Brawdy Plastics, Inc., produces plastic seat belt retainers for General Motors at the Brawdy Plastics plant in Buffalo, New York. After final assembly and painting, the parts are placed on a conveyor belt that moves the parts past a final inspection station. How fast the parts move past the final inspection station depends upon the line speed of the conveyor belt (feet per minute). Although faster line speeds are desirable, management is concerned that increasing the line speed too much may not provide enough time for inspectors to identify which parts are actually defective. To test this theory, Brawdy Plastics conducted an experiment in which the same batch of parts, with a known number of defective parts, was inspected using a variety of line speeds. The following data were collected. 15 10 Line Speed 3 20 0 20 30 30 40 40 50 50 Number of Defective Parts Found 23 21 20 15 14 (a) Develop a scatter diagram with the line speed as the independent variable. : 18 14 11 10 20 30 40 Line Speed (feet per minute) 50 60 10- 3 0 30 10 20 30 Line Speed (feet per minutes (c) Use the least squares method to develop the estimated regression equation. 9-[ 13 (d) Predict the number of defective parts found for a line speed of 45 feet per minute. 10 34 0 (b) What does the scatter diagram developed in part (a) indicate about the relationship between the two variables? There appears to be a positive relationship between line speed (feet per minute) and the number of defective parts. There appears to be no noticeable relationship between line speed (feet per minute) and the number of defective parts. There appears to be a negative relationship between line speed (feet per minute) and the number of defective parts. 10 20 30 40 Line Speed (feet per minute) 60 @ 20 13 10- 34 0 10 20 30 40 Line Speed (feet per minute) 30 @
Brawdy Plastics, Inc., produces plastic seat belt retainers for General Motors at the Brawdy Plastics plant in Buffalo, New York. After final assembly and painting, the parts are placed on a conveyor belt that moves the parts past a final inspection station. How fast the parts move past the final inspection station depends upon the line speed of the conveyor belt (feet per minute). Although faster line speeds are desirable, management is concerned that increasing the line speed too much may not provide enough time for inspectors to identify which parts are actually defective. To test this theory, Brawdy Plastics conducted an experiment in which the same batch of parts, with a known number of defective parts, was inspected using a variety of line speeds. The following data were collected. 15 10 Line Speed 3 20 0 20 30 30 40 40 50 50 Number of Defective Parts Found 23 21 20 15 14 (a) Develop a scatter diagram with the line speed as the independent variable. : 18 14 11 10 20 30 40 Line Speed (feet per minute) 50 60 10- 3 0 30 10 20 30 Line Speed (feet per minutes (c) Use the least squares method to develop the estimated regression equation. 9-[ 13 (d) Predict the number of defective parts found for a line speed of 45 feet per minute. 10 34 0 (b) What does the scatter diagram developed in part (a) indicate about the relationship between the two variables? There appears to be a positive relationship between line speed (feet per minute) and the number of defective parts. There appears to be no noticeable relationship between line speed (feet per minute) and the number of defective parts. There appears to be a negative relationship between line speed (feet per minute) and the number of defective parts. 10 20 30 40 Line Speed (feet per minute) 60 @ 20 13 10- 34 0 10 20 30 40 Line Speed (feet per minute) 30 @
Elementary Geometry For College Students, 7e
7th Edition
ISBN:9781337614085
Author:Alexander, Daniel C.; Koeberlein, Geralyn M.
Publisher:Alexander, Daniel C.; Koeberlein, Geralyn M.
Chapter8: Areas Of Polygons And Circles
Section8.5: More Area Relationships In The Circle
Problem 30E: At the Pizza Dude restaurant, a 12-in. pizza costs 5.40 to make, and the manager wants to make at...
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Step 1: Define the formulas of slope and intercept,
VIEWStep 2: Construct the scatter plot.
VIEWStep 3: Determine the relationship that exists between the two variables using Part(a).
VIEWStep 4: Obtain the regression equation.
VIEWStep 5: Predict the number of defective parts found for a line speed of 45 feet per minute.
VIEWSolution
VIEWTrending now
This is a popular solution!
Step by step
Solved in 6 steps with 7 images
Recommended textbooks for you
Elementary Geometry For College Students, 7e
Geometry
ISBN:
9781337614085
Author:
Alexander, Daniel C.; Koeberlein, Geralyn M.
Publisher:
Cengage,
Glencoe Algebra 1, Student Edition, 9780079039897…
Algebra
ISBN:
9780079039897
Author:
Carter
Publisher:
McGraw Hill
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Elementary Geometry For College Students, 7e
Geometry
ISBN:
9781337614085
Author:
Alexander, Daniel C.; Koeberlein, Geralyn M.
Publisher:
Cengage,
Glencoe Algebra 1, Student Edition, 9780079039897…
Algebra
ISBN:
9780079039897
Author:
Carter
Publisher:
McGraw Hill
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,