Task 3: 100 trailers of a specific model are required by Sask Trailers to meet the demand at the beginning of week 6. A trailer requires one bed and one chassis subassembly. A chassis subassembly requires one frame, two axles and four wheels. 10 chassis subassemblies (complete), 80 frames, 80 axles, and 400 wheels are available in inventory. 40 Axles are scheduled to arrive in week 2. The purchase lead time for frames, axles, wheels, and beds is two weeks. Any quantity of chassis between 50 to 100 will require one week to assemble, and 100 trailers will require 2 weeks to assemble. Using the given tables, prepare the material requirements plan for axles. Axles can only be acquired in multiples of 40 units.

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
Chassis (1)
LT = 1 wk.
Gross requirements
Beg.
Inv.
3 4
2
6.
Scheduled receipts
Projected on hand
10
Net requirements
Planned-order receipts
Planned-order releases
Axle (2)
LT = 2 wk.
Gross requirements
Beg.
4 5 6
1
2
Inv.
Scheduled receipts
Projected on hand
80
Net requirements
Planned-order receipts
Planned-order releases
3.
Transcribed Image Text:Chassis (1) LT = 1 wk. Gross requirements Beg. Inv. 3 4 2 6. Scheduled receipts Projected on hand 10 Net requirements Planned-order receipts Planned-order releases Axle (2) LT = 2 wk. Gross requirements Beg. 4 5 6 1 2 Inv. Scheduled receipts Projected on hand 80 Net requirements Planned-order receipts Planned-order releases 3.
Task 3:
100 trailers of a specific model are required by Sask Trailers to meet the demand at the beginning of
week 6. A trailer requires one bed and one chassis subassembly. A chassis subassembly requires one
frame, two axles and four wheels.
10 chassis subassemblies (complete), 80 frames, 80 axles, and 400 wheels are available in inventory.
40 Axles are scheduled to arrive in week 2. The purchase lead time for frames, axles, wheels, and beds
is two weeks. Any quantity of chassis between 50 to 100 will require one week to assemble, and 100
trailers will require 2 weeks to assemble. Using the given tables, prepare the material requirements
plan for axles. Axles can only be acquired in multiples of 40 units.
w www
Trailer
Chassis
Bed (1)
Assembly (1)
Frame (1)
Axle (2)
Wheel (4)
Beg.
5 6
Production
Week
1
Inv.
3
4
Schedule
Quantity
100
Trailers
Beg.
Inv.
3
LT = 2 wks.
Gross requirements
100
Scheduled receipts
Projected on hand
Net requirements
Planned-order receipts
Planned-order releases
Transcribed Image Text:Task 3: 100 trailers of a specific model are required by Sask Trailers to meet the demand at the beginning of week 6. A trailer requires one bed and one chassis subassembly. A chassis subassembly requires one frame, two axles and four wheels. 10 chassis subassemblies (complete), 80 frames, 80 axles, and 400 wheels are available in inventory. 40 Axles are scheduled to arrive in week 2. The purchase lead time for frames, axles, wheels, and beds is two weeks. Any quantity of chassis between 50 to 100 will require one week to assemble, and 100 trailers will require 2 weeks to assemble. Using the given tables, prepare the material requirements plan for axles. Axles can only be acquired in multiples of 40 units. w www Trailer Chassis Bed (1) Assembly (1) Frame (1) Axle (2) Wheel (4) Beg. 5 6 Production Week 1 Inv. 3 4 Schedule Quantity 100 Trailers Beg. Inv. 3 LT = 2 wks. Gross requirements 100 Scheduled receipts Projected on hand Net requirements Planned-order receipts Planned-order releases
Expert Solution
steps

Step by step

Solved in 4 steps with 3 images

Blurred answer
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.