Allocating too much capacity to a location results in a. poor utilization, b. high utilization, c. poor utilization, d. high utilization, and as a result, higher costs. and as a result, higher costs. and as a result, lower costs. and as a result, lower costs.
Q: Torrance Refinery produces approximately 23.1 Million barrels of gasoline per year. A California…
A: Given data: Production per year (p)= 23.1 Million barrel Demand per year (D) = 5.3 Million barrels…
Q: XYZ Corporation operates two plants, each of which has a capacity of 170 units per day. Each day,…
A: Given that:
Q: Operations Management CH 3 QUESTION 22 Tucson Machinery, Incorporated, manufactures numerically…
A: Given data:
Q: Chiltern Farms “[T]he beautiful valley of Vyeboom nestled between the majestic Franschhoek Mountains…
A: The case is about a firm that grows and packs fruits for local and international markets. The…
Q: A start-up company in Vanderbijlpark that produces toy buses and cars, has two primary resources…
A: Here, I have been given a case, from these data, I would formulate an LP, after formulating this LP,…
Q: Draw generic supply chain process for colgate toothpaste product.
A: Supply chain refers to the system that includes the entire process of producing and delivering the…
Q: Explain Three (3) approaches that a buyer could take to obtain reliable information about suppliers’…
A: Here, let me describe the three approaches that a buyer could take to get reliable information about…
Q: Chiltern Farms “[T]he beautiful valley of Vyeboom nestled between the majestic Franschhoek Mountains…
A: Supply Chain Management relates to the distribution network that is laid out to move or dispatch…
Q: Assuming the selling profit for the luxury, regular and exportation models is 1500, 1300 2500…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: Develop a Pareto chart of the following causes of poor grades on an exam: Number 1 2 3 4 5 Choose…
A: I have entered the given Data: Now Arrange the above data from High to low, i.e. Highest Frequency…
Q: Management at Webster Chemical Company is concerned as to whether caulking tubes are being properly…
A: Find the Calculations below: Central line: Sum of Fraction Defectsn A central line is 0.0385…
Q: (3) A project was planned using PERT. Its expected completion time was determined to be 85 days. The…
A: NOTE: We are allowed to do one question only. Ans 3.
Q: The new-accounts officer at the Bank enrolls all new customers in checking accounts. During the…
A: Find the Calculations methods below: Arrival rate (λ): 5 Customers per hour Arrival rate (λ): 12…
Q: How would you measure project success?
A: The phrase "project success" refers to the particular standard decided upon by the customer and the…
Q: Zokit Industries (ZI) is a New York City based company that manufactures and distributes Turkish…
A: No is the number of boxes of Ortakoy flavor NB is the number of boxes of Beyoglu flavor The…
Q: a) What percentage improvement is needed in the supply chain strategy for profit to improve to…
A: First to identify the given data, the sales is $100,000, the given cost of material is 45% of sales…
Q: The normal time for this operation = 11 sec
A: Observed time = Average of recorded times = (8.4 + 8.6 + 8.3 + 8.5 + 8.7 + 8.5)/6 = 8.5 seconds
Q: Slack is the length of the time of an activity which can be delayed without delaying the entire…
A: Ans) 1) Slack basically indicates how much a activity can be delayed from its earliest time and…
Q: What is organizational behavior
A: Ans) Organizational Behaviour is defined as the study of human behaviour in organization environment…
Q: Outline the organisational documentation applicable to project integration and associated processes.
A: Integration management in projects is a sub field of project management that facilitates effective…
Q: Upper Control Limit (UCL) = ounces (round your response to two decimal places).
A: Mean (μ) = 14.0 ounces Standard Deviation (σ) = 0.20 ounce Sample Size (n) = 64 z = 3
Q: Discuss the importance of following a well-integrated change control process on IT projects. What…
A: A formal approach is called "Change Control." It is configured to allow project teams to change the…
Q: Discuss how operations management applies to the service sector.
A: When it comes to running a business, it's the job of operations management for services to create…
Q: Three activities are candidates for crashing on a project network for a large computer installation…
A: Formulae used: Crash cost per day =Crash cost - Normal costNormal time - Crash time
Q: 1. is the movement of materials into the facility. A Material Management B. Transportation C.…
A: Material Management The goal of materials management is to have the appropriate stuff available to…
Q: BBA Bank (a fictitious one) has a drive-through teller window and observed that 15 customers arrive…
A: Find the Given details below: Given details: Arrival Time 15 Customers per hour Service Time…
Q: Hart Manufacturing makes three products. Each product requires manufacturing operations in three…
A: As per the given instructions, the decision variables are as follows. P1 = Units of product 1…
Q: a) Activity that should be crashed first to reduce the project duration by 1 day is A b) Activity…
A: A network diagram related to the project shows the sequence of the task that is performed to…
Q: Problem 20-8 (Algo) Lakeside Bakery bakes fresh pies every morning. The daily demand for its apple…
A: *The question given in the heading is not relevant to the subject, so I have solved the below…
Q: K- The following table gives the number of pints of type A blood used at Damascus Hospital in the…
A: Given data is
Q: Among the advantages of using project management software are the provisions for; a. Logical…
A: Project management software is employed to plan, coordinate, and distribute resources. It clarifies…
Q: What is the difference between process versus product layout? Where is each best?
A: Here, I would establish the difference between process layout and product layout with examples,…
Q: Which of the following best explains why location pooling, lead-time pooling, and delayed…
A: Location Pooling: Location Polling is defined as it is a strategy which helps to…
Q: The table below includes a number of activities for a particular project. Find the time to complete…
A: Ans) Formula/Concept: Use table to make activity on node (AON) diagram. Carefully use followed by to…
Q: 6 The local technology store Wired In hired you to manage their inventory, which wwwww consists of 2…
A: Economic order quantity is the optimal quantity that an organization order to minimize the total…
Q: What is the product cost per unit?
A: Production is the process in which inputs are combined to have the required output. It includes a…
Q: (a) Using the decision variables x4 and 54. write a constraint that limits next week's production of…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: Solve the linear programming problem by the simplex method. Minimize x-7y subject to the constraints…
A: Min Z = x + 7 y subject to 2 x + 5 y ≥ 30 - 3 x + 5 y ≥ 5 8 x + 3 y ≤ 85 -…
Q: Under the operations analysis, how do you know how to assign responsibilities?
A: Operational analysis refers to the inspection or checking of the current state of performance for…
Q: i cant find the answer for societal supply chain management
A: The green supply chain is simply a supply chain that focuses on protecting the environment or at…
Q: Describe the steps used to develop a forecasting system.
A: Forecasting is a method of predicting the unknown. In other words, it is a step forward by looking…
Q: Draw out the below process: Customer places an order, the order is the specified a delivery time…
A: Different steps found in the given process are listed below. Placing an order with a delivery time…
Q: In your own words, describe cost of quality (COQ) and why an organization should be managing COQ.
A: Today the business world is becoming ever more competitive day by day. The client has a broad range…
Q: C&A's production sequence is making 200 pounds of wheat first, then switching to 100 pounds of white…
A: Given that the initial Inventory for white bread=200 pounds The Ending inventory for white bread=100…
Q: 2. The demand for assembly S is 100 units and it is due in Week 15. Each unit of S requires one unit…
A: Given data is
Q: Briefly describe the term project management. Describe what a project manager does.
A: A project is exceptional, quick work, undertaken to achieve planned goals, which could be…
Q: How many tyres should MWV order at once? (Hint: Consider a 12-month timeframe and recall that each…
A: Annual Demand (D) = 450 * 12 * 2 = 10,800 tyresPrice (P) = R 400Carrying Cost (C) = 15% of P = R…
Q: The Money Pit Mortgage Company is interested in monitoring the performance of the mortgage process.…
A: Use the following formulas: X-bar chart Upper control limit (UCL)=x ¯¯+zσxLower control limit…
Q: (d) Assume that the company wants to complete the project in six months or 26 weeks. What is the…
A: A network diagram related to the project shows the sequence of the task that is performed to…
Q: A food delivery company receives 108 orders per hour. Each driver can deliver 15 orders per hour.…
A:
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- TRUE OR FALSE Highly flexible facilities plans should be avoided because they do not achieve optimal results.Supertronics, Inc., would like to know how the firm’s profit-ability is altered by product mix. Currently, product mix isdetermined by giving priority to the product with the highestper-unit contribution margin (defined as the difference be-tween price and material cost). Details on the Supertronicsproduct line, including processing time at each workstation,follow:a. Assume that Supertronics has 5,500 minutes of capacityavailable at each workstation each week. Develop a linearprogram to define the production mix that maximizescontribution margin.b. Solve your formulation using a computer package such asPOM for Windows. c. Given your solution for part (b), which machine is thebottleneck?d. How would your formulation and solution in part(b) change if 50 units of each product were alreadycommitted to customers and thereby had to beproduced?Cooper River Glass Works (CRGW) produces four different models of desk lamps as shown in Figure 6.15. The operations manager knows that total monthly demand exceeds the capacity available for production. Thus, she is interested in determining the product mix that will maximize profits. Each model’s price, routing, processing times, and material cost are provided in Figure 6.15. Demand next month is estimated to be 200 units of model Alpha, 250 units of model a. Which station is the bottleneck? b. Using the traditional method, which bases decisions solely on a product’s contribution to profits and overhead, what is the optimal product mix and what is the overall profitability? c. Using the bottleneck-based method, what is the optimal product mix and what is the overall profitability ?
- A recruiter for a job placement agency is considering whether to pay $50,000 per year to lease a new recruiting facility in a prime location in Washington D. C. He estimates it will cost $50 per recruit to process the paperwork at this new location. He receives a $75 commission for each new recruit he processes. Part A - If the office space at this new location has design and effective capacities of 10,000 and 8,000 recruits processed annually, respectively, and 6,000 recruits will be processed per year, what will be the utilization of the office space?Part B - If his office space at this new location has design and effective capacities of 10,000 and 8,000 recruits processed annually, respectively, and he plans to be 90% efficient in his use of this space, how many recruits does he plan to process per year?How do we identify the predecessor node column since it is not given by the customer? How do we figure the predecessor node? Plz solve it accurately and completely.Assign the 4 departments in Table X to locations A, B, C, and D, which are separated by the distances shown in Table y, in such a way that transportation cost is minimized. Use this heuristic: assign departments with the greatest interdepartmental workflow first. See attached table. a.Fill up the table attached. b. Compute the total transportation cost if the cost to move one workload 1 meter apart is P5.00.
- Dont copy from any source of internet or other answering platforms I will sure downvote the answer Answer only have accurate knowledge and understanding otherwise surely downvote Suppose Host A wants to send a large file to Host B. The path from Host A to Host B hasthree links, of rates R1=500 kbps, R2=2 Mbps, and R3=1 Mbpsa. Assuming no other traffic in the network, what is the throughput for the file transfer?b. Suppose the file is 4 million bytes. Dividing the file size by the throughput, roughly howlong will it take to transfer the file to Host B?c. Repeat (a) and (b), but now with R reduced to 100 kbps. Answer only have knowledge otherwise surely downvoteCan you please solve this Q using slover for the option of having both Low capacity & high capacity. please attched the excel file (doing one of them, or none of them but not both)Scenario The KOREAN factory of Hi-Tech Metal, Inc. primarily manufactures plumbing system parts for gas pipes, drainage pipes, water supply pipes and hoses etc. A mainframe computer was used for scheduling, but it took a lot of time and unnecessarily put heavy workload on scheduling managers and on-site workers. Following are the associated problems to meet customers’ needs Lengthy 3 to 4 days schedule drafting time, caused by mainframe computer’s long processing time. Inflexibility of mainframe computer to sudden order changes, leading to tedious manual calculation and direct on-site adjustment Extra workload for on-site workers One-month base scheduling that cannot meet customers’ need, Task 4 Considering above scenario justify improvements and alternatives to design and manufacturing of plumbing system. [Improvements, alternative systems, explain the IoT systems and Industry4.0 impacts]
- Scenario The KOREAN factory of Hi-Tech Metal, Inc. primarily manufactures plumbing system parts for gas pipes, drainage pipes, water supply pipes and hoses etc. A mainframe computer was used for scheduling, but it took a lot of time and unnecessarily put heavy workload on scheduling managers and on-site workers. Following are the associated problems to meet customers’ needs Lengthy 3 to 4 days schedule drafting time, caused by mainframe computer’s long processing time. Inflexibility of mainframe computer to sudden order changes, leading to tedious manual calculation and direct on-site adjustment Extra workload for on-site workers One-month base scheduling that cannot meet customers’ need, Task 1 Considering above scenario Summarize the design process for the finished component [Identify components, explain the utilities and design process (5/7/10 step) for components]Josh Randall, a sales representative for WAI, has convincedhis customer (order #2 in Problem 9) to reschedule. Order #2 hasagreed to accept delivery of 25 units in week 2 as long as WAIcan also guarantee delivery of an additional 25 units in week 5.If WAI cannot meet both delivery requirements, the customerhas threatened to withdraw its entire order. You have alreadypromised orders 1, 3, and 4. Can you assure Josh that WAI willdeliver on time? Show your calculations.usinessman must decide whether to open a new mini grocery branch or simply extend the number of hours of its operation on its existing branch with a payoff of P 150,000. According to his friend, demand at the new location can either be low or high, which the probabilities are estimated to be 35% and 65%, respectively. If a new branch is opened and demand proves to be low, there is no need to operate on a 24-hr basis but instead, they will stick to 12-hrs operation with a payoff of P 100,000 or enhance marketing strategy through advertising. Projected response to advertising may either be favorable or not favorable, with estimated probabilities of 40% and 60%, respectively. If demand is favorable, the payoff grows to P 310,000 and if response is unfavorable, the payoff is P 120,000. The cost of advertising is P45,000. Required: a. Draw a decision treeb. Determine the expected value for each decision and event nodes.c. Which alternative is the best for the businessman?