he standard costs and actual costs for factory overhead for the manufacture of 2,500 units of actual production are as follows: Standard Costs Fixed overhead (based on 10,000 hours) 3 hours per unit @ $0.80 per hour Variable overhead 3 hours per unit @ $2.00 per hour Actual Costs Total variable cost, $18,000 Total fixed cost, $8,000
Process Costing
Process costing is a sort of operation costing which is employed to determine the value of a product at each process or stage of producing process, applicable where goods produced from a series of continuous operations or procedure.
Job Costing
Job costing is adhesive costs of each and every job involved in the production processes. It is an accounting measure. It is a method which determines the cost of specific jobs, which are performed according to the consumer’s specifications. Job costing is possible only in businesses where the production is done as per the customer’s requirement. For example, some customers order to manufacture furniture as per their needs.
ABC Costing
Cost Accounting is a form of managerial accounting that helps the company in assessing the total variable cost so as to compute the cost of production. Cost accounting is generally used by the management so as to ensure better decision-making. In comparison to financial accounting, cost accounting has to follow a set standard ad can be used flexibly by the management as per their needs. The types of Cost Accounting include – Lean Accounting, Standard Costing, Marginal Costing and Activity Based Costing.
Use this information to answer the question that follow.
The
Standard Costs | |
Fixed overhead (based on 10,000 hours) | 3 hours per unit @ $0.80 per hour |
Variable overhead | 3 hours per unit @ $2.00 per hour |
Actual Costs | |
Total variable cost, $18,000 | |
Total fixed cost, $8,000 |
Trending now
This is a popular solution!
Step by step
Solved in 3 steps