An industrial engineer has designed two alternative methods for accomplishing a production job. Both methods involve the acquisition of the same working place and other capital equipment to be used for this job only. Method A calls for a crew consisting of three men each costing Php30/hr. This method will result in the production of 10 units per hour of which two will be reject. Method B calls for a crew of two men each costing Php35/hr and should result in the production of eight units per hour of which one will be reject. The cost of the direct material lost in each reject is Php20. If a certain total number of units is to be produced find which method is economical?

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter12: Queueing Models
Section: Chapter Questions
Problem 59P
icon
Related questions
Question
An industrial engineer has designed two alternative methods for accomplishing a production job. Both methods involve the acquisition of the same working place and other capital equipment to be used for this job only. Method A calls for a crew consisting of three men each costing Php30/hr. This method will result in the production of 10 units per hour of which two will be reject. Method B calls for a crew of two men each costing Php35/hr and should result in the production of eight units per hour of which one will be reject. The cost of the direct material lost in each reject is Php20. If a certain total number of units is to be produced find which method is economical?
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,