Keuka Studies does custom metal sculptures of horses and other animals. A horse sculpture is composed of numerous parts. They use a lathe to construct two types of parts. The "Body" part is used to support the torso of the horse and the "Leg" part is used to support the legs. Each horse sculpture needs 1 Body part and 4 Leg parts. Switching between either of the types of parts requires 25 minutes. Once ready to produce, the lathe produces a Body part in 4 minutes and a single Leg part in 2 minutes. The lathe only makes horse parts. For parts (a)–(d) assume Keuka operates a cyclic schedule in which they make 100 Body parts and then 400 Leg parts. Suppose Keuka is capacity-constrained. Also, suppose that the process now has an Assembly resource which has 1 worker who is able to assemble a horse sculpture in 16 minutes. This is in addition to the Lathe resource. If Keuka designs a cyclic schedule for the lathe, how many Legs should they make each batch so as to minimize inventory while not constraining the flow through assembly?

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter4: Linear Programming Models
Section: Chapter Questions
Problem 73P
icon
Related questions
icon
Concept explainers
Topic Video
Question
100%

Keuka Studies does custom metal sculptures of horses and other animals. A horse sculpture is composed of numerous parts. They use a lathe to construct two types of parts. The "Body" part is used to support the torso of the horse and the "Leg" part is used to support the legs. Each horse sculpture needs 1 Body part and 4 Leg parts. Switching between either of the types of parts requires 25 minutes. Once ready to produce, the lathe produces a Body part in 4 minutes and a single Leg part in 2 minutes. The lathe only makes horse parts. For parts (a)–(d) assume Keuka operates a cyclic schedule in which they make 100 Body parts and then 400 Leg parts.

Suppose Keuka is capacity-constrained. Also, suppose that the process now has an Assembly resource which has 1 worker who is able to assemble a horse sculpture in 16 minutes. This is in addition to the Lathe resource. If Keuka designs a cyclic schedule for the lathe, how many Legs should they make each batch so as to minimize inventory while not constraining the flow through assembly?

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Inventory management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,