Question Two: The laboratory test data for a modified Proctor test and CBR test for (crushed limestone) are given below; Find the CBR value at 95% of MDD after necessary corrections, for the tested sample depending on Iraqi Specifications, R6 (after drawing the curve and stating your answer about which sort of sub-bases materials are used in highway construction? Table 1: CBR test data @56 blows 56 Blows Penetration (mm) 0 0.5 1 1.5 2 25 34 5 75 10 12.5 Load (Kg) 0 15 40 85 140 220 300 455 611 959 1120 1100 Table 2: MDD and CBR values for 10, 25 and 56 blows No. of Blows 10 25 56 MDD, gm/cm³ 1.95 2.07 2.2 CBR% 24 29 ? CBR% at 95% MDD ?

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter19: Design Of Flexible Highway Pavements
Section: Chapter Questions
Problem 4P
icon
Related questions
Question
%CBR According to Iraqi Specification for different layers:
Layers
%CBR (lower limit)
Compacted sub grade
4 %
Sub-Base
30 %
Base
35 %
Transcribed Image Text:%CBR According to Iraqi Specification for different layers: Layers %CBR (lower limit) Compacted sub grade 4 % Sub-Base 30 % Base 35 %
Question Two:
The laboratory test data for a modified Proctor test and CBR test for (crushed
limestone) are given below; Find the CBR value at 95% of MDD after necessary
corrections, for the tested sample depending on Iraqi Specifications, R6 (after
drawing the curve and stating your answer about which sort of sub-bases materials
are used in highway construction?
Table 1: CBR test data @56 blows
56 Blows
0.5 1 15 2.
15 40 85 140 220 300 | 455 611
Penetration(mm)
25-3
5
7.5
10
12.5
Load (Kg)
959
1120
1100
Table 2: MDD and CBR values for 10, 25 and 56 blows
No. of Blows
10
25
56
MDD, gm/cm
1.95
2.07
2.2
CBR%
24
29
CBR% at 95% MDD
Transcribed Image Text:Question Two: The laboratory test data for a modified Proctor test and CBR test for (crushed limestone) are given below; Find the CBR value at 95% of MDD after necessary corrections, for the tested sample depending on Iraqi Specifications, R6 (after drawing the curve and stating your answer about which sort of sub-bases materials are used in highway construction? Table 1: CBR test data @56 blows 56 Blows 0.5 1 15 2. 15 40 85 140 220 300 | 455 611 Penetration(mm) 25-3 5 7.5 10 12.5 Load (Kg) 959 1120 1100 Table 2: MDD and CBR values for 10, 25 and 56 blows No. of Blows 10 25 56 MDD, gm/cm 1.95 2.07 2.2 CBR% 24 29 CBR% at 95% MDD
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Mass and mass related variables in engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning