Q: In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 11.5…
A: Given, Waiting time before the start of the batch = 2 hours Setup time = 2 hours Waiting time for…
Q: 1.- Quantity of production volume to be produced considering its SCRAP 2.- Quantity of production…
A: Here, given that for this operation process, we would produce 5000 units final volume per month,…
Q: In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 12.75…
A: Find the given details below: Given details: Flow time 12.75 hours Waiting time before…
Q: Drivers are trained in a process with two resources (workers in each resource work independently).…
A: Given that: Drivers are trained in a number of processes = 2 Processing time of the first resource =…
Q: An automated car wash serves customers with the following serial process: pre-treat,wash, rinse,…
A: Flow rate of the process is also regarded as the throughput and it is defined as the number of flow…
Q: During the campus Spring Fling, the bumper car amusement attraction has a problem of cars becoming…
A: Consider the given information: Hiring cost = $20 per hour Repair Time for one personnel = 30…
Q: Justify why neither approach would work 100% of the time and the benefit of adjusting the server…
A: To be determined: Justify why neither approach would work 100% of the time and the benefit of…
Q: A staff assistant at NUBD Corporation recently determined that the first four units completed in a…
A: Total hours for 16 units=16*250*(1-0.25)*(1-0.25) = 2250
Q: Drivers are trained in a process with two resources. A worker in the first resource trains 0.028…
A: Given data For the first resource Total number of workers = 4 workers A worker trains a driver in…
Q: A machine used for cutting materials in a factory has the following outputs per hour at various…
A: Given data is Output by speed A = 200 pieces every 8 hours Output by speed B = 280 pieces every 5…
Q: . A small, privately owned Asian company is producing a private-label soft drink calledYoggo. A…
A: Given information Process step Number of Machines Second per Bottle Bottling 1 1 Apply a…
Q: The local driver's license center processes applications for driver's license renewals through the…
A: Time taken for Step-1 = 3 minutes per customer No. of resources = 1 receptionist Time taken for…
Q: Calculate the manufacturing lead time if the average non-operation time is 2 hrs. Calculate the…
A: In manufacturing, lead time refers to the time that it takes to manufacture a product and deliver it…
Q: A young mechanical engineer devised two different approaches to completing a production task. Both…
A: Method Method A Method B Cost of one worker 30 per hour 35 per hour Number of workers 3 2 Cost…
Q: You observe a bank and notice that a customer leaves the bank about every five minutes.These five…
A: Cycle Time is the time taken by an individual unit under the process. Cycle time can always be…
Q: The local driver's license center processes applications for driver's license renewals through the…
A: “Since you have posted a question with multiple sub-parts, we will solve the first three sub-parts…
Q: An automobile manufacturer is considering a change in an assembly line that should save money by…
A: Interest and cost of capital is not given, further no other information is given regarding…
Q: During the campus Spring Fling, the bumper car amusement attraction has a problem of cars becoming…
A: 20 per hour , 10 per half an hour, 5 per 15 minute. 15 min : $5 : : 5 min : $ 0.66 Hourly…
Q: A large-scale bakery is laying out a new production process for its packaged bread, which it sells…
A: To bake a bread it requires= 11 min In 1 hour there can be number of shifts= 60/11=5.45 In each…
Q: Consider a production line with five stations. Station 1 can produce a unit in 8 minutes. Station 2…
A: This question is related to the topic-Production Management and this topic falls under the…
Q: A manufacturing company has a small production line dedicated to the production of a particular…
A: Given data is Station Output Station 1 2700 Station 2 2500 Station 3 2300 Station 4 2100
Q: A Printed Circuit Board (PCB) machine installs integrated circuits onto a board. Before starting to…
A: Given: Setup time = 16min Processing time = 0.19min/board
Q: In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 16.65…
A: Given, Flow time in minutes = 16.65 hours * 60 minutes = 999 minutes Value added time = 1 minute +…
Q: A process includes 9 tasks and there are 3 workers. Each task can be assigned to only one worker and…
A: It is commonly represented in "hours" and refers to the output capacity of employees or machinery.…
Q: During the campus Spring Fling, the bumper car amusement attraction has a problem of cars becoming…
A: given data,* rate = $ 15 per hour*one repair can fix in average time = 40 minutes*two repairs = 30…
Q: Digos Mineral Inc. is in water refilling. The following information pertains to its operations…
A: Given data is Processing time = 40 minutes Inspection time = 7.5 minutes Waiting time = 7.5 minutes…
Q: A manufacturing company has a small production line dedicated to the production of a particular…
A: Operation management in an organization aims at providing the highest efficiency possible. It…
Q: Consider a production line with five stations. Station 1 can produce a unit in 10 minutes. Station 2…
A: The bottleneck is a situation that often occurs in the production processes of the manufacturing…
Q: A final assembly plant for a certain automobile model is to have a capacity of 240,000 units…
A: Data Given Annual production = 240,000 unit Operating time(t) = (50 week/yr * 5 days/week * 8…
Q: A company that makes shopping carts for supermarkets and other stores recently purchased some new…
A: Productivity = Output / Input labor productivity under the old system = 100 / 5 = 20 carts per…
Q: It takes Carissa 45 minutes to finish a 60-ietm test in math. At this rate, how many minutes will it…
A: Arithmetic operations include addition, subtraction, multiplication, and decision as well as percent…
Q: Consider a process consisting of five resources that are operated 8 hours per day. The process works…
A: Given data Number of operating hours = 8 hours per day Demand for Product A = 40 units per day…
Q: A process includes 9 tasks and there are 3 workers. Each task can be assigned to only one worker and…
A: Since there are three workers, therefore they must be working at three workstations, and consecutive…
Q: A production line has three stations and the first station can process a unit in 10 minutes. The…
A: The capacity of any process is determined by its slowest resource and is measured in units per time.…
Q: Consider the flow in Figure 7–1 but assume that no patients require follow-upappointments. All…
A: The capacity of the resources in the hospital can be calculated by identifying the total patients…
Q: At a cruise ship terminal, each day on average 1000 passengers embark on ships. Onaverage,…
A: Given Information: Number of passengers embark on ships daily = 1000 passengers per day Time spent…
Q: A veterinary office with three processes (examination, greeting, and checkout) has two types of…
A: Below is the solution:-
Q: Drivers are trained in a process with two resources. The processing times for the resources are 32…
A: The implied utilization informs us how much resource is being utilized according to the customer…
Q: The Cove is a midsized furniture store. Sales staff are assigned standard shifts (1st shift usually…
A:
Q: There are 3 servers in the checkout area. The interarrival time of customers is 2 minutes. The…
A: The normal circle back of giving customer service is vital to any service-situated business.…
Q: A process includes 9 tasks and there are 3 workers. Each task can be assigned to only one worker and…
A: Given data is Number of tasks = 9 Number of workers = 3 Task Processing time 1 60 2 70 3 25…
Q: Does increasing the capacity of a resource ever increase the arrival rate to the resource group that…
A: Increasing the ability of resources often improves the flow of the operation. By increasing power,…
Q: The bottleneck resource in a process has the least idle time. True or false?a. Trueb. False
A: The bottleneck resource in a process has the least idle time.
Q: To find the bottleneck in a process with attrition loss, all we need to do is find theresource with…
A: The right option is B. False. The bottleneck is characterized as the cycle step (station) in the…
Q: A machine operates with the following production cycle: 15 minutes of setup,45 minutes of…
A: The capacity of the machine refers to the ability of the firm to produce goods in a fixed interval…
Q: In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 14.35…
A:
Q: For a particular process, suppose the bottleneck cycle time is 40, and the raw processing time is…
A: The Process Cycle Efficiency, in some cases alluded to as the Value Added Ratio, is an estimation of…
There is a manufacturing company that has a dedicated production line to make one specific product. The line has three stations working in serial. Inputs arrive at station 1 and the output from station 1 becomes the input to station 2. The output from station 2 is the input to station 3. The output from station 3 is the finished product. Station 1 can process 500 units per week, station 2 can process 300 units per week, and station 3 can process 400 units per week.
illustrates this problem.
Question |
Answer ↓ |
What is the maximum output number per week? |
|
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- A manufacturing company has a small production line dedicated to the production of a particular product. The line has four stations in serial. Inputs arrive at station 1 and the output from station 1 becomes the input to station 2. The output from station 2 is the input to station 3 and so on. The output from station 4 is the finished product. Station 1 can process 2,700 units per month, station 2 can process 2,500/month, station 3 can process 2,300/month, and station 4 can process 2,100/month. What station sets the maximum possible output from this system? What is that maximum output number?A manufacturing company has a small production line dedicated to the production of a particular product. The line has four stations in serial. Inputs arrive at station 1 and the output from station 1 becomes the input to station 2. The output from station 2 is the input to station 3 and so on. The output from station 4 is the i nished product. Station 1 can process 2,700 units per month, station 2 can process 2,500/month, station 3 can process 2,300/month, and station 4 can process 2,100/month. What station sets the maximum possible output from this system? What is that maximum output number?Consider a production line with five stations. Station 1 can produce a unit in 10 minutes. Station 2 can produce a unit in 9 minutes. Station 3 has two identical machines, each of which can process a unit in 14 minutes (each unit only needs to be processed on one of the two machines. Station 4 can produce a unit in 5 minutes. Station 5 can produce a unit in 8 minutes. Which station is the bottleneck station?
- A manufacturing company produces 10,000 products per year (50 weeks per year is the available time). The average processing time of each product is 3 weeks. How many products are being processed (on an average) at any given point? What is the average pace of the line (time between two consecutive outputs)?Consider the following two production processes making an electronic component for a navigation system. Both processes consist of 20 stations and operate at a cycletime of 1 minute/unit. Their most error-prone operation is step 9:• Process 1 has a final inspection at the end of the process and has about 300 units of inventory between step 9 and the inspection.• Process 2 has each worker check the work of the previous steps and about 50 units ofinventory between step 9 and the end of the process, roughly equally distributed across theremainder of the process.What would be the information turnaround time for a defect made at station 9?Before completing production, a product must passthrough three stages of production. On the average, a newproduct begins at stage 1 every 6 minutes. The average timeit takes to process the product at each stage is as follows:stage 1, 3 minutes; stage 2, 2 minutes; stage 3, 1 minute.After finishing at stage 3, the product is inspected (assumethis takes no time). Ten percent of the final products arefound to have a defective part and must return to stage 1 andgo through the entire system again. After completing stage3, 20% of the final products are found to be defective. Theymust return to stage 2 and pass through 2 and 3 again. Onthe average, how many jobs are in the system? Assume thatall interarrival times and service times are exponential andthat each stage consists of a single server.
- There are 3 servers in the checkout area. The interarrival time of customers is 2 minutes. The processing time is 5 minutes. The coefficients of variation for the arrival process and the service process are 1 and 0.85 respectively. What will be the impact on the average number of customers in service if one more server is added? Multiple Choice Remains the same at 2.5 Increases from 1.25 to 2.5 Decreases from 2.5 to 1.25 Remains the same at 1.25An order for 200 units of a product is processed on work centers A and B. The set up time on A is 45 minutes and the run time is 5 minutes per piece. The set up time on B is 40 minutes and the run time is 8 minutes per piece. The wait time between the two operations is 2 hours. The move time between A and B is 15 minutes. Wait time after operation B is 1 hour and the move time into stores is 50 minutes. There is no queue at either work station. Calculate the total manufacturing lead time for the order.A serial process has 5 steps – A (4), B(5), C(2), D(6), and E(3) – that have to be performed in this order. The numbers in parentheses are the times (in minutes) needed to process a unit. For each unit produced by this process, the process has a total idle time of: Group of answer choices 1 min 10 mins 6 mins 3 mins
- A company producing a standard line and a deluxe line of dishwashers has the following time requirements (in minutes) in departments where either model can be processed. Standard Deluxe Stamping 3 6 Motor Installation 10 10 Wiring 10 15 The standard models contribute $20 each and the deluxe $30 each to profits. Because the company produces other items that share resources used to make the dishwashers, the stamping machine is available only 30 minutes per hour, on average. The motor installation production line has 60 minutes available each hour. There are two lines for wiring, so the time availability is 90 minutes per hour. Write the formulation for this linear program. What are the optimal daily production quantities of each product and the optimal daily profit?Consider a production line with five stations in serial. The stations have the following process times in minutes (or minutes/unit). Station 1's process time is 9 minutes/unit. Station 2's process time is 10 minutes/unit. Station three has two identical machines, each of which process a unit in 12 minutes (each unit only needs to be processed on one of the two machines). Station 4's process time is 5 minutes/unit. Station 5's process time is 8 minutes/unit. Which station is the bottleneck station? a) Station 3 b) None of the other options c) Station 2 d) Station 5The manager of the Personnel Department at City Enterprises has been reading about time-driven ABC and wants to apply it to her department. She has identified four basic activities her employees spend most of the their time on: Interviewing, Hiring, Assessment, and Separation Processing. The department employs 5 staff who perform these activities. The manager provides the following estimates for the amount of time it takes to complete each of these activities: Interviewing: 45 minutes. Hiring: 60 minutes. Assessment: 75 minutes. Separation Processing: 90 minutes. Employees in Personnel work 35-hour weeks with four weeks for vacation. Of the 35 hours, five are reserved for administrative tasks, training, and so on. The costs of the Personnel Department, including any allocated costs from other staff functions, are $972,000. During the year, Personnel conducted 1,200 interviews, made 375 hires, made 3,000 assessments, and had 250 separations. The manager of the Personnel…