According to the linear optimization model, what would be the total time spent for sound testing the Warax model?
Q: Consider an assembly line with 3 sequential operations A, B, and C with processing times per part of…
A: Production is the combination of the inputs to have the required output. It includes various tools,…
Q: Data collected on the yearly registrations for a Six Sigma seminar at the Quality College are shown…
A: Exponential smoothing determine with following formula Exponential smoothing = Alpha*At+(1-Alpha)*Ft…
Q: explain these please Strengths High-quality and pure spring water source from a natural spring…
A: Strengths of a company or product that provides bottled spring water in Grenada, a Caribbean…
Q: Given the following data for the processing time in hours for each Job in each Machine, determine…
A: Sequencing is an appropriate order of plan as per which the process of operations works. It defines…
Q: 21. Using Northwest Corner Rule, how many must be supplied from Visayas to Taguig? (a) 170 (b) 180…
A: As per Bartleby guidelines, we can only solve the first three subparts of one question at a…
Q: Chapter 11 discusses the components that create an organizational culture along with the various…
A: The above-given question is regarding organizational culture and its effect before moving ahead…
Q: A production process is shown in the figure above. The drilling operation occurs separately from,…
A: Find the Given details below: Operations Process time(minutes) Sawing 20 Sanding 20…
Q: The employee credit union at State University is planning the allocation of funds for the coming…
A: Decision Variables: Suppose-X1 the amount invested in automobile loanX2 be let the amount invested…
Q: John is operating a business in the Caribbean in the manufacturing sector. Over the years the…
A: This inquiry has to do with both strategic management and organizational structure and design. It…
Q: Eight Glasses A Day: The EGAD Bottling Company has decided to introduce a new line of premium…
A: note: Since backordering is most costly option, it wont be used because overtime and subcontracting…
Q: Additional Problem 19-1 (Algo) A small candy shop is preparing for the holiday season. The owner…
A: To find: (a) The number of bags to be prepared for maximum profit. (b) The expected profit. Given:…
Q: Following are two weekly forecasts made by two different methods for the number of gallons of…
A: Measuring the variability or dispersion of a data collection is done statistically using the term…
Q: 3. A company will soon be introducing a new product into a very competitive market and is currently…
A: Given: Company is launching a new product in a competitive market with a strategy to introduce the…
Q: SWOT analysis developed the hospital's interim integrated isolation wards. By completing a SWOT…
A: SWOT analysis is a useful tool for analyzing an organization's internal strengths and weaknesses as…
Q: A manufacturer has a production line with 4 serial machines and each unit needs to pass through all…
A: The above give question is to calculate the capacity rate of the process. Capacity utilization is a…
Q: s the PDCA Cycle important? Use it how?
A: First Let me describe the PDCA cycle, Plan: Discover and record possibilities; examine the issues…
Q: Identify the project developmental approach used for the project (constructing a bridge). Give…
A: We can make few assumptions based on project management practices for construction projects. The…
Q: Calculate (a) MAD and (b) MSE for the following forecast versus actual sales figures: (round your…
A: MAD is Mean absolute Deviation which is used for analysis the data. It is calculated with following…
Q: Instructions Considering the indirect approach to delivering bad news answer for the four questions…
A: Correct communication is crucial for effective communication in any setting, whether it's personal…
Q: . Explain the variables that should be reflected in a variable-fixed breakdown of a selling expense…
A: Concept- A selling cost financial plan is an arrangement that gauges the selling expenses that will…
Q: Which of the following is the “Evaluation” step in the supplier selection process?
A: Supplier evaluation is a procedure used to rate and accept prospective suppliers using both…
Q: weaknesses and opportunities that an eco-friendly packaging manufacturer has
A: Weaknesses: Higher production costs: Eco-friendly packaging materials can frequently be more…
Q: Plant manager is a typical job in Project management OSCM Capacity management Risk mitigation
A: This is an MCQ question, I would select the correct response with explanations, the detailed…
Q: Determine the optimal allocation of jobs to machines that will maximize total profit. The following…
A: An assignment problem is a technique to find the combinations of the optimal solution to the…
Q: Process standardization—what is it? Its parts?
A: Process standardization is a management approach that means to establish consistent and repeatable…
Q: a. What LP model is the best describe from the given problem? b. How many pairs of downhill skis…
A: Linear programming is one of the mathematical techniques that is widely used by companies. This…
Q: What are the 6 Strategic HR Issues in Global Assignments?
A: There are following six Strategic HR Issues in Global Assignments
Q: Jeff Winters is considering investing some money that he inherited. The following payoff table gives…
A: Mathematic models of decision-making help businesses take the correct decision for their operational…
Q: What are some of the challenges that a corporation would have to overcome in order to accomplish the…
A: Corporations may encounter complex and challenging task when combining a defined brand strategy…
Q: what is the implied utilization of the issue license?
A: Implied Utilization = (Actual Output / Maximum Possible Output) x 100% Actual output per hour = 75%…
Q: Projects are different - how do projects differ from other types of production, and how do the…
A: Projects are short-term initiatives created to accomplish a particular set of goals. Projects are…
Q: Buckley Enterprise sells a product that cost $450 per unit and has a monthly demand of 5,000 units.…
A: Inventory is the raw material that is particularly used in the production of goods. Inventory is the…
Q: Is 600 the value of the objective function?
A: A sort of mathematical technique called integer linear programming uses integer variables along with…
Q: (a) A fruit grower has 150 acres of land available to raise two crops, A and B. It takes one day to…
A: To find: The number of acres of each fruit should be planted to maximize profit. Given: The amount…
Q: For the past month, a plant that has an effective capacity of 6,000 has made only 5,000 hammers per…
A: The efficiency of the plant can be determined as the actual output divided by effective capacity.…
Q: A part is produced in lots of 800 units. It is assembled from 2 components worth $70 total. The…
A: The above-given question is to calculate the average cycle inventory and the value of that…
Q: What are the benefits of benchmarking?
A: Benchmarking refers to the process of comparing the performance of a system, process, or product…
Q: can u get the bcwp, bcws, schedule performance index, cost performance index (in a table)…
A: The following are the formulas used to compute BCWP, BCWS, SPI, CPI BCWP = % of work done × Actual…
Q: Manufacturing and industrial processes may be made more efficient with the help of IIoT thanks to…
A: The Industrial Internet of Things (IIoT) can help enhance the efficiency of manufacturing and…
Q: Large-scale integrated (LSI) circuit chips are made in one department of an electronics firm. These…
A: Given- Acceptable Quality Level, (AQL) = 17% = 0.17Lot Tolerance Percent Defective (LTPD) = 47% =…
Q: Using an example to explain the steps involved in project management would be useful, but is it even…
A: Here is a brief overview of the normal steps engaged with project management, utilizing the example…
Q: You have been serving as Electroscan's Project Manager and are now well along in the project.…
A: Status Summary of the Project: As the Project Manager for Electroscan's project, I am…
Q: Given the information in the following table: Activity IPAS A B C D E ● ● A A B,C D Draw the AOA…
A: Given- Activity Immediate Predecessors A - B A C A D B,C E D
Q: The postmaster of a small western town receives a certain number of complaints each day about mail…
A: Formulae used: For C Chart UCL= C¯ + z×C¯ LCL= C¯ - z×C¯ Standard deviation =C¯
Q: How can CRM, ERP, and EAI help businesses?
A: Customers continued patronage is crucial to any company's ability to keep its profit margins stable…
Q: Lambda Computer Products competed for and won a contract to produce two prototype units of a new…
A: Time taken by first unit to produced (T1) = 5000Time taken by second unit to produced (T2) =…
Q: When would you want more space for your belongings?
A: ANSWER : The need for more space for belongings can arise in various operational management…
Q: Enumerate and explain some organizational values or culture
A: Corporate values and culture are the tenets and beliefs that shape a company's character and…
Q: Conduct research to learn more about Porter, who created the model referenced in this unit. Who is…
A: Michael Porter is an American academic and professor at the Harvard Business School. He is a leading…
Q: John is operating a business in the Caribbean in the manufacturing sector. Over the years the…
A: 6. If John decides to expand to South Korea, Canada, Taiwan, Thailand, or Japan, a PESTEL analysis…
Pickson Luthiers Corporation makes four models of electric guitars, ScarCT, Dela Mort, Warax, and Invazen. Each guitar must flow through five departments, assembly, painting, sound testing, inspection, and packaging. The table below shows the relevant data. Production rates are shown in units/hour. (ScarCT is assembled elsewhere). Pickson wants to determine how many guitars to make to maximize monthly profit.
Pickson Luthiers Corporation | |||||
Data | |||||
Guitar Model | Selling price/Unit | Variable cost/Unit | Min Sales | Max Sales | |
ScarCT | 750.00 | 660.00 | 0 | 2500 | |
Dela Mort | 788.00 | 680.00 | 0 | 2000 | |
Warax | 800.00 | 700.00 | 100 | 1000 | |
Invazen | 850.00 | 800.00 | 80 | 500 | |
Production rates (units/hour) | ScarCT | Dela Mort | Warax | Invazen | Hours Available |
Assembly | - | 35 | 25 | 20 | 220 |
Painting | 35 | 20 | 15 | 10 | 220 |
Sound Testing | 20 | 10 | 20 | 18 | 220 |
Inspection | 10 | 12 | 8 | 5 | 220 |
Packaging | 9 | 10 | 5 | 8 | 220 |
Use a linear optimization model based on the data to answer the following question.
According to the linear optimization model, what would be the total time spent for sound testing the Warax model?
Group of answer choices
6
10.5
5
4
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 4 images
- bama pie company's assembly line operations (the assembly line operates for six hundred minutes per day) comprise of eleven tasks, with the longest task time being 2.4 minutes and the shortest task time being 0.4 minutes; the sum of the task times is eighteen minutes. the firm is working on balancing its assembly line operations. the firm needs to produce 200 pies per day; to achieve this, the firm calculates the required cycle time as ---- minutes?The textile company “Designs Sports” is dedicated to the production of sports clothing. In its line has shorts, pants and t-shirts. From management they requested to manufacture the quantity of each product to maximize profits. To manufacture each type of garment It goes through two areas, sewing and finishing. Furthermore, all three garments require the same type of fabric. Two people work in the sewing area, while in the production area finished only one. In the company we work 8 hours a day, 5 days a week. The Weekly fabric availability is 375 square meters. Lastly, each shirt contributes $100 US to profits, each short with $80 US; and each pair of pants with $150 US. Solve this operations research problem.A company is in the business of machining parts that go through various work centers. Suppose work center A feeds work center B with parts. The following times (in minutes) are given for each work center. Work Center Setup time Run time (per part) Move time A 3 0.5 6 B 2 0.1 8 A standard kanban container holds 50 parts that are transferred from work center A to work center B. The demand rate at work center B is four parts per minute. How many kanban containers are needed for this situation? 2. If move time is cut in half, what does this do to the number of containers needed? How much will this change reduce inventory?
- Georgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Cabinetmaker 1 Cabinetmaker 2 Cabinetmaker 3 Hours required to complete all the oak cabinets 50 44 32 Hours required to complete all the cherry cabinets 61 46 34 Hours available 35 25 30 Cost per hour $36 $43 $56 For example, Cabinetmaker 1 estimates that it will take 50 hours to complete all the oak cabinets and 61 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 35 hours available for the final…Georgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Cabinetmaker 1 Cabinetmaker 2 Cabinetmaker 3 Hours required to complete all the oak cabinets 47 40 27 Hours required to complete all the cherry cabinets 64 51 36 Hours available 40 30 35 Cost per hour $34 $41 $52 For example, Cabinetmaker 1 estimates it will take 47 hours to complete all the oak cabinets and 64 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 40 hours available for the final…Georgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Cabinetmaker 1 Cabinetmaker 2 Cabinetmaker 3 Hours required to complete all the oak cabinets 50 44 32 Hours required to complete all the cherry cabinets 61 46 34 Hours available 35 25 30 Cost per hour $36 $43 $56 For example, Cabinetmaker 1 estimates that it will take 50 hours to complete all the oak cabinets and 61 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 35 hours available for the final…
- JokersRWild makes playing cards in several different styles, but a “standard” deck of cards is used for planning purposes. The average worker at JokersRWild can make 10,000 sets of decks of cards per month at a cost of $3.40 per deck during regular production and $3.70 during overtime. The company currently employs 35 workers. Experience shows that it costs $1,700 to hire a worker and $1,700 to fire a worker. Inventory carrying cost is $.49 per deck per month. The beginning inventory is 54,000, and at least that amount is desired each month. Assume hiring and layoff/firing, if necessary, occur at the beginning of the month. Month January February March April May June Demand 200,000 240,000 200,000 530,000 540,000 870,000 e. Develop a six-month production plan based on chase by changing workforce level. (Leave no cells blank - be certain to enter "0" wherever required.) Chase Production Plan – Changing Workforce Level Month Demand Regular Production Ending…You work for a small shipping company and warehouse. The owners have decided to update the software used for tracking, shipping, receiving, and inventory. Fifteen computers need to be updated. Hours of operation are 7 a.m. to 7 p.m. Monday through Saturday. Each computer must be updated manually by one of two trained employees, both of whom must be borrowed from other managers. The update procedure consumes 4 hours of the updater's time and generates an additional 1.5 hours of computer downtime. The work must be performed at a central loading station, away from the current location of the computer. How does the project portfolio management approach lead to enhanced strategic management for an organization and give an example how you woulduse this in a work place?A production line is a set of sequential operations established in a factory plant where components are assembled to make a finished product or where materials are put through a refining process to produce an end-product that is suitable for onward consumption. Ford have seven production lines in their manufacturing plant for their automotive parts where each production line produces 120, 100, 80, 116, 77, 94, 112 output per day. (a) As the Production Manager at Ford, you are required to submit the daily report of the production plant. Calculate the mean, median, and mode from the data based on the output that has been provided. (b) Also calculate the three critical parameters for measuring spread in the following ways: Range Variance Standard Deviation
- Panini, a popular sandwich shop, offers 3 types of sandwiches: grilled vegetables, grilled chicken, and pastrami. The table below provides demand data: Grilled Vegetables Grilled Chicken Pastrami Demand per hour 25 9 12 There are up to five steps in the process of making sandwiches listed below with activity times (if no activity time, then than step is not done for that sandwich). Only 50% of customers want their sandwich toasted, no matter which sandwich is ordered. Step Grilled Vegetables(in minutes) Grilled Chicken(in minutes) Pastrami(in minutes) Cut bread 1 1 1 Grill 1.2 1.2 Slice meat 2 Toast 1.2 1.2 1.2 Wrap 0.8 0.8 0.8 Suppose Panini employs 1 worker at each step. a) Does Panini have enough capacity to fulfill the current demand for sandwiches? (b) What is the current capacity cushion for Panini? (as a %) c) If demand for Pastramis increase with the percentage indicated below, how much additional workers should Panini hire (if any), and where…Peter Bell of Bell Electronics maintains an extensive stock of computer components for the consumer market. He has hundreds of drawers/cabinets for the many small parts (motherboards, graphic cards, fans, etc.), and he wants to organize them so as to mjnimjze his travel and maximize his time a t the counter interacting with customers. a) Which item should be stored at the very front (closest to the counter)?b) Which item should be stored at the very back (furthest from the counter)?Yost-Perry Industries (YPI) manufactures a mix of affordable guitars (A, B, C) that are fabricated and assembled at four different processing stations (W, X, Y, Z). The operation is a batch process with small setup times that can be considered negligible. The product information (price, weekly demand, and processing times) and process sequences are shown below. Purchased parts and raw materials (shown as a per-unit consumption rate) are represented by inverted triangles. YPI is able to make and sell up to the limit of its demand per week with no penalties incurred for not meeting the full demand. Each workstation is staffed by one highly skilled worker who is dedicated to working on that workstation alone and is paid $15 per hour. The plant operates one 8-hour shift per day and operates on a 5-day work week (i.e., 40 hours of production per person per week). Overhead costs are $9,000/week. Which of the four workstations, W, X, Y, or Z has the highest aggregate workload, and thus…