2.1.3 Issues of the Management Industrialised Building System.
2.1.3.1 Cost in management
The processed for installation the structure of industrialised building system (IBS) requires high initial investment capital for pre-casters to purchase new machinery, mould, importing foreign technology and wages of skilled worker. (hazreeni,azam, 2010). In the process, by using the conventional method of construction the project is a first choice from many small contractors are reluctant to adopt IBS system. It may the small contrctor was using conventional method compared the new method. (Kamar, Alshnawi, and hamid, 1779). It may financial issues become the main obstacle for small contractors to move forward with the IBS system (Kamar, Alshnawi,
…show more content…
The cost for machinery in setting up the machine is very high initial cost, included manufacturing plant as well as the cost of transportation has reduced the margin of profit (Baharudin, Wahid, 2006). However, IBS has demonstrated that the savings in the construction time is able to compensate the higher construction cost incurred (Baharudin, Wahid, 2006).
2.1.3.4 Design Structure of IBS
The design of IBS will give a good and bad effect to industrial construction. The design of structure should be follow the specification of the structure and conditon of site. IBS requires more coherent structure of process planning and control from start to end of the project in order to reach the goals and reduce defect and errors (hazreeni,azam, 2010). Based on the previous research, that the term IBS is often misinterpreted with negative image due to its past failures and unattractive architecture (hazreeni,azam, 2010).
2.1.3.4 Capability of IBS structure in Malaysia
The construction industry in Malaysia have a good thing and also bad thing. It refer to the experience the construction management in construction industry. It may encourage the capability of the structure construction industry. The Industrialised Building System (IBS) in Malaysia, the construction industry plays a significant role in a progressive country by working together with other industries, such as materials manufacturing and
All parties of construction project will benefit from IPD. The integrated process required more participants' involvement at early stage, because the IPD structure will recognize the compensation and reward at early involvement. The compensation will be based on adding value to the project and it will rewards what's the best for the project instead of individual benefit. For example providing incentives tied to achieving project objectives and goals. The concept is to use innovative business models to enhance collaboration and efficiency.
Over the past few years, the construction industry has been changing dramatically. One of the most important stages in the construction management and business management is the planning phase. They share similar two main levels of planning which are the strategic and operational planning. However, business management planning to decide in advance what should be done, and how to do it, when you do and you are done. On the other hand, Construction management strategic planning is to deal with selection on a high level of overall objective of the project, including the scope, procurement methods, schedules and financing options but the planning of operations, including the
There are top 25 works can be done by BIM in Construction Industry and every BIM use has different frequency and benefit. The works done by using BIM in construction industry are as follows:
In my opinion, this way would not be a good way to determine the benefits of BIM when compared to the other two researches because, in this case, the response level was observed as 70%, and the others were case studies, which means they have been already implemented in the field on the site of construction. Two projects were selected where one of it followed BIM techniques and the other didn’t right from the beginning of construction. And from the literature review it is observed that the projects followed Integrated Project Delivery method where the planning starts from the pre construction phase of the project, and this project delivery method is the efficient way of project delivery method since all the teams will be coordinated much before the pre construction phase of the project. The case study presented in the first paper was based on owner's perspective and had less visibility to the contractor or designer. Apart from this, some of the data available was historical, thus an ideal state would be proper tracking of metrics by the team while
Many people around the entire world do not possess the knowledge of the different types of constructions and if there is a specific reason this construction are made in certain way or area of the world. Construction is more complex than just building an infrastructure or a facility. It takes planning, land property inspection, design, in numerous occasion financing and the process ends once the project is built and ready for use.
In most of the cases, when it comes to implementing a business idea into reality then hiring a construction contractor becomes an essential need. However, we also cannot hire any commercial builder for the task because this is not an investment that we make every day since it involves a lot of money where we do not want to take any risk. In that case, hiring the best construction agency is very important so that we are going to get a quality and productive result in the end.
The last respondents that involved in this study is a local authority .It stated that need skilled worker is a main disadvantages of IBS system. Construction that use IBS system require the expertise of worker to avoid problem in the future. The other disadvantages is a lack of research, need heavy machineries, lack attractive design, high initial cost, problem of join, site accessibility and lastly large working
However, implementation of IBS has not found popular from local construction industry. There is very low profile of construction sector using IBS as their main building construction.
Contractors want perfect models; what they want and what we are contracted to do are different
The design and construction of buildings can be a complicated business involving different professions, contractors, sub-contractors and operatives. This type of work is varied and employs many construction personnel with different roles and responsibilities, working together to complete a project in as successful way- on time, on budget and to the right specification. A large project would involve a great number of different activities:
The construction industry is a major contributor to the world wide. The long term objectives of any
The good news is, the contractor will endeavor to complete the project more quickly and in a timely manner. This type of contract has been adopted in many previous projects. Then, bidding analysis and selection process is relatively easily. It was also easier to plan and execute all the work relating mainly in determining the quality and quantity of the project itself.
The construction industry like many other industries has changed and evolved with time. It is the fourth largest contributor to Australia’s GDP and has played a major role in determining economic growth of the country. In terms of employment, the industry has employed 9% of the Australian workforce making it the fourth largest industry (ABS data).
|growth in quantum of laborers required has declined from 1.6% in FY 04 to 0.9%|
Additionally, engineering program curriculum of the 10 universities, mentioned previously, are also researched in order to find out whether their engineering programs have any cooperation courses for BIM education. In engineering program, BIM is able to apply on administration of construction process, integrated design delivery project, construction management, structural analysis, and costing construction, and it has many other related subjects which is able to applied indirectly. However, only 2 universities have BIM course, and 1 university is planning to apply into the engineering program curriculum among the previously mentioned 10 university. According to the Universities’ engineering program curriculum, their major goal of the courses is that students have effective architectural digital design skill and flexibly responding technique to the design changes during the project. Moreover, during the courses, student can understand how data or information of architectural design is shared with construction by computer science and digital technology in design and construction phase. Therefore, according to the researches in terms of BIM course in architecture and