1. The Health and Safety Plan for the decommissioning of existing plant equipment and installation of new plant equipment. Principal Contractor Principal Designer Client CDM Standards and Objectives for the Project Safety Standards and Objectives for the Project The Principal Contractor Site Safety Policy Statement 2. Summary Project Information Project Name Project Address Project Duration of works Description and Scope of Works Form of Contract Existing Environment Previous / Current Land and Plant Use Surrounding Area Existing Services Existing Structures Existing Plant Equipment Ground Conditions Existing Traffic Systems 3. Management Team Organisation and Responsibilities Management Team Function Project Organisation and…show more content…
endixes should contain the following; Site Layout Site Specific Safety Induction (including site rules) Notification of Project Fire Safety Plan Emergency Procedures Project Programme Plan Design Plan Types of documents, records and general forms to be included; Access Equipment Inspection Record Forklift Truck Checklist Induction Aid Training Record Risk Assessments, safe systems of work and method statements Control of Substances Hazardous to Health and COSHH Assessments Personal Protective Equipment Issue Workplace Inspection Form Contractor Approval Questionnaire Contractor Control Documents and Records; Construction Site Inspection Checklist (Builder) Construction Site Inspection Checklist (Electrical) Contractor (Sub) Approval Questionnaire Contractor (Sub) Control Document Excavation Permit to Work General Permit to Work Good Neighbour Checklist Hot Works Permit to Work HV Electrical Isolation Permit to Work Noise Control Checklist Permit to Work in Confined Spaces Pollution Control Checklist Waste Control Checklist Health and Safety Management overview Audit Section Importance Project Plan Gantt chart High Safe Systems of Work High Risk assessments High Fire risk assessment High Method Statements High Plans of installations High Plan for external areas High Training and information High Management Meetings High Asbestos Survey High Appoint Structural Engineer for inspection of building High Health and Safety Policy Document and Arrangements Policy

More about The Health And Safety Plan For The Decommissioning Of Existing Plant Equipment

Open Document