz generating station at the sending end is required to supply a load of 10 MW at 0-8 lagging power factor at 30 kV at the receiving end. If the minimum transmission efficiency is to be limited to 96%, estimate the per phase value of resistance and inductance of the line. [2-4 Q; 0-028 H] c001-
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Load flow analysis
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning