In a lightbulb manufacturing system, on average 1 lightbulb arrives every 0.5 hours. The average processing time of the system is 20 minutes for each lightbulb. There are two processing units. What is the probability that both processing units are idle? (percentage)
Q: Describe the effects of risk planning on risk evaluation and treat
A: Risks are ambiguous. But, certain of the risks that plan for do occur & that helps to individual…
Q: The McDonald's fast-food restaurant on campus sells an average of 4,000 quarter-pound hamburgers…
A:
Q: Answer the following questions in short: Define the following terms: • Operations Management • Goods…
A: Operations are the outcome of managing the internal workings of the company so it operates as…
Q: The term facework (giving or saving face) is used to describe the verbal and nonverbal strategies…
A: Kindly find the solutions to both the questions in the following steps.
Q: Explain how channel length and channel width can be strategically used by a retailer to position its…
A: Supply chain distribution can be stated as the manner in which organization or businesses gets their…
Q: rom Preventive Maintenance and how do you intend to implement Overall Equipment Effectiveness (OEE)…
A: A method of facility maintenance called Total Productive Maintenance (TPM) attempts to achieve…
Q: c) ZANJI Ltd does heat-treating jobs for customers. The company wants decide the job sequence for…
A: Find the Given details below: Given details: Jobs That Follow Jobs that Precede A B C D E A…
Q: explain how does inventory impact the financial health of a business?
A: Inventory management is either a source of success or a source of the decline in business.
Q: To maximize market share, what price do you suggest to the company executives? If the…
A:
Q: b) Samuel, production manager for an exercise equipment manufacturer, needs to schedule an order for…
A: Product structure representing the bill of materials in a hierarchical decomposition which helps to…
Q: steel company has two mills. Mill 1 costs $70,000 per day to operate, and it can produce 400 tons of…
A:
Q: Discuss the relationship between Materials Requirements Planning (MRP) and distribution requirements…
A: 1. MRP (Material Requirement Planning): MRP is a term that refers to the process of planning…
Q: Given the following network, with activity times in months, determine the earliest and latest activ…
A: A network diagram is a visual representation of a project which helps to identify critical paths and…
Q: Give some reasons for the poor decision making In the organisation.
A: Decision making is quality of an individual or a leader to make a decision in a situation where the…
Q: Red Top Cab Company receives multiple complaints per day about driver behavior. Over 9 days the…
A: The lower control limit can be computed as follows:
Q: Why is quality a critical function at Frito-Lay?
A: Quality control is all about reviewing all the factors involved in the production of products or…
Q: Find the three-month moving average of the sales of shoes for this year.
A: Three-point averages are derived by averaging three numbers in a series: the previous, next, and…
Q: Question 1: Four departments are to be located in a building. The expected personnel traffic flows…
A: Traffic Flow Theory is a methodology that aids transportation engineers in comprehending and…
Q: explain how an organisation can transform it's inventory management process to be proactive.
A: an organization can transform it's an inventory management process to be proactive by using the…
Q: Find the optimum solution for the following Integer Linear Programming problem using the Cutting…
A:
Q: 6. Discuss the indicators of whether a company’s strategy is working well.
A: The company is meeting its stated financial and strategic objectives, outperforming the industry on…
Q: On October 25 2015, one Euro traded for 1.106 US dollars, and thus one Us dollar traded for 0.942…
A: Globalization is described as the connectedness of the technology and trade that have made the world…
Q: Discuss the financial impact of logistics in today's business
A: Financial institutions are monitoring and dealing with the effects of the COVID-19 pandemic all…
Q: Effective capacity is: Multiple Choice a. also called theoretical capacity. b. base capacity plus…
A: Overall throughput, or quantity of the product a facility can keep, deliver, store, as well as…
Q: A company with a network of 10 pipelines transports mango juice according to the details shown in…
A: The maximum flow per hour:
Q: a) What is the expected time to complete the project?
A: The expected activity time is the time taken by the particular activity to complete the project…
Q: What are the types of project management 1. What is unique about each type 2. What are some pros…
A: The practice of supervising a team's efforts to meet all project objectives while maintaining within…
Q: You are the project manager of a kitchen renovation. You are in the execution phase of the project…
A: In order to sustain the request of the client, the manager is first required to access the available…
Q: Q1. The following table contains a list of activities for the completion of a thesis. Estimated…
A: ES -Early start time LS - Late start time EF - Early finish time LF - Late finish time ES =…
Q: Using above data, prepare a check sheet.
A: Check sheets are the sheets that use tally marks to collect data. It is a project management tool…
Q: After studying and extracting information from all relevant work done previously, how does the…
A: The accumulation of evidence extracted from the numerous printed research, technical & other…
Q: Illustrate with suitable examples, the COCOMO I and II model of project management.
A: To manage the software projects, we would work on two kinds of models, these are COCOMO I and II,…
Q: E F G H Consider the following job 1 TOTAL TASK DAYS UNTIL CRITICAL Estimated Days ASSEMBLY 2 3 JOB…
A: lateness is the difference of flowtime and due date FCFS assigns task as per the order they come…
Q: Sales are 30 000 units in September of 2021. The seasonal index for the month of September is 0.75.…
A: The computing method of seasonal adjustment was simple and easy and can lend in to spreadsheets to…
Q: Operations can help marketing by: a. Keeping the cost of capital lower b. Meeting production due…
A: operation process helps to transform inputs into output using different stages. An operation process…
Q: (1) In your opinion, how do theories of economic development guides one country in determining…
A: Economic growth is the increase in the goods and services produced by an economy in a country over a…
Q: Required: 1. Prepare a production cost report for the molding department. 2. Prepare a production…
A: Process costing: It is a type of costing method, where the direct costs are accumulated and indirect…
Q: Determine the best assignment of jobs to. What is the resulting total production of the assignment?
A: Assignment problems are of two kinds: minimisation problem for the costs and wastages and maximising…
Q: Discuss using any five examples why organizations are moving from supply chain management to…
A: Strategic supply chain management:- As supply chain management continues to become more complex,…
Q: Analyse the key challenges for Brendan and Maeve.
A: Risk management refers to identifying and managing the risks that can affect an organization. There…
Q: ct between you. complexity, ce
A: Complexity, consistency, and clarity
Q: The JPC Company has five different production jobs to complete next week. Five multipurpose…
A: Given data is
Q: Beth Perry purchases strawberries for P4.00 a case and sells them for P9.00 a case. The rather high…
A:
Q: When companies redesign their products or services, what are some of the factors that influence…
A: Redesigning a product or service entails altering the product's or service's features to reflect…
Q: Can you give me some examples of how the differences between project management and software project…
A: Project management:- Project management is an organizational process that directs a project from…
Q: When the units of demand are at its peak, the capacity will exceed the demand. * O False O True
A: Excess capacity is a situation where the demand for a product is less as compared to the amount of…
Q: You are given the following parameters for a project. There is an opportunity to upload your work in…
A: ES -Early start time LS - Late start time EF - Early finish time LF - Late finish time ES =…
Q: Q3. Consider the following project. Draw the project network, determine the time to complete the…
A: D(duration)=given in the question as normal time ES (Early start)= The first activity from where the…
Q: Why financial planning should always be anchored to the company's vision and mission?
A: A financial planning is important in every small or large businesses . It helps to achieve…
Q: Saved Photo There are four different types of moves in mixed-model production when cellular…
A: Given information is
Step by step
Solved in 2 steps
- A printing shop receives an average of one order per day. The average length of time required to complete an order is half a day. At any given time, the print shop can work on at most one job. Interarrivaltimes and service times are exponentially distributed.a. On average, how many jobs are present in the print shop?b. On average, how long will a person who places an order have to wait until it is finished?c. What is the probability that an order will begin work within two days of its arrival?A crew of mechanics at the Department of Transportation garage make minor repairs to snowplows during the winter. The snowplows break down at an average rate of 4 vehicles per day and breakdowns are distributed according to the Poisson distribution. The mechanic can service an average of 10 vehicles per day with a repair time distribution that approximates a negative exponential distribution. Assume an 8 hour day. On average, how long does a plow wait before the mechanic begins the repair? Group of answer choices 0.17 days 0.53 hours 53 minutes 1.33 hoursInstructions Assume that for a gas and car wash station one car can be serviced at a time. The arrivals follow a Poisson probability distribution, with an arrival rate of 1 car every 10 minutes and the service times follow an exponential probability distribution, with a service rate of 8 cars per hour. What is the probability that the station will be idle? What is the average number of cars that will be waiting for service? What is the average time a car will be waiting for service? What is the average time a car will be at the gas and wash station?
- Flow and waiting time through a process are affected by seasonal fluctuation in demand. What does this mean? If a corporation wants to limit the impact of this fluctuation, what steps can it take?A Printed Circuit Board (PCB) machine installs integrated circuits onto a board. Before starting to produce a board, the PCB machine requires a 16-minute setup. Once in production, the PCB machine requires only 0.19 minute per board. a. Currently, the PCB machine produces 525 boards between setups. Given this operating process, what is the capacity of the PCB machine (in boards per min)? b. Currently, the PCB machine produces 525 boards between setups. Given this operating process, what is the utilization of the PCB machine? c. Say the PCB machine produces 400 boards s between setups and demand is 2 boards per minute. Given the operating process, what is the avergae inventory of boards anf the PCB machine? d. Demand for boards occurs at the rate of 2 boards per minute. What is the smallest batch size such that the PCB machine does not constrain the flow rate through the process?A service facility consists of one server who can serve an average of two customers per hour (service times are exponential). An average of three customers per hour arrive at the facility (interarrival times are assumed to be exponential). The system capacity is three customers: two waiting and one being served. What is the probability that the server is busy at a typical point in time? If needed, round your answer to a whole percentage. The excel formula breaks the answer down to 0.8769. However 0.87 or 1% is showing as wrong answer.
- Assume that for a gas and car wash station one car can be serviced at a time. The arrivals follow a Poisson probability distribution, with an arrival rate of 1 car every 10 minutes and the service times follow an exponential probability distribution, with a service rate of 8 cars per hour. What is the probability that the station will be idle? What is the average number of cars that will be waiting for service? What is the average time a car will be waiting for service? What is the average time a car will be at the gas and wash station?A printing shop receives an average of 1 order per day.The average length of time required to complete an orderis .5 day. At any time, the print shop can work on at mostone job.a On the average, how many jobs are present in theprint shop?b On the average, how long will a person who placesan order have to wait until it is finished?c What is the probability that an order will be finishedwithin 2 days of its arrival?Netflix is a DVD movie rental company. They stock 50 DVDs of a recent blockbuster movie available for rental. Their rental fee is $4 per DVD per day. The inter-arrival time between rental requests for this movie is 2.5 hours, on average, with a standard deviation of 2.5 hours. Demand is steady throughout a 24-hour day (there is no evidence of other arrival patterns). Assume that if all copies of the DVD are rented, then customers are willing to wait for the next one to become available. Also, assume shipping is instantaneous (the shipping time is zero days). A DVD is rented, on average, for 5 days with a standard deviation of 3 days. What is the average number of unrented DVDs in Netflix’s warehouse? Hint: consider the average utilization.
- On average, a car arrives at a local Starbucks drive through every 1.54 minutes. The process is believed to follow a Poisson distribution. What is the probability that exactly 39 cars arrive in 2 hour(s)? Hint: Be very careful when entering answers smaller than 0.0001. Pr{X=39} = (specify xx.yy% as 0.xxyy)3.) Consider an M/M/2 system with an arrival rate of 9 per minute and a service rate of 8 per minute. What is the probability at least one of the servers is busy? Give your answer as a decimal and take it to three decimal places.The Shady Farm Milk Company can process milk at a fixed rate of 6,200 gallons/hour. The company’s clients request 104,000 gallons of milk over the course of one day. This demand is spread out uniformly from 8 a.m. to 6 p.m. The company starts producing at 8 a.m. and continues to work until all of the demand has been satisfied. How long does an average unit milk have to wait between its arrival at the dairy until it is processed?