Power station

Sort By:
Page 4 of 50 - About 500 essays
  • Better Essays

    facility:- Power station is on Tanda-Faizabad also connected to Akbarpur-Faizabad. Nearest railway station 13km far (surapur). Akbarpur is situated on Lucknow–mughalsarai Railway track. The distance of plant from Akbarpur is 30km. Tanda town is about 8km far from plant. Production & Transmission:- The 4*110MW power electricity is produced at the station using four different units. Each unit generates 110MW power. The arrangement of each unit is same. Since it is a thermal power plant, coal

    • 13062 Words
    • 53 Pages
    Better Essays
  • Better Essays

    mixed and non-mixed flagship condominium developments, health care and retail, as well as, heavy civil projects including gravity sewer, pressure sewer, potable water systems, storm water stabilization ponds, water/waste water treatment facilities and power generation, specifically pressurized heavy water nuclear reactors – Canada Deuterium Uranium (CANDU) technology. My propensity to adapt quickly, perform rapid problem solving, ability to communicate effectively with clients, organize and deliver projects

    • 5062 Words
    • 21 Pages
    Better Essays
  • Good Essays

    “Energy and Efficiency analysis of 210MWe coal base Thermal Power Plant with running parameters” Goutam Khankari,DVC,Kolkata.  INTRODUCTION Power projects are essentially capital intensive. Not only they involve a highly initial cost which is around Rs. 4.5 to 5.0 crores per MW for coal-based plants but also huge operation cost. The running expenses of a 210MW thermal power station may range around thirty crores every month and usually about 80% of this goes towards the fuel cost. Not only fuel

    • 4682 Words
    • 19 Pages
    Good Essays
  • Decent Essays

    The Three Gorges Dam, the world’s largest power station, is a hydroelectric dam that distances the Yangtze River located in China. Dams could be built for many reasons, including flood control, irrigation, and sedimentation control. Construction for the dam started in 1992 after many repeated discussions and arguments took place. The Chinese people are keeping a close watch on the Three Gorges Dam, and many people in other countries are keeping an eye on it as well. Unfortunately, with a project

    • 896 Words
    • 4 Pages
    Decent Essays
  • Best Essays

    Sayano-shushenkaya Hydroelectric Power Station Disaster 1.Introduction 1.1.Brief Dam Description Sayano-Shushenskaya Hydroelectric Power Station was biggest hydroelectric power station ever built in Russia history, and also the sixth biggest in the worth, which is located on the Yenisei River, near Sayanogorsk in Khakassia.[3]The plant operated ten hydro turbines, made total 6,400 MW of output, average annual produced 23.5 TWH,which peaked in 2006 at 26.8TWH. Its arch gravity

    • 2802 Words
    • 12 Pages
    Best Essays
  • Decent Essays

    Recycling the waste or converting the waste is very crucial, waste to value is one of the leading cures to help the country economically and environmentally. Leaving the rubbish unattended will release harmful gases thus we have to take an action and think out of the box and think of a way to use the waste and convert it to a beneficial product creating a closed circle with no waste to concern about. Speaking of green economy, ones should find products or food only supplied by his country, reason

    • 721 Words
    • 3 Pages
    Decent Essays
  • Good Essays

    Critial analysis of Tate Digital Strategy 2013-15. Introduction As one of the most excellent British modern museums, Tate Modern ran several digital strategies aim to creat incomes and build interactive communication with their audice. In that process, Tate proved how important that digital communication offered to museum to create and nurture an engaged arts community and to maximise the associated revenue opportunities. In the three years, Tate Modern had improvement on their incomes, however

    • 1050 Words
    • 5 Pages
    Good Essays
  • Good Essays

    The Use of Coal for Power Should Continue

    • 1977 Words
    • 8 Pages
    • 15 Works Cited

    wind energy, hydraulic power and so on (Fossil Fuels Used to Generate Electricity Power Plant Emissions of North America). According to the statistics by the U.S. Energy Information Administration in 2009, the usage of coal was still the largest source to generate the power. Sources of electricity in the United States were generated by 44.9% of coal, 20.3% of nuclear, 23.4% of natural gas, 1% of petroleum, 6.9% of hydroelectric conventional and 3.6% of others (Electric Power Monthly with Data for

    • 1977 Words
    • 8 Pages
    • 15 Works Cited
    Good Essays
  • Decent Essays

    PROJECT TITLE: TRAINING NEED ANALYSIS AND EVALUATING TRAINING EFFECTIVENESS AT BHEL, HARIDWAR OBJECTIVES: • To assess how the organizational objectives will be realized through the delivery of a staff training programme that will focus on improved and/or changed skills, knowledge and/or attitudes of those directly involved or affected by the ‘change’ • To understand the process and importance of measuring training effectiveness in the organization • To measure the expressed needs of training

    • 13780 Words
    • 56 Pages
    Decent Essays
  • Decent Essays

    prepared to do what is necessary to help in the evacuation process. While we (the military) have 29 bases in the region several of our largest bases are in close proximity to the blast and could be/ are in habitable and inoperable. Camp/ Marine Air station Pendleton are both in such a close proximity that it is in operable, inhabitable, and for all

    • 979 Words
    • 4 Pages
    Decent Essays