1. The Health and Safety Plan for the decommissioning of existing plant equipment and installation of new plant equipment.
Principal Contractor
Principal Designer
Client
CDM Standards and Objectives for the Project
Safety Standards and Objectives for the Project
The Principal Contractor Site Safety Policy Statement
2. Summary Project Information
Project Name
Project Address
Project Duration of works
Description and Scope of Works
Form of Contract
Existing Environment
Previous / Current Land and Plant Use
Surrounding Area
Existing Services
Existing Structures
Existing Plant Equipment
Ground Conditions
Existing Traffic Systems
3. Management Team Organisation and Responsibilities
Management Team Function
Project Organisation and
…show more content…
endixes should contain the following;
Site Layout
Site Specific Safety Induction (including site rules)
Notification of Project
Fire Safety Plan
Emergency Procedures
Project Programme Plan
Design Plan
Types of documents, records and general forms to be included;
Access Equipment Inspection Record
Forklift Truck Checklist
Induction Aid
Training Record
Risk Assessments, safe systems of work and method statements
Control of Substances Hazardous to Health and COSHH Assessments
Personal Protective Equipment Issue
Workplace Inspection Form
Contractor Approval Questionnaire
Contractor Control Documents and Records;
Construction Site Inspection Checklist (Builder)
Construction Site Inspection Checklist (Electrical)
Contractor (Sub) Approval Questionnaire
Contractor (Sub) Control Document
Excavation Permit to Work
General Permit to Work
Good Neighbour Checklist
Hot Works Permit to Work
HV Electrical Isolation Permit to Work
Noise Control Checklist
Permit to Work in Confined Spaces
Pollution Control Checklist
Waste Control Checklist
Health and Safety Management overview
Audit Section Importance
Project Plan Gantt chart High
Safe Systems of Work High
Risk assessments High
Fire risk assessment High
Method Statements High
Plans of installations High
Plan for external areas High
Training and information High
Management Meetings High
Asbestos Survey High
Appoint Structural Engineer for inspection of building High
Health and Safety Policy Document and Arrangements
Policy
State why and when health and safety control equipment, identified by the principles of protection, should be used relating to types, purpose and limitations of each type, the work situation, occupational use and the general work
| State how the health and safety control equipment relevant to the work should be used in accordance with the given instructions.
Health and Safety control equipment identified by the principles of protection which should be used relating to the use of first and second fixing
5.2 Avoiding hazardous manual handling , conducting a full risk assessment, reporting immediately any difficulties adhering to agreed working practices and using equipment correctly.
1.1- Describe how current health and safety legislation, policies and procedures are implemented in the setting.
Describe how current health and safety legislation, policies and procedures are implemented in the setting.
1.1 Describe how current health and safety legislation, policies and procedures implemented in the setting
1.1 Describe how current health & Safety legislation, policies and procedures are implemented in the setting.
Describe how current health and safety legislation, policies and procedures are implemented in the setting
Making arrangements for the planning, organisation, control monitoring and review of health and safety measures.
Criteria 1.4: State why and when health and safety control equipment, identified by the principles of protection, should be used relating to types, purpose and limitations of each type, the work situation, occupational use and the general work environment, in relation to:
In order to plan a healthy and safe environment and service you need to look at a wide variety of aspects but there are sources of current guidance that can help you with this.
| Describe how the health and safety control equipment relevant to the work should be used in accordance with the given instructions.
Develop health and safety and risk management policies procedures and practices in health and social care (M1)
Just recently, All Weather Windows Commercial Ltd., has purchased a smaller company with a large glass manufacturing facility. This smaller company has approximately 150 employees that now work under our organization. Throughout this assignment, I will focus on basic safety initiatives to implement into the new facility. The reason I chose to focus on implementing basic safety initiatives, is based on the fact, this new facility is populated with many plant workers and has to now adopt my organization safety program.