At Susie's Dress Manufacturing, the company's garment production lines produces 600 dresses in a day. The standard allowed minutes (SAM) for a single dress is 30 minutes. They employ 50 operators, who work 8 hours a day (lunch/break has been already accounted for). What is the total available maximum output at Susie's daily in minutes?
Q: Suppose the average demand for Proven Special Electric Motors (PSEM) is 30 per day and the three…
A: Given : Average demand per day = 30 Number of workers = 3 Per day working = 8 hours
Q: The staff training center at a large regional hospital provides training sessions in CPR to all…
A: Note-We are authorized to answer one question at a time, since you have not mentioned which question…
Q: Determine the utilization and the efficiency for each of these situations:a. A loan processing…
A:
Q: The stylish hair salon has three stylists who provide services to women. After checking in with the…
A: Average throughput time is calculated by adding four steps of the manufacturing process i.e.,…
Q: AVR supplies food for the vending machines at a university. As the machines are mistreated by the…
A:
Q: A company that makes a product recently purchased some new equipment that reduces the labor content…
A: Given data is Without new equipment: Workers required = 6 Output = 90 units/hour Workers wage =…
Q: Christopher's Cranks uses a machine that can produce 100 cranks per hour. The firm operates 12 hours…
A: THE ANSWER IS AS BELOW:
Q: The staff training centre at a large regional hospital provides training sessions in CPR to all…
A: Given Information: The design capacity of the training system = 2100 employees per year Effective…
Q: A Langley firm currently has $1,800 in sales and is operating at 60 percent of the firm's capacity.…
A: Full capacity sales refer to a scenario where the actual sales are compared with respect to the 100%…
Q: On a typical Saturday, Red Lobster serves 1,000customers. The restaurant is open for 12 hours. On…
A: Number of customers = 1000 Average number of customers = 150 Total batch of customers = 1000 / 150 =…
Q: A fleet repair facility has the capacity to repair 800 trucks per month. However, due to scheduled…
A: Design Capacity = 800 trucks Effective Capacity = 600 trucks Actual Output = 400 trucks
Q: Under ideal conditions, a service bay at a Fast Lube can serve 6 cars per hour. The effective…
A: Due to regulations that include quality issues, delays, as well as handling of materials, an…
Q: calculate takt time in seconds
A: Takt time refers to the rate at which a product must be completed for meeting the demand.
Q: What is Samantha's daily design capacity? b) What is Samantha's daily effective capacity? c) What…
A: Capacity indicating the maximum amount of output produced using a specific manufacturing layout.…
Q: A company that makes shopping carts for supermarkets and other stores recently purchased some new…
A: Given Information: Number of workers in the company = 5 workers Average production = 90 carts per…
Q: In a company that processes insurance claims, the average flow is 10 claims per hour and the average…
A: a) Based on Little’s Law , for an insurance company whose claims have the average flow rate of 10…
Q: In the context of an Accident and Emergency Department, high demand variation can be addressed by…
A: Demand management can be broadly defined as the within the organization that would make the…
Q: Our local maternity ward delivers 1,500 babies per year.On the average, 5 beds in the maternity ward…
A: Total no. of babies deliver per year= 1500 Average no. of beds which are filled= 5
Q: The boss at the Precision Machine Shop needs to de-finish the personnel policy,which minimises all…
A: Given that: For junior attendant: λ = 8 μ = 10 For junior attendant: λ = 8 μ = 16
Q: A company that makes shopping carts for supermarkets and other stores recently purchased some new…
A: Given Information: Before new equipment - Number of workers used = 5 Average production = 90 carts…
Q: The university has an ongoing community project in which it uses a machine in its mechanical…
A: Here, we have following data, these are like widgets per hour, the lab could operate 12 hours per…
Q: The manager of a car wash must decide whether to have one or two wash lines. One line will mean a…
A: Particulars One line Two lines Fixed cost per month 6000 11000…
Q: Effective capacity is:a) the capacity a firm expects to achieve, given the currentoperating…
A: Introduction: Effective capacity can be defined as the maximum amount of work that can be done by an…
Q: An 8-hour shift at maximum production yields 8,000 units at your factory. Increasing sales and…
A: In case there is a diminishing in the supply of labor and products while demand stays as before,…
Q: Zanmale Enterprise operates bread baking company. It is able to produce 8400 1341 week. The…
A: Given Data: Producing capacity =Input=8400 unit Effective capacity=Output=9600 unit
Q: When capacity cushion is high _____ a. Efficiency is high and utilization is low b. Efficiency and…
A: Capacity cushion refers to any capacity that is reserved to meet unexpected spikes in demand. It is…
Q: The Riverton Post Office has four stations for service. Customers line up in single file for service…
A: Given Arrival rate(λ) = 40 customers per hour Number of servers (C)= 4 μ=(60/4)=15 customers per…
Q: A fleet repair facility has the capacity to repair 800 trucks per month. However, due to scheduled…
A: We are allowed to do one question at a time. The answer is as below:
Q: A department works on 8 hours shift, 250 days a year and has the usage data of a machine, as given…
A: Processing time is the time taken by the company between customer order and fulfillment of customer…
Q: Calculate Capacity utilization whereas: Design Capacity…
A: The term "utilisation" can be defined as the ratio of actual output to capacity.
Q: A process currently services an average of 42 customers per day. Observations in recent weeks show…
A: Given, The average demand is 42 customers per day. Utilization is 90%. Demand in 5 years is 60%.…
Q: The Universal Manufacturing Company has a single assem-bly line that feeds two drill presses in…
A: Given data is, Units arrival time(λ)=90 units/hrUnits processing time(μ)=60 units/hr
Q: A company that makes shopping carts for supermarkets and other stores recently purchased some new…
A: Given data Current system Number of workers = 7 Output of the workers = 90 units or 90 carts per…
Q: If operated around the clock under ideal conditions, the fabrication department of an engine…
A: Capacity: Capacity can be described as the amount that can be delivered. Utilization:Utilization…
Q: he Dahlia Medical Center has 35 labor rooms, 18 combination labor and delivery rooms, and 2…
A: Total Capacity of Labor room = 35 rooms x 3 days x 24 hours = 2,520 hoursActual Utilization of Labor…
Q: The manager of a car wash must decide whether to have one or two wash lines. One line will mean a…
A:
Q: The call centre operates eight hours a day (0900-1700) five days a week and is closed on weekends.…
A: Call center operating hours = 8 hours/day, 5 days/week Peak Period = 15 weeks The average number of…
Q: A company that makes a product recently purchased some new equipment that reduces the labor content…
A: Answer: Multifactor productivity is derived by dividing the value of output with labor cost.…
Q: A) Compute labor productivity under each system. Use carts per worker per hour as the measure of…
A: Company X makes shopping carts which is planning to buy new equipment. The following is the…
Q: e new equipment, the company used 4 workers, who produced an average of 87 carts per hour. Workers…
A: Given that A Company used 4 workers, who produced an average of 87 carts per hour. Workers receive…
Q: A milling department has 10 machines. Each operates an average of eight hours before requiring…
A: Here, the number of machines is 10, which means population is finite. There is one adjuster, which…
Q: A company operates 8 hours per shift, two shifts per day, five days a week with 12 hours maintenance…
A: Operating hour(h) = 8 Number of per day shift(s) = 2 Days per week (d) = 5 Maintenance hour(M) = 12…
Q: A vending machine dispenses hot chocolate or coffee. Service time is 35 seconds per cup and is…
A: Given that: λ = 66 per hour μ = 60*60/35 = 102.86 per hour
Q: Determine the utilization and the efficiency for each of these situations: a. A loan processing…
A: Utilization and Efficiency are calculated by the following formula. Ans 1: Given data, Actual…
Q: Cakes baked by the Freshfood Bakery are transported fromthe ovens to be packaged by one of three…
A: Waiting time is defined as the time interval for which one has to wait after placing the request for…
Q: As the assistant manager of a restaurant, how many servers will you need given the following…
A: Given data: Demand = 91 dinners per hour Server target utilization = 90 % = 0.90 Service rate per…
Q: When a patient enters the Valley Health Clinical Laboratory to have his blood drawn and a Chemistry…
A: Given information:Number of techs (N) = 3Operating time per day (H) = 8 hours…
Q: At Susie's Dress Manufacturing, the company's garment production lines produces 600 dresses in a…
A: There is really a limit to how much can be produced in a given day and in industrial and…
Q: 1. Determine the utilization and the efficiency for each of these situations: a. A loan processing…
A:
Q: AVR supplies food for the vending machines at a university. As the machines are mistreated by the…
A: Given data: The machines break down at an average of three per hour and the breakdowns are…
At Susie's Dress Manufacturing, the company's garment production lines produces 600 dresses in a day. The standard allowed minutes (SAM) for a single dress is 30 minutes. They employ 50 operators, who work 8 hours a day (lunch/break has been already accounted for).
What is the total available maximum output at Susie's daily in minutes?
Step by step
Solved in 2 steps
- A milling department has 10 machines. Each operates an average of eight hours before requiring adjustment, which takes an average of 3.43 hours. While running, each machine can produce 50 pieces an hour. Use Table 1, Table 2 and Table 3. a. With one adjuster, what is the net average hourly output per machine? (Round your answer to 1 decimal place.) Number of Pieces ?? per machine b. If machine downtime cost is $75 per hour and adjuster cost is $31 per hour, how many adjusters would be optimal? Multiple Choice 1 2 3 4 5A Printed Circuit Board (PCB) machine installs integrated circuits onto a board. Before starting to produce a board, the PCB machine requires a 16-minute setup. Once in production, the PCB machine requires only 0.19 minute per board. a. Currently, the PCB machine produces 525 boards between setups. Given this operating process, what is the capacity of the PCB machine (in boards per min)? b. Currently, the PCB machine produces 525 boards between setups. Given this operating process, what is the utilization of the PCB machine? c. Say the PCB machine produces 400 boards s between setups and demand is 2 boards per minute. Given the operating process, what is the avergae inventory of boards anf the PCB machine? d. Demand for boards occurs at the rate of 2 boards per minute. What is the smallest batch size such that the PCB machine does not constrain the flow rate through the process?Kitty Wonderland (KW) makes toys for cats. KW’s managers have recently learned that they can calculate the average waiting time for an order from the time an order is received and the time it is manufactured. They have asked for your help and have provided the following information. Expected number of orders for the product: 2,000 Manufacturing time per order: 4 hours Annual machine capacity in hours: 10,000 After learning about the average waiting time, KW’s managers are confused. They do not understand why, if annual machine capacity is greater than the average number of orders for the product, there would be any waiting time at all. Briefly answer the following questions Calculate the average waiting time per order. The managers have asked for your suggestions on what they can do to minimize or eliminate waiting time. How would you respond? Management is expecting sales to increase. Will average waiting time increase or decrease? Explain briefly.
- Compare the following machines on the basis of their present worth. Use 12% per year.A company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used five workers, who produced an average of 80 carts per hour. Workers receive $10 per hour, and machine cost was $40 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $10 per hour, while output increased by four carts per hour.A) Compute labor productivity under each system. Use carts per worker per hour as themeasure of labor productivity.B) Compute the multifactor productivity under each system. Use carts per dollar cost (laborplus equipment) as the measure.C) Comment on the changes in productivity according to the two measures, and on which one you believe is the more pertinent for this situation.The following data pertain to operations at Quick Incorporated: Throughput time .................... 4 hours Delivery cycle time ................ 8 hours Process time ......................... 1 hour Queue time ........................... 2 hours The wait time for this operation would be: A) 4 hours B) 2 hours C) 8 hours D) cannot be determined from information provided
- When a patient enters the Valley Health Clinical Laboratory to have his blood drawn and a Chemistry Panel and CBC run, he spends, on average 2 minutes at patient check-in, 45 minutes in the waiting area, 5 minutes having his medical history updated, and 8 minutes having his blood taken. If the clinical laboratory has 3 full-time Lab Techs, operates 8 hours per day and demand is 75 patients per day, what is the takt time? Assume that the med techs take a 30 minute lunch. Please enter your response using this format: ## minutesA furnace repair team that services an average of four furnaces a day if the design capacity is six furnaces a day and the effective capacity is five furnaces a day.The staff training center at a large regional hospital provides training sessions in CPR to all employees. Assume that the capacity of this training system was designed to be 1800 employees per year. Since the training center was first put in use, the program has become more complex, so that 1400 now represents the most employees that can be trained per year. In the past year, 1350 employees were trained. Calculate the efficiency and the utilization of this system. An executive conference center has the physical ability to handle 1,100 participants. However, conference management personnel believe that only 1,000 participants can be handled effectively for most events. The last event, although forecasted to have 1,000 participants, resulted in the attendance of only 950 participants. What are the utilization and efficiency of the conference facility? . A fleet repair facility has the capacity to repair 800 trucks per month. However, due to scheduled maintenance of their…
- In a company that processes insurance claims, the average flow is 10 claims per hour and the average throughput time is six hours. How many claims are in the system on average? If the deman for claims to be processed is seven per hour and the capacity is eight per hour, what is the flow rate?A Printed Circuit Board (PCB) machine installs integrated circuits onto a board. Before starting to produce a board, the PCB machine requires a 20-minute setup. Once in production, the PCB machine requires only 0.15 minute per board. Assume there is ample demand. Currently, the PCB machine produces 500 boards between setups. Given this operating process, what is the capacity of the PCB machine (in boards per minutes)? answer:_________boards per minuteKnott’s Industries manufactures standard and super premium backyard swing sets. Currently it has four identical swing-set-making machines, which are operated 250 days per year and 8 hours each day. A capacity cushion of 20 percent is desired. The following information is also known: Standard Model Super PremiumModel Annual Demand Standard Processing Time Average Lot Size Standard Setup Time per Lot 20,000 7 min 50 30 min 10,000 20 min 30 45 min a. Does Knott’s have sufficient capacity to meet annual demand?b. If Knott’s was able to reduce the setup time for the Super Premium Model from 45 minutes to 30 minutes, would there be enough current capacity to produce 20,000 units of each type of swing set?