please don't take answer from chegg Consider the following pilot samples to construct the mean and range charts. The data below shows the size in CC. Construct the mean and range charts showing all control (action) –upper and lower limits, and warning upper and lower limits. Sample Number Item1 Item2 Item3 Item4 Sample 1 111.9 112.5 112.4 112.7 Sample 2 112.5 112.5 112.4 112.8 Sample 3 112.2 112.8 112.7 112 Sample 4 112.3 112.4 112.8 112.4 Sample 5 112.1 112.8 112.4 111.9 Sample 6 112.6 112.4 112.1 112.3 The following day, 6 samples
* please don't take answer from chegg
Consider the following pilot samples to construct the
Sample Number |
Item1 |
Item2 |
Item3 |
Item4 |
Sample 1 |
111.9 |
112.5 |
112.4 |
112.7 |
Sample 2 |
112.5 |
112.5 |
112.4 |
112.8 |
Sample 3 |
112.2 |
112.8 |
112.7 |
112 |
Sample 4 |
112.3 |
112.4 |
112.8 |
112.4 |
Sample 5 |
112.1 |
112.8 |
112.4 |
111.9 |
Sample 6 |
112.6 |
112.4 |
112.1 |
112.3 |
The following day, 6 samples were taken to check if the process under control or not. Theses samples are as follows:
Sample Number |
Item1 |
Item2 |
Item3 |
Item4 |
Sample 1 |
111.9 |
111.5 |
112.4 |
112.3 |
Sample 2 |
112.5 |
111.5 |
113.4 |
111.8 |
Sample 3 |
112.2 |
111.8 |
111.7 |
112 |
Sample 4 |
114.3 |
111.4 |
111.8 |
113.4 |
Sample 5 |
115.1 |
111.8 |
112.4 |
110.9 |
Sample 6 |
111.6 |
110.4 |
110.1 |
115.3 |
Is the process under control? Why? What actions should you take?
Step by step
Solved in 2 steps with 12 images