Construction Essay

Sort By:
Page 9 of 50 - About 500 essays
  • Better Essays

    Scenario During the construction of panjagutta flyover sudden collapsion of flyover took place on 9th September year 2007.A flyover under construction at panjagutta has collapsed leaving 15 people dead, there was no particular reasons founds for the sudden collapsion of panjagutta flyover. It is still uncertain if the incident happened because lack of quantity in the recently undertaken works, lack of safety measures or due to heavy rains occurred. The foundation stone construction of the bridge was

    • 3584 Words
    • 15 Pages
    Better Essays
  • Good Essays

    Introductions Time and cost are two critical objectives of construction project managements, are not independent but intricately related. It is generally realized that when project duration is compressed, the project will call for an increase in labor and more productive equipment, and require more demanding procurement and construction management, and then the cost will increase. In this chapter, the definition of planning for a construction project is given and the various types of planning are described

    • 1802 Words
    • 8 Pages
    Good Essays
  • Better Essays

    Title : The Agenda for Change in Construction Summary: The study of New British Library and B.P’s Andrews field development had different approaches in the way the construction was planned. The two projects started their construction work at the same time and had same financial status. Although both the projects was constructed on same time, the New British library was the failure due to the over budget and lack of management leading to many delays during the construction.In the project they did

    • 1587 Words
    • 7 Pages
    Better Essays
  • Good Essays

    roadside construction sites occur at night to reduce the problems of traffic. These sites have continually shown problems caused by their unnatural lighting solutions. The essential problem brought to attention is that of safety, caused by the poor vision, bright lights, shadows, and the glare created by the current lighting types being used. While looking at these different forms of lighting, one will be able to see and understand which the best permanent solution for roadside construction is. Portable

    • 1330 Words
    • 6 Pages
    Good Essays
  • Decent Essays

    • The self-weight of the structure; • Vehicle weights; • Horizontal vehicle loads, such as those due to braking, centrifugal force, or horizontal surging effects in some vehicles; • Dynamic vertical loads, caused by dynamic interaction between primary service vehicles and the bridge, and influenced by such factors as road roughness and vehicle suspension characteristics; • The weight of pedestrians; • Loads applied by vehicles or pedestrians to railings and kerbs [curbs]; • Stream loads on the

    • 1980 Words
    • 8 Pages
    Decent Essays
  • Better Essays

    CHAPTER 1 INTRODUCTION 1.1 BACKGROUND OF STUDY In this modern world, the technology has risen along with many kinds of inventions and creations which have been created, of course by the inventors. The construction industry has also growing hastily along with the global socialization such as the increasing number of populations in this worldwide. Figure 1.1 : Chart of Annual Population Growth Rate Year 2010 – 2040, Malaysia Source: Department of Statistics, Malaysia Thus, the development

    • 1669 Words
    • 7 Pages
    Better Essays
  • Better Essays

    Introduction The CDM regulations were put in place to help improve the overall safety of construction sites. Systems were put in place to help eliminate hazards from as early as the design process whilst effectively communicating and cooperating throughout the lifetime of the job. In 2015 details had been updated and changed from the 2007 regulations that will be explored later in this report. Also covered in this report is the Lofstedt review which explores the 2007 CDM Regulations discovering

    • 1126 Words
    • 5 Pages
    Better Essays
  • Decent Essays

    The Sharon Construction Corporation has been awarded a contract for the construction of a 20,000-seat stadium. The construction must start by February 15 and be completed within one year. A penalty clause of $15,000 per week of delay beyond February 15 of next year is written into the contract. Jim Brown, the president of the company, called a planning meeting. In the meeting he expressed great satisfaction at obtaining the contract and revealed that the company could net as much as $300

    • 868 Words
    • 4 Pages
    Decent Essays
  • Decent Essays

    Construction Case Study

    • 858 Words
    • 4 Pages

    City Staff Member: This Early Zoning Assistance and Infrastructure Bureaus Meeting request is being submitted to discuss a potential project located at the Oregon Humane Society (OHS) property. The potential project involves the construction of a new building on the subject site. Currently, a +/- 25,000 square foot building with a +/- 6,500 square foot attached canopy is being considered. The additional space would provide for a commercial tire installation and sales facility as well as related

    • 858 Words
    • 4 Pages
    Decent Essays
  • Decent Essays

    Having classified the site and selected the footing and wall types based on the topography and house design, the footing system requirements can be obtained from the figures referred to in AS 2870 Clause 3.1 and 3.2. This includes the slab and beam dimensions, beam spacing and reinforcement requirements. According to Cement Concrete & Aggregates Australia (2003) “A stiffened raft consists of a concrete slab on ground stiffened by integral edge beams and a grid of internal beams. The floor slab is

    • 965 Words
    • 4 Pages
    Decent Essays