State at least two essential service providers you needed to gain approval for use on the site before the commencement of work in a construction ‘factory’.
Q: What are the Contents of the Construction Dairy?
A: The record of a construction project where the progress of worksite is made is termed as…
Q: What steps should be taken for a two-phase design-build selection process?
A: Two-Phase Design-Build Selection Procedure is also known as qualifications based source (QBS) and…
Q: In the execution of any project, the contractor's role and responsibility is to: Oa. maintain safety…
A: Explaination : The Contractor has to control the work environment of the project. Contractor makes…
Q: develop a WBS for your assumed building project. Mention duration for each activity of your project…
A:
Q: A contractor enters into a contract to design and build an airport terminal. The contractor is…
A: The correct answer is 3.
Q: ind of back-up site (hot, warm, or cold) would be the best option for a small company that has a…
A: All hot , warm and cold sites offer secure off-site locations that are unaffected by the majority of…
Q: Qsn. Discuss the materials required to construct the building using PET bottles as an construction…
A: Materials Required The construction requires some of the basic materials which ensures a stable,…
Q: What change cannot be undertaken without the contractors consent?
A: Change in a constructor project is defined as any alteration to the scope of work in the form of…
Q: In the application of building permits what are the civil/structural documents needed to submit? (5…
A: There are five 5 important civil/structural documents which are needed for building permit.
Q: You have been instructed by your employer to go to the construction site WITHOUT any training or…
A: If we have been instructed by our employer to go to the construction site WITHOUT any training or…
Q: What three important criteria must a part program satisfy in order to qualify for use in production…
A: Part programming- NC part programming with CAD/CAM is a more advanced kind of computer-assisted part…
Q: What determines the number of draws a builder can make incompleting a facility? What is the existing…
A: Solution: The number of draws a builder can make in completing a facility. The number of draws a…
Q: What are Common Building Defects that building owners usually encounter in the maintenance…
A: Due to ageing and natural deterioration of the building, many common types of defects are found.…
Q: What inspired the owners/proponents and designers to conceive and design such kind of a project and…
A: At Design stage There are plenty of challenges during the design of any High rise building or any…
Q: What are the generally the most important serviceability limit state?
A: Before the answer to the question let's understand the concept well, Limit state of design is a…
Q: Which party to a construction contract normally has primary responsibility for construction safety…
A: Safety is the contractor's liability, although it is not included in the contract.
Q: In a circumstances in a private construction where there are any indications that the work done is…
A: Introduction- Construction- It is the process of planning and management of the construction of…
Q: How can an owner participate in the safety program at the construction project?
A: Involvement of owner in project is very important.
Q: You have been appointed by your company to manage a project involvingconstruction of a small…
A: There would be variations in the WBSs developed by different individuals for a commercial building.…
Q: Classify the under listed instances into the appropriate types of contracts. a. A standard form of…
A: Where Particular Conditions can be used, FIDIC contracts provide guidelines on project-specific…
Q: teristics and design selection
A: Protection from the elements, such as wind and rain, as well as curious spectators, are all common…
Q: 1) What is the importance of acquiring an FSIC for a building
A: There are following advantages of acquiring FSIC ( Fire Safety Inspection Certificate) for a…
Q: What types of equipment are used for building maintenance?
A: There different equipment's used for the building maintenance like free standing and the build in…
Q: General Contractors working an a project that requires several months to complete typically request…
A: Solution: The answer is Option G, ALL OF THE ABOVE
Q: Your company, a G7 contractor is appointed as main contractor for construction of a new recreational…
A: Hi there!This question should is opinion based and we cannot provide solution for just…
Q: Is the Resident Project Representative responsible to see that temporary facilities under the…
A: The resident project representative responsibility is to evaluate all the plans and specification of…
Q: uctability
A:
Q: How much authority should be allowed to the Resident Project Representative or inspector—should he…
A: The resident project representative or inspector responsibility is to evaluate all the plans and…
Q: What are the temporary facilities provided by the Contractor?
A: Contractor's responsibilities are not only related with the completion of the construction project…
Q: What measures are taken by the Resident Project Representative for construction safety?
A: A resident project representative is a person who presents thorough on-site investigations to…
Q: What type of information is included in Construction Dairy?
A: The Construction diary is a record of all the worksite progression of the construction project as…
Q: When there are questions by the general contractor to the Inspector, the Inspector should: resolve…
A: When there are questions by the general contractor to the Inspector, the Inspector should resolve…
Q: A civil engineer has 2 alternative designs for a house. Both designs involve the acquisition of a…
A: Given data: Design 1: 5 men each costing 200 per day duration = 4 months Design 2: 10 men each…
Q: Describe the kind of risk involved, if any, where the engineer,the inspector, or the Resident…
A: In a construction contract there are various risks, some are given below: Logistical risks Socio…
Q: True or false? If requested by the contractor, the Resident Project Representative or inspector may…
A: The resident project representative or inspector responsibility is to evaluate all the plans and…
Q: Why should the contractor work within or adjacent to Navigable Waterways?
A: Contractor work within or adjacent to Navigable Waterways because there are many rules and…
Q: What are the major ITER buildings? Select one: A.Tokamak Building B.Radio Frequency Building…
A: ITER buildings are International Thermonuclear Experimental Reactor Buildings. It gave importance to…
Q: If the employer gives instructions on site directly to the contractor, must the principal…
A: Of course, the contractor is not interested in the work content of the architect. Assuming that the…
Q: A contractor enters into a contract to design and build an airport terminal. The contractor is…
A: The contractor would like to account for the only design and build contract as a single performance…
Q: Describe the four types of information documented in the daily construction report?
A: A daily construction report is defined as a report that includes all kinds of information done on a…
Q: each persons under the Construction (Design and Management) Regulations: (a) The client (b) The…
A: THESE 3 ARE VERY IMPORTANT ROLES TO CARRY IN CONSTRUCTION WORK
Q: What responsibilities does a contractor have for the integrity of the new building structure?
A: The integrity of the new building structure is the ability of a structure to resist the expected…
Q: Give three examples of benefits that may be achieved by implementing BIM on a construction project.
A: There are several examples of benefits of implementing BIM in construction project some of them are…
State at least two essential service providers you needed to gain approval for use
on the site before the commencement of work in a construction ‘factory’.
Step by step
Solved in 2 steps
- Provide a situation and apply the six design standard phases of a construction project.Task 8- high rise building steps on how to build a high rise buildings. ( from rawland)Qsn. Discuss the materials required to construct the building using PET bottles as an construction unit .Please don't solve wrong , will dislike
- Explain the following statement:The LBSR project was a self-certified project.True or false? The inspector has no interest in the manner or location of storage of construction materials delivered and stored at the site.the project constructor and all contractors must establish a ___________ program for excellence for by individuals, teams, or contractors.
- Which of the following would probably NOT be included in an agreement for preconstruction services between an owner and a contractor? Analysis of owner financing Constructability Cost and schedule estimating Value engineering Site logistics planningWhich party to a construction contract normally has primary responsibility for construction safety unless otherwise covered under the contract: the owner, theengineer/architect, or the contractor?Why are two inspections required to close out the project?
- the client request a recommendation of a contractor from the licensee the license has an obligation to recommend A. Three reputable contractors B. The least expensive contractor C. At least three bids for the work to be performed D. A licensed home improvement contractorWhat change cannot be undertaken without the contractors consent?At the time of the issuance of a Certificate of Substantial Completion by the Architect of Record, an Owner likely may begin moving into their facility; they may move in furniture, supplies, equipment, etc.with the approval of the Building Inspector - but may not yet move people in to conduct business. True False